Loading...
Permit / \,,, �.., r '. CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT f I: ` � 08/2 COMMUNITY DEVELOPMENT Date Permit #Issued: : FPS2009 -00079 T,1 G , RD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 7/2009 Parcel: 25101 CA00200 n Jurisdiction: Tigard Site address: 7904 SW HUNZIKER RD Subdivision: Lot: 0 / Project: Spec Space / Project Description: Cap (9) fire sprinkler heads, add (3) heads and relocate (4) heads. Owner: FEES WALL STREET INDUSTRIAL LLC & Description Date Amount 7000 SW VARNS ST PORTLAND, OR 97223 Permit Fee - COM 08/25/2009 $62.50 12% State Surcharge - Building 08/25/2009 $7 50 - PHONE: Plan Review - Fire Life Safety - COM 08/25/2009 $25 00 Contractor: VIKING AUTOMATIC SPRINKLER CO 3245 NW FRONT AVE PORTLAND, OR 97210 PHONE 503- 227 -1171 FAX 503 - 227 -1552 Type of Use: COM Class of Work: ALT Type of Const: VB Occupancy Grp: B Height: ft Stories: 2 Commercial Sprinkler System: Sprinkler Required: Yes Sprinkler Type: Wet Standpipe Required No Hazard LT , • Density 0 Design Area: 0 K Factor. 5 6 Commercial Fire Alarm System: Fire Alarm Required Alarm Type Pull Station Required Smoke Detectors Req: Battery Calcs Provided Cut Sheets Required Total $95.00 Valuations: Required Items and Reports (Conditions) Sprinkler Valuation 1650 Residential Square Footage: 0 Fire Alarm Valuation. 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law All work will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance, or , irk is suspended for more the 180 days ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utili o , otification Cen : Those rules are set forth in OAR 952- 001 -0010 through OAR 952 -001 -0100. You may obtain a copy of the rules o- direct questions to OU . by - g 503 246.6699 or 1 800.332 2344. -sued By: / ,/ /e Permittee Signature: Call 503.639.4175 by 7:00 a.m. for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Fire Protection System 9 5K � � (t Building Permit ApplicatioiR E� \/E Iolr l lc l , ���1 Y , - . - -- , . .- Received IN City of Tigard AUG 2 5 2009 Date /B �� Permit No X1,00 ° 1 3125 SW Hall Blvd ; Tigard. OR 97223 Plan Revie �� 6 Phone. 503.639 4171 Fax 503.598.1 OF q �r Date /Bv i� � Other Permit T I G KD Inspection Line 503 639 4175 GI OF I IG A RDD�1 Date Ready /Bj• pp 0 See Page 2 for Internet www.tigard-or gov BUILDING DIVISION Notified /Metiod - p iff / � ` �m Supplemental Information _, IQ/ Ly L TYPE OF WORK , REQUIRED D A : I- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed Indicate the value (rounded to the nearest dollar) of all igj Addition/alteration /replacement ❑ Other. equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I - and 2- family dwelling JR Commercial /industrial Valuation: S ❑ Accessory building ❑ Multi - family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms. 79e L/ JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address. '7 2�f � 14,4 Z I k.i2 po New dwelling area. square feet City /State /ZIP: — I G/I;e' s 012 97 ZZ'S Garage /carport area: square feet Suite/bldg. /apt. no.. Project name: p A f2.e `_ _ . Covered porch area: square feet Cross street/directions to job site. . � Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: I Lot no.: Permit fees* are based on the value of the work performed Indicate the value (rounded to the nearest dollar) of all Tax map /parcel no. equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. 411, QFA►. e-. r O/2 �ee , ,(...) Valuation: S !‘ro �� Existing building area square feet /70.4e /vim.,, DF.c� 7a , g Pk �� LI CA - at �� New building area: square feet ❑ PROPERTY OWNER [' TENANT Number of stories: Z Name: PHIS Z 6 Type of construction - Address: 60 ( z Zt i .. - Occupancy groups: C oile.: Cit /State /ZIP • '� , 5 1A-pZ� 6f2. Q) 2' Existing: Phone: (,p 5--9 7 _ zee ZS Fax: ( ) New: 0 APPLICANT ,A ❑ CONTACT PERSON NOTICE Business name: ; /+ (sLI�t!o NtuTQ i.tAUcYI c MLt fJ([ (FIB All contractors and subcontractors are required to be Contact name:"pf'wfU � licensed with the Oregon Construction Contractors Board t'�� "�da under ORS 701 and may be required to be licensed in the Address: 3245 Nc.a.) Qp#4.l% At!