Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
CITY OF TIGARD BUILDING PERMIT • DEVELOPMENT SERVICES PERMIT # - BUP97 -0539 ( 11 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639.4171 DATE ISSUED: 02 / 24 / 98 PARCEL: 1S 134BC -00600 SITE ADDRESS...: 12390 SW SCHOLLS FERRY RD SUBDIVISION MLP93 -0006 ZONING:C —G BLOCK LOT -002 JURISDICTION:TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION — CLASS OF WORK.:NEW FIRST - 1948 sf N: S: E: W: TYPE OF USE...:COM SECOND...: 0 sf PROTECT OPENINGS? TYPE OF CONST.:5N .... 0 sf N: S: E: W: OCCUPANCY GRP.:B TOTAL : 1948 sf ROOF CONST: FIRE RET ?: OCCUPANCY LOAD: 8 BASEMENT.: 0 sf AREA SEP. RATED: STOR.: 1 HT: 15 ft GARAGE...: 0 sf OCCU SEP. RATED:1HR BSMT ?: MEZZ?: READ SETBACKS REQUIRED FLOOR LOAD - 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL:N SMOK DET..:N DWELLING UNITS: 0 FRNT: 0 ft REAR: 0 ft FIR ALRM:N HNDICP ACC:Y BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR:N PARKING: 0 VALUE. $ : 185000 Remarks : Construction of a 1,948 square foot car wash automated car wash facility. Owner: • - - -- FEES - - -- THOMPSON/DAVIDSON LEASE type amount by date recpt 12475 SW MAIN ST PLCK $ 419.58 DRA 12/03/97 97- 301391 TIGARD OR 97223 FIRE $ 258.20 DRA 12/03/97 97- 301391 5PCT $ 32.28 DRA 12/03/97 97- 301391 Phone #: PRMT $ 645.50 DRA 02/24/98 98- 303569 CDCB $ 125.00 DRA 02/24/98 98- 303569 Contractor: -- — CDCP $ 125.00 DRA 02/24/98 98- 303569 ROBERT GRAY PARTNERS INC EROS $ 64.00 DRA 02/24/98 98- 303569 PO BOX 1016 ERPC $ 20.80 DRA 02/24/98 98- 303569 SHERWOOD OR 97140 ERPC $ 20.80 DRA 02/24/98 98- 303569 Phone #: 692 -4675 $ 1711.16 TOTAL Reg #.. : 000654 REQUIRED INSPECTIONS This permit is issued subject to the regulations contained in the Foot /Found Insp Tigard Municipal Code, State of Ore. Specialty Codes and all other Struc Steel Insp applicable laws. All work will be done in accordance with Re i n f Steel Insp approved plans. This permit will expire if work is not started Slab I n s p _ within 180 days of issuance, or if work is suspended for more Masonry Insp than 180 days. ATTENTION: Oregon law requires you to follow the Framing Insp _ rules adopted by the Oregon Utility Notification Center. Those Insulation Insp rules are set forth in OAR 952 -001 -0010 through OAR 952- 00101987. Shear W a l l Insp You many obtain a copy of these rules or direct questions to OUNC Gyp Board Insp by calling (503)246 -1987. Appr /sdwlk Insp Misc. Inspection Permittee Sign: aiW�n!)t:) cLA- 2..u.d/ Issued °y: l/ (( / • +++++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ Call 639 -4175 by 7:00 p.m. for an inspection needed the next business day +++++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ Commercial Building Permit Application jl� C.ry of �;gari 131 :5 SW Had Blvd Tlgar . OR 97:23 � (503) d39�tTt r obsite Addre$s: 123 S.t,V, 0L.ts, OFFICE USE ONLY FP t2-PT 1"t % O / 9_ . 1 1 . Tenant: Suite # Planck/Rec. # Valuation: 5 , 000 °?-' Permit* ' . 1 • : 0..-0•W la. . { 4 a z " Map & TL It �s - , .t Owner: f- 117MPSON. bAVIDSON L ,a. r; Approvals Required Address: 1241c, S.W. MAIN ST' Planning;` , , r - ` . - 11&,A r? 1 (7o.e.6.►aN.1 1'1223 .;.R..� • a a< En . . x ' .. � x. Telephone: A2214 �� - (� : Other / 