Report (2) OFFICE COPY DUPZ003roOOSo Proposed BAPS Temple Geotechnical Evaluation Report l Tigard Street Portland, Oregon Project No: P02 -0277 November 2002 RECEIVED rw -- -0o 0 S -6 ,F EB 0 4 2003 CITY OF TIGARD BUILDING DIVISION GeoSianidards Carporaltion Engineers and geologists raising the quality of consulting service in geosciences Project No. 00O2 -0277G November 27, 2002 • Mr. Paresh Patel BAPS Mandir P.O. Box 41160 • San Jose, CA 95160 Re: Geotechnical Evaluation for the Proposed BAPS Temple 11435 SW Tigard Street, Portland, Oregon Dear Mr. Patel: At your request, we have completed the geotechnical evaluation for the referenced site that you authorized in November 2002. Results of our study are summarized in the following report. Site Characterization We drilled four soil borings (B -1 to B -4) in the proposed building and parking areas. Site conditions are similar between the borings. The general soil profile encountered in these borings are discussed below: Topsoil — Approximately 4 to 6 inches of topsoil is present throughout the site. Native Alluvial Silt — Topsoil is underlain by generally medium stiff to very stiff silt extending to a depth of roughly 51.5 feet. Based on our geologic literature review, this soil stratum is known to extend to depths in excess of 60 feet below existing site grades. Troutdale Formation - Native alluvial silt is underlain by Troutdale Formation consisting of interbeds of sandstone, siltstone, and claystone. Based on our geologic literature review, this formation is known to extend to depths of 300 to 500 feet below existing site grades. Westlawn Professional Building, 1225 NW Murray Blvd., Suite 102, Portland, OR 97229, Ph: 503 -646 -9069, Fx: 503 -646 -8976 13215 -C SE Mill Plain 8/No. 561, Vancouver, WA 98684, Ph: 360 - 882 -6618, Fx: 360 - 256 - 8567 www.geostandards.com Project No: P02 -0277 November 27, 2002 Page No: ii Groundwater — We encountered groundwater seepage at depths of roughly 17 feet below existing grades. We anticipate that the groundwater table may rise during months of peak runoff. Variations in groundwater levels should be expected seasonally, annually, and from location to location. Based on our review of Soil Conservation Survey (SCS) book on Washington County, and our knowledge of site vicinity area, in our opinion, perched (seasonal high) groundwater table may be encountered at a depth of 1 foot to 2 feet below existing site grades. Design Recommendations Based on the results of our study, we believe the site is suitable for the proposed development, provided the following recommendations are followed. Foundations Because of the current site conditions, we make the following specific recommendations for site improvements: • We recommend that site earthwork construction occur during the dry summer months because of the potential for the presence of near - surface perched groundwater. We recommend, after topsoil removal from the proposed development area and extend a minimum of 5 feet beyond the development area, a GeoStandards representative should inspect and approve the subgrade. If earthwork is performed during wet weather, then we should be contacted to provide specific recommendations based on site conditions at the time of earthwork. • Grading fill may be placed after GeoStandards performs an inspection or proof -roll test and approves the subgrade for the placement of proposed grading fill. • All exterior and interior footings should be at least 12 inches wide and should extend to a minimum depth of 18 inches below finished subgrade in order to provide frost protection and to minimize punching shear failure. • A registered and qualified geotechnical engineer must inspect and approve the excavated footing subgrades prior to the placement of concrete or base rock. Provided these procedures are strictly followed, the proposed buildings can