Loading...
Correspondence City of Tigard, Oregon m 13125 SW Hall Blvd. ® Tigard, OR 97223 September 4, 2008 ® ® RE: MECHANICAL 1 GARD Project Information ;,.! -,; Building Permit: MEC2008 -00447 Construction Type: 5B Tenant Name: TVFR Station Occupancy Type: S -2 Address: 12617 SW Walnut Rd. Occupant Load: 91 Area: NA Stories: 1 The plan review was performed under the State of Oregon Mechanical Specialty Code (OMSC) 2007 edition; and the State of Oregon Fire Code (OFC) 2007 edition. The submitted plans are approved subject to the following. 1. Ductwork shall be supported in accordance with Sheet Metal & Air Conditioning Contractors National Association, Inc. (SMACNA) 2. Each appliance shall be provided with a shutoff valve separate from the appliance. The shutoff valve shall be located in the same room and within six feet of the appliance served. Access shall be provided to the shutoff valve. C409.5 OMSC 3. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. 301.7 OMSC 4. Appliances shall be accessible for inspection, service, repair or replacement without removal of permanent construction. 306.1 OMSC 5. Manufacturer's installation instructions shall be available on the jobsite at the time of inspection. 304.1 OMSC 6. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. 307.1 OMSC 7. Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall be connected to a fire alarm system or shall activate an audible and visible alarm at a constantly attended location. 606.2, 606.4 & 606.4.1 OMSC 8. Suspended -type unit heaters shall be supported by non - combustible elements that are designed and constructed to accommodate the weight and dynamic loads and shall be sway braced. 920.2 OMSC Phone: 503.639.4171 0 Fax: 503.684.7297 ® www.tigard- or.gov 0 TTY Relay: 503.684.2772 9. Prefabricated refrigeration panels installed in Oregon shall bear one Oregon insignia of compliance located on the exterior side of the panel located nearest the door prior to final inspection. 10. Every refrigerant- containing part of every system that is erected on the premises shall be tested and proved tight after complete installation, and before operation. Tests shall include both the high and low- pressure sides of each system. 11. Provide drawings for attachment of all equipment on the roof showing connection of any curb to roof and equipment to the curb. Provide calculations and drawings showing seismic attachment of all equipment with a weight 4001b or greater. 12.A Performance Test shall be conducted upon the type 1 hood at completion and before final approval of the installation of the ventilation system. The performance test shall verify the rate of airflow to be in compliance with the approved plans. 507.17 OMSC The exhaust and make -up air system shall be electronically interlocked to ensure that the make -up air is provided whenever the exhaust system is in operation. 508.1 OMSC An automatic fire suppression system shall be provided to protect the surface of the heat - processing appliances and the exhaust system serving the appliances. 509.2 OMSC 13. Fire and smoke dampers shall be provided with an approved means of access, large enough to permit inspection and maintenance of the damper and its operating parts. Access points shall be permanently identified on the exterior by a label. Access doors in ducts shall be tight fitting and suitable for the required duct construction. 14. Inspector may require additional sway bracing at the final installation inspection. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectf ly, AP an Nelson, Senior Plans Examiner (503)718 -2436 dann @tigard -or.com