Report SEP -27 -02 FRI 07:56 AM P.02 _ , S 17 - c•-e, l Lf LaVielle Geotechnical, P.C. 2313 NE Alameda Portland Oregon 97212 (503) 287 -0511, Fax 282 -7671 Sepotember 3, 2002 Our ref: 02- 1707.012 Mountain Stone Construction, LLC CCB - 124854 Portland, Orego;i HECENtL, Attention: Linn Musser SEP 2 7 2002 RE: ROCKER CONSTRUCTION MONITORING Li 9 ui LIU/VJ 14111 SW WAGONEER. PLACE E... --D TIGARD, OREON FILE G C Dear Sir: We have monitored the construction of the rockery :t 14111 SW Wagoneer Place Tigard, Oregon. The bearing, rock size, and face in' 'ration are in accordanc- th our recommend.atioils, In our opinion the contractor has constructed the rockery in the backyard of this property in the substantial accordance with the project plans and specifications. Where we are winnable to discuss the project. Please call if you have questions. Sincerely, LaVIELLE GEC l'1; (`TINIC:AL, P.C. C 64 Craig C. LaViel:c:, P•E., Principal • Salem Carlson Geotecf ical 1 . I? B o °2 3814 60 Hudso WE o Office A Dikiision of Carlson Testing, Inc. Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Geotechnical Consulting Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 Construction Inspection and Related Tests FAX (503) 670 -9147 FAX (503) 589 -1309 FAX (541) 330 -9163 - ozro � Final Summary Letter November 30, 2004 Mr. Leif Hanson 14111 SW Wagoner Place Tigard, Oregon 97224 Final Letter of Geotechnical Construction Observations Hanson Residence Pool 14111 SW Wagoner Place Tigard, Oregon 97224 CGT Project G0202019 Carlson Geotechnical (CGT) served as geotechnical engineer -of- record for the Hanson Residence Pool located on Wagoner Place in Tigard, Oregon. Carlson Geotechnical assumed the role of geotechnical engineer -of- record on August 23, 2002. Our site visits were completed on an on -call, part-time basis between the dates of August 23, 2002 and October 4, 2002. • Site Stripping and grading: On August 23, 26, 27 and September 5, 2002, CGT observed site stripping and grading (excavation) for the proposed project. Based on our field observations, the site was stripped and graded in general accordance with our recommendations. • Wall backfill and drainage: Based on our field observations of September 19 and 20, 2002 and our density testing of October 1 and October 4, 2002, the wall backfill and drainage has been installed and prepared in general accordance with our recommendations. Based on our observations, as documented in our field reports, and to the best or our knowledge, within our scope of work, the above geotechnical summaries accurately reflect our observations. Our services were provided on an on -call basis, in which we relied on the contractor to contact our office for the scheduling of our services. We cannot be held contractually responsible for those items, if any, that we did not observe or test. Sincerely, CARLSON GEOTECHNICAL 14" N g 1,2, #15-: t8� A., REGOt — tr T.17, ki tERLeY -anne M. Ni mer, P.E. 1 :1231.041 for eot hnical Engineer Doc ID: P: \GEOTECH \PROJECTS\2002 Projects \hanson pool - COS \Final Letter.doc