be supported on properly prepared subgrade or on structural fill using continuous and individual shallow spread footings designed Project No: P02 -0277 November 27, 2002 Page No: iii for following net maximum allowable bearing capacity of 2,000 psf. The allowable bearing capacities are intended for dead loads and sustained live loads and can be increased by one -third for the total of all loads, including short-term wind or seismic loads. Please refer to the attached report for a detailed description of our analyses and recommendations. Please call us if we can provide additional assistance or observation and testing services during design and construction phases of the project. We appreciate the opportunity to be of service to you on this project. We will continue to provide to you our services with highest quality standards. If we can provide additional assistance or observation and testing services during design and construction phases, please call us at 503- 646 -9069. Sincerely, anon („ ,� „1GINEF 4 16,590 ORE e`i" N ' :9 C 23 .Y4 0 <<A EXPIRES 12/31/6! Marcy Boyer, MS, PE William Burns, MS, GIT Sam Adettiwar, MS, PE Senior Engineer Project Geologist Principal Engineer \\Server \mainfolder\2002 Reports\P02 -0277 BAPS Temple \P020277geotech.doc OFFICE COPY DUI) 2. e03 - 000S Site - Specific Seismic Hazard Evaluation Report I/365 BAPS Temple 14435SW Tigard Street Portland, Oregon Project No. P02 -0277S November 2002 RECEI VE FEB 0 4 2003 cir y of °JILDING DIVISION Engineers and geologists raising the quality of consulting service in geosciences IIeoSlandards Coiiioration Project No. P02 -0227S November 27, 2002 Mr. Paresh Patel BAPS Mandir P.O. Box 41160 San Jose, CA 95160 Re: Site - Specific Seismic Evaluation for the Proposed BAPS Temple 11435 SW Tigard Street, Portland, Oregon Dear Mr. Patel: We have completed a site - specific seismic evaluation for the referenced project. The purpose of our services was to perform a site - specific seismic hazard evaluation for the referenced project. Specifically, our scope of services generally conformed to the requirements of relevant Oregon Structural Specialty Code (OSSC). Results of our evaluation are described below. Subsurface Exploration Results We drilled four Standard Penetration Test (SPT) borings at the site in the proposed construction area. The general soil profile encountered in these borings is discussed below: We drilled four soil borings (B -1 to B -4) in the proposed building and parking areas. Site conditions are similar between the borings. The general soil profile encountered in these borings are discussed below: Topsoil — Approximately 4 to 6 inches of topsoil is present throughout the site. Native Alluvial Silt — Topsoil is underlain by generally medium stiff to very stiff silt extending to a depth of roughly 51.5 feet. Based on our geologic literature review, this soil stratum is known to extend to depths in excess of 60 feet below existing site grades. Project No. P02 -0227S November 27, 2002 Mr. Paresh Patel BAPS Mandir P.O. Box 41160 San Jose, CA 95160 Re: Site - Specific Seismic Evaluation for the Proposed BAPS Temple 11435 SW Tigard Street, Portland, Oregon Dear Mr. Patel: We have completed a site - specific seismic evaluation for the referenced project. The purpose of our services was to perform a site - specific seismic hazard evaluation for the referenced project. Specifically, our scope of services generally conformed to the requirements of relevant Oregon Structural Specialty Code (OSSC). Results of our evaluation are described below. Subsurface Exploration Results We drilled four Standard Penetration Test (SPT) borings at the site in the proposed construction area. The general soil profile encountered in these borings is discussed below: We drilled four soil borings (B -1 to B -4) in the proposed building and parking areas. Site conditions