Loading...
Report From: 11/06/2007 12.04 #026 P.002/002 Northwest Testing, Inc. T A Division of Northwest Geotech, Inc 9120 SW Pioneer Court, Suite B • Wilsonville, Oregon 97070 503/682-1880 FAX, 503/682 -2753 November 6, 2007 Project No. 1851.1.1 City of Tigard, Oregon Permit Center Building 13125 SW Hall Boulevard Tigard, Oregon 97223 Attention: Brian Blalock Building Official Subject: Summary Report of Construction Monitoring and Special Inspection Office Building Addition Vial & Pham Building SW Varns Street q Ti g S ard, Ore gon flU , da 1 P ermit No. BUP 2006 -00441 Copy V Dear Mr. Blalock: As requested, Northwest Testing, Inc., (NTI) has provided construction monitoring /special inspection of the Vial & Pham Office Building Addition. Inspections were provided on an on -call basis. Our construction monitoring services included the following activities: Reinforced Concrete • Reinforcement Placement • Formwork • Concrete Placement • Fresh Properties Testing • Compressive Strength Testing A complete record of our inspection reports have been forwarded to the project team and the City of Tigard Building Division throughout the course of this project. To the best of NTI's knowledge, based on our inspections, the structural aspects of the project have been constructed in substantial conformance with the approved drawings, specifications, applicable provisions of the State Building Code, and the inspection methodology and acceptance criteria established by the project designer(s). This opportunity to be of service is sincerely appreciated. Should you have any questions, please contact the undersigned. Respectfully submitted, NORTHWEST TESTING, INC. 41411,44A iZ A.:(4.1" Michael A. Ginsbach Construction Services Manager Copies: (1) Addressee (facsimile only) (1) Fohe (Maui) Ngalu, Maui Vial Pham, LLC (facsimile only) (1) Luke Lee, C.K. Engineering (facsimile only) (1) Stuart Gordon Straus, Stuart Gordon Straus Architects (facsimile only) Oo , non151851.11 Fuld Rawl tkxvDGK