Report From: 11/06/2007 12.04 #026 P.002/002
Northwest Testing, Inc.
T A Division of Northwest Geotech, Inc
9120 SW Pioneer Court, Suite B • Wilsonville, Oregon 97070 503/682-1880 FAX, 503/682 -2753
November 6, 2007
Project No. 1851.1.1
City of Tigard, Oregon
Permit Center Building
13125 SW Hall Boulevard
Tigard, Oregon 97223
Attention: Brian Blalock
Building Official
Subject: Summary Report of Construction Monitoring and
Special Inspection
Office Building Addition
Vial & Pham Building
SW Varns Street
q Ti g S ard, Ore gon flU
, da
1 P ermit No. BUP 2006 -00441 Copy
V Dear Mr. Blalock:
As requested, Northwest Testing, Inc., (NTI) has provided construction monitoring /special inspection
of the Vial & Pham Office Building Addition. Inspections were provided on an on -call basis. Our
construction monitoring services included the following activities:
Reinforced Concrete • Reinforcement Placement
• Formwork
• Concrete Placement
• Fresh Properties Testing
• Compressive Strength Testing
A complete record of our inspection reports have been forwarded to the project team and the City of
Tigard Building Division throughout the course of this project. To the best of NTI's knowledge,
based on our inspections, the structural aspects of the project have been constructed in substantial
conformance with the approved drawings, specifications, applicable provisions of the State Building
Code, and the inspection methodology and acceptance criteria established by the project
designer(s).
This opportunity to be of service is sincerely appreciated. Should you have any questions, please
contact the undersigned.
Respectfully submitted,
NORTHWEST TESTING, INC.
41411,44A iZ A.:(4.1"
Michael A. Ginsbach
Construction Services Manager
Copies: (1) Addressee (facsimile only)
(1) Fohe (Maui) Ngalu, Maui Vial Pham, LLC (facsimile only)
(1) Luke Lee, C.K. Engineering (facsimile only)
(1) Stuart Gordon Straus, Stuart Gordon Straus Architects (facsimile only)