/ jurisdic '.. ' ^ lc wo • : -' i ..erformed. If the City/State/ZIP: n q Z . op ican _is_exempt from licensing, the : •wi g reasons /_P� /, ) A 6/2- / 7 apply: (/ l Phone: (1-, Z Z7 - //7/ Fax: ( ) Al / / / 1 it 0 /27r� / ', E -mail: alrVe.. 13tAT€VAP. w> tip p _— — _ l i • CONTRACTOR ' BUILDING PERMIT FEES* Business name: (Please re er o 'e e a e 16- t 6.=r--i IkTI� Q I ti3 (�P Permit fee. Address: 3Le45 Ai /,Qoiu / ,,4 o State surcharge (8% of permit fee): City /State /ZIP. R,Q MT_ 97ZlZ, o FLS plan review (40% of permit fee): Phone: (cps) Z17-//7 I Fax. ( ) (Due upon application.) CCB lie.: 60 3 ? Total permit fees: Authorized signature: ��� Amount received: 15, C This permit application expires if a permit is not obtained Print name &J : J ` r N e..1 V'-LS (Q 9 * within 180 days after it has been accepted as complete. Fee methodology set by Tri -County Building Industry Service Board i \Bmlding\Permns\FPS- PermnApp doe 03/23/06 440- 4613T(11/02/COM/WEB) • City of ,'Tigard: Fire Protection Permit Checklist Page 2 - Supplemental Information Describe work to be done: 1.) ❑ New 2.) Modification to sprinkler heads only: ❑ Addition ❑ 1 -1 0 heads: No plan review required. ❑ Alteration ❑ 11+ heads: Plan review required. ❑ Repair Number of sprinkler heads: Additional description of work: Type of System (Complete A, B, C or D as applicable): A.) Commercial Sprinkler ❑ Wet ❑ Dry Additional Standpipes Information: Hazard Group Density Design Area K. Factor Sprinkler Project Valuation: $ B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ • C.) Fire Alarm Submittal shall Battery Calculations ' ❑ Yes include: Individual Component ❑ Yes • ' Cut Sheets Fire Alarm Project Valuation: $ D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $187.50 2,001 to 3,600 5232.50 • 3,601 to 7,200 5292.50 7,201 and greater $381.50 Sprinkler Project Square Footage: sq. ft. • Fire Protection Permit Fees Project valuation subtotal (see A, B & C above): $, Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (8% of permit fee): $ FLS Plan Review (40% of permit fee): $ - TOTAL: $ Plan review requires a completed application and 2 sets of plans at submittal. Plan review fees are required at submittal. "New" fire protection systems require that plans bear the original seal of an Oregon licensed fire suppression engineer, or NICET level "3" technicians. - P \OREGON JOBS \Penmt Applications \ City of Tigard Permit App doc 2 l 1 J. J. J. ,..7/11l1/ LEJULJZ coRiciiNAL City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information L) 0 New 2.) Modification to sprinkler heads only El Addition E 1-10 heads: No plan review required. to Alteration 0 11+ heads: Plan review required_ Repair Number of sprinkler heads: - 7 Additional description of work: •-• c •t: • . , . 7 l'i. , .t.3574 7 . • ," ,-; „ " 1" II Wet 0 Dry Additional Standpipes biformation: Hazard Group 1.-ovi#7 Density - Design Area K Factor Sprinkler Project Valuation: $ /4,52, Hood Project Valuation: I $ 47:7 Submittal shall Battery Calculations 0 Yes include: Individual Component 0 Yes Cut Sheets Fire Alarm Project Valuation: $ ; Square Footage: Permit Fee , 0 tO 2,000 $18750 2,001 to 3,600 $232.50 ---- ‘17,;C'''::": 4 ; 7 1:: 3,601 to 7,200 $29250 ; 7,201 and greater $381.50 ' • Sprinider Project Square Footage: gc1- . ..,:•7.41f ?::7 , Project valuation subtotal/see A, B & C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (8% of permit fee): $ FLS Plan Review (40% of permit fee): $ TOTAL: $ Plan review requires a completed application and 2 sets of plans at submittal. Plan review fees are required at submittaL "New fire protection systems require that plans bear the original seal of an Oregon licensed fire suppression engineer, or NICET level "3" technicians. \Builcling\PermitAFPS-PcirnicApp.doc 2