Loading...
Report S 1 02005 -0378" No 0766 P. 2 Q�2905 10 :51AM � a /029:34 5�✓ 4/elhA.'en Cfi G ; 1C t119Inc(tin9.1k Real World Geotechnlcal Solutions Investigation 6 Design • ConstrUCtlon Support September 8, 2005 GeoPacific Project No. 04 -8608 Terry Kinney / Jim Cavanaugh West Hills Development 15500 SW Jay Street Beaverton, Oregon 97006 f ax No (503 6141 -7661 Copy: ' :.n : o d LDC Desi s emu • l c. a . t -645-55 e A i ! a ..c G Constructio t • _ .. 50. ; • Subject Summary Report of Geotechnical Observation and Testing Arbor Summit Tigard, Oregon References: 1. Preliminary Geotechnical Engineering Washington o County, Oregon, Property, 12780 SW Bull Mountain Road, GeoPacific Engineering, Inc. report dated February 17, 2004. 2. Preliminary Geotechnical Engineering Report, Arbor S tf u ic E Inc lsll Mountain Road, Washington County, Oregon, report dated May 24, 2004. 3. Rockery Wall Analysis and "Lock +Load" Wall Design Parameters, Arbor Summit, Tigard, Oregon, GeoPacific Engineering, Inc. letter report dated August 13, 2004 4. Wet Subgrade Pavement Section, Arbor umt 8, 2 Tigard, Oregon, GeoPacif c Engineering, Inc. letter report dated November 5. Geotechnical Engineering Report, Bull Mountain Road Improvements at Arbor Summit, Arbor Summit Subdivision, c. letter Road, report dated 12 2064 Oregon, GeoPacific Engineering, GeoPacific Engineering, Inc. (GeoPacific) conducted testing ro improvements S�.eation services for Arbor Summit Phases 1 and 2. The project site and proposed The shown on the attached reduced grading plan sheet prepared by LDC Design Group, I I c The ted evelopment consists of grading 42 lots (Lots 1 -42) for single-family improvements that include new streets and driveways, and d an d 9 fr in utilities. T project Load also included construction of several rockery walls up type wall up to about 11 feet high, in the southeast corner of the property. Tel (503) 598-8445 7312 SW Durham Road Fax (503) 598 -8445 Portland, Oregon 97224 ro5 1051AM No. 0766 P. 3 September 8, 2005 GeoPacific Project No. 04 - 8608 GeoPacific performed geotechnical engineering studies for the site (References 1 and 2), which include geotechnical recommendations for the project, Reference 3 includes recommendations for rockery retaining wall design and construction, and soil parameters for use by others in design of the Lock +Load retaining wall. Results of field monitoring and density testing for the Arbor Summit development are attached to this report. In addition to providing a summary of geotechnical observation and testing performed to date, this letter report provides recommendations for residential structure construction. SITE PREPARATION AND FILL PLACEMENT Prior to fill placement, areas to receive fill were stripped and proof-rolled. Stripped materials were removed from the site. Based on the grading plan and our field observations, engineered fill was placed on the following lots: • Lot 6 • Lots 14 — 25 • Lots 35 — 37 • Lot 41 The remaining lots were planned as either cut lots or near previously existing grade. Engineered fill consisted of on -site native silt, moisture conditioned to facilitate compaction. During placement of the engineered fill, we performed periodic density testing to verify the relative compaction of fill materials. The compaction specification for engineered fill was a minimum of 95 percent of maximum dry density based on Standard Proctor (ASTM D 698). Density test results are attached. Due to wet soil conditions, some of the engineered fill was cement treated to facilitate compaction. From our observations and test results, fill soils were adequately compacted and are suitable for spread foundation support under dry weather conditions (see Structural Foundations section below). RETAINING WALLS GeoPacific performed wall stability analysis and provided construction recommendations for rockery walls on the project (Reference 3). During construction, we monitored rockery walls for keyway soil suitability, rock size and placement, wall batter and subsurface drainage. Based on our observations, the rockery walls on site were constructed in general accordance with the geotechnical recommendations. Lock +Load walls on the project were designed by others, with soil parameters for design . provided by GeoPacific (Reference 3). The wall extends southeast of Lots 14 and 15, above the new cul -de -sac for SW Terravicw Drive in the southeast corner of the site. 04- 8605 -Artror Summit Final 2 GEOPACIFIC ENGINEERING, INC.