are similar between the borings. The general soil profile encountered in these borings are discussed below: Topsoil — Approximately 4 to 6 inches of topsoil is present throughout the site. Native Alluvial Silt — Topsoil is underlain by generally medium stiff to very stiff silt extending to a depth of roughly 51.5 feet. Based on our geologic literature review, this soil stratum is known to extend to depths in excess of 60 feet below existing site grades. Project No. P02- 0277Seismic November 27, 2002 Page No. 2 Troutdale Formation — Native alluvial silt is underlain by Troutdale Formation consisting of interbeds of sandstone, siltstone, and claystone. Based on our geologic literature review, this formation is known to extend to depths of 300 to 500 feet below existing site grades. Groundwater — We encountered groundwater seepage at depths of roughly 17 feet below existing grades. We anticipate that the groundwater table may rise during months of peak runoff. Variations in groundwater levels should be expected seasonally, annually, and from location to location. Based on our review of Soil Conservation Survey (SCS) book on Washington County, and our knowledge of site vicinity area, in our opinion, perched (seasonal high) groundwater table may be encountered at a depth of 1 foot to 2 feet below existing site grades. Site Characterization Based on the results of our subsurface evaluation, in our opinion, the soil profile at the site should be characterized as Type SE as defined in Uniform Building Code (UBC), 1997. Seismic Hazards Evaluation Based on the results of our investigation, it is our opinion that the site is generally not susceptible to site - specific seismic hazards such as liquefaction, subsidence, fault rupture, lateral spread, landslide or slope stability. Even though estimated site amplification is significant, unusual ground motion (during the postulated earthquakes) above the factors provided in the UBC design procedure is not expected. We have estimated a design PGA of 0.30g for the site. Based on the results of our analyses, in our opinion, the lateral earthquake loads calculated using the UBC equivalent static design methods would adequately represent the anticipated peak dynamic loads expected due to postulated earthquakes. Therefore, for any new construction at the site, UBC equivalent static design based on SE soil profile would adequately represent UBC recurrence interval earthquake conditions. Project No. P02- 0277Seismic November 27, 2002 Page No. 3 General Conditions We have completed this study in accordance with generally accepted geotechnical engineering principles and practices. No warranty is expressed or implied. GeoStandards is not responsible for the independent conclusions, opinions, or recommendations made by others based on the information presented in this report. Please refer to the attached report for a more detailed summary of our analyses and recommendations. If we can provide additional assistance or observation and testing services during design and construction, please do not hesitate to contact us at (503) 646 -9069 in Portland. Sincerely, Ge o St a/!d a/d s Como/Won �'\ PROf � ��',iIYE pp 1 % ,590 'I 0'[ GON 79 0 `LA M . EXPIRES 12I31/6S I Sam M. Adettiwar, MS, PE Marcy M. Boyer, MS, PE. Principal Senior Engineer Attachment: Site- Specific Seismic Evaluation Report F:\2002 Reports \P02 -0277 BAPS Temple\P020277Seismic.doc , t .. - • • - • ' ' • 1 i '''--. - • • ' • ' -- - - -, 1.r. ■2: .::.:'.•: ::: --sf -1'0;4: 0 pL &Act( rz qv I 4- • ,n;1, ,-:, rr.:•,,„, „,,;•:, t.„-,.,:. ,.,....-. wit'l Approval of Silo ar4wiAgstineanp,ittieCatifi Iccations and A ?Gilt Il- i AS Crik. design criteria 11' e keen jAy.i.awAd:-anchapprovegivo%.: you must -7-14e. L9cro * LoA147 verily and approve 4:4,413.c4:5.ipn.wgdrtry§(sietaltstanitittiEntiti . Trusses will be ri ang "*.' `" "3 5 i4e)c.40, rc I qa5 Pr /pt. 0 7 I CI A 111., .1.7,1 ( S,Yeng ta'orkraticn or ocosoed ON tkr•J 1 5 o -o LkE.P..) c an' tsc;.!liv c'. cchstr_zjen: Doordhadng hls or her work ...131 t', ot a!I ctner trades and (e_E AV.. ta,..YZ, L f----6 Signature DATE: purfonnlny all work in a sato and satisfactory 171/1111101. ( 0) S 0 o 1161 1 1 10 10 2 4 0 BRIGGS ENGINEERING, Inc. I S • 2 04 I Date - ( I F g-CID r)) ii L °AMC I-A 12 4-A 7 ) e- 13 cc.. N..) TAit--ti "--) I 1 4111 ! BY J i C-C)1/4)tir ' ig• PLEA se ee /11-...) - - • - s 7- to . 1.,..-. l ' --- Z..==.■■■-•-!rrro---•-•.-+-- , u rr17 4 1104 1290 230"0 L*-- 017"17 - t: • ..---.,.. ij r3 i:3 I 6.1r° ' I CCIN , SW Cork: t'l ''''',. ? j i ^8. BOO, 031 P P ' 6 P. _...r- 1310,M) • N s, 4 , - ....' .N i -- e"'''' r • . 7... t9 g '‘;,• ( P A _ Q e /1/4/ Tray 0106 1111. ft .--•- _ - )- -1 2 VI 1 -Poe '7, '4 ' FO• c.. ,..1- - . Pl. _L_L l' BP 10 . 01» . • 'A A ,'-'•( A r .`2 sp.71 . P 55 % _L...L. rut :2 .,: .,T E... as x ,,....... < ,v, co 0 v -- FO . ve ° - '. / . .¢. 7 4 '‘ i •C ¢ •1s4' < 0 st ?.:7 "4 :f. ' A E CC .c 6 .-.- • 6-1-6 .6( « « A5(71 1• . . " Al (6) a Al (4) • A3 (12) A4 ( ) A3 ( ) « < < 1-11 I 2 BPI, I V. m i" 1 6P17 - - I , ' I !::: .2 ci. i at 8008 , , 1-14 ■ BP .1 5- i .. v.. .7-7 .. 7 1 15 4 ,, 0 6- 6.. rib 6 o „, F1 ' ' b 1r- if, 6 . 1 , % •94 ' '' -- F16 OP13 19 616 13120 i3 i I. ; a 13 "0 4'0" BP25 II( 3) . OP25 0126 -- •.., V- i i•3 -- 3126 1-11 0117 i 2800 21.' 111 2800 F2 op „ O 1,11 ' 8008 I 2 8-2J . l'PO : I t ------ 0111 5 Fll'30 BOA -F26- 0131 En . 10 7- ,, C 0 II , ,,,I Fa : Fr.' it 6'. '0 )ic 970 , ,,.< 670 >,, 3030 8-26 _ 800 A- -L, --F7• 0 -< 7=-• [1400sig I 14005 8-213 1 • 6/38 El .__ - I . .? L ,,,,, L .._„ti 4 1-2U Z 0 7._ I 'II R - 11 - im 0157 16) 6 . B136 x_ 0 3"4 M 1 1■11, -.6.- g a .7_ cr) :.,1 0157 (20) /57 (91 -' '6: 1-34 < 6 .111 ,, ..,, S g 9-' 1-35 f rt > 0 . . h ■ - - :' -- F3 . • I= Mil 0 -sr 6190 0 0 ".' ' f-r37-- 2100 . ' , 1 ,J . . 1, t-3, . 086 z 1111113101 13- eoos F48 __ .: - ... - 11111..---F31 0 _749cr: - 1 q 4 13104 1 r 0. ' ' :" I-45 ::: I F47 . I ''''g! 15 "0 -- F-40 108 ),,.; „. 2 - • ( 1 ' 1 . ' . -. 1 1 , 1 ■ ROC, , I _..W r ., :-.. -• 1 4. , ! F43 - I - I I 12 1.13 < < 1162 B1 (7) 0 V' 6 0 . Cl < . 11-°-*r° • F45 . co m m co co co m co co co co . E27 (4) . E,7,112 B1 (4) .. ■■......,-. BM L E_.017 . i . Pal 131601 - B - 43 '8 41Z: 131371 4'0'0 II /Mt- 30112 t-48 1100 0 co co co co op , F < q I A (12) < < < A7 (6) 80.4 ELEV _ 5 ... I I -A • - 51 7 o - 7:7 - = -7-'-- - , ''''---- B 169 0 I ''... IMIEMMiliV.. ■ACJIA ' ' BPS. 01 -6- BP59 16) B1 Om BP) BP71 8- 54 --F6 vI3 - F5 - 4 - ,,,,,, 1 r- r s pc 800 1 1 ...) 131 1 i' 13P) l• bb Y - - - 206 p70 .15• 1 h miI 010 ( F= 1.=.. - .(5. Cl (21) L Illiek F6 1-S9 (N1 0.2 0 I 0 P 0 BPS ' 6 i l • L .,), '1. ' g 1111 166 1314 1:j2 BM MI MIME. MOMIIMMOILEM IMMINEEMONOWT MIMI, EIS1 13D65 y_ 0_9" 19' 1,4 9 94 A l6 0162 161 101 Y s; 26 [4 1 e v 1 ' 1,2111151 1 im ,.; 011114 411111 4 >1 rc 211'4 2011"12 201E12 211'4 4 illM . ---1 .J: , I _ - • 111111.1•1111 .- da 111■17111.0.11117..igl MEME111111111111111111r; _ - A ''), ...„ 4 _____ p. ,, . iii p,-, . ...- 1 - 1 . I_ .---,.. ,- 12 lig . -j IT 1. - ___ 3440 >I . I il 1 rE _11 - . 3. 1 r 1..,3 IIIIIIPP1 11 I- - .14 -- - - --- 1 - _J6 - --I' /41 l< ' .--. - 10 1136 - I 00. - 1 .J617 frIE L. js ,„ ... ..... __.1..._1_ ..I_.Jii_r_. _ _...1___ J41._ Ti °S i ES _ - J41 __ _-_- I kitl 1 h .J11 rci"& . 7 411 - MI 1 , - .. , 11.1.IIIIIIIII 'S,U. City of Tigard 212' ■2 21'2'12 C 1 )1 r > I Approved Plans Byi/AP--- Date., DUI 2- °03 - 000) '0 BUILDER: ....... N .... tu„i.P.a.e.:ifi^ r .Q......... 29336 Airport Road Eugene, OR 97402 JOB AD 11365 SW Tigard Street (541)688 Tigard, OR 97223 theTRUS Sco. inc. MODEL B. A. P. S. Temple West 66111(118 REVISION REVISION DATE: 1.)6.19 IA WWW.THETRUSSCO COM 6,16 -111,63,3, NIS 1/23/0.1 .1W 11065 • a V 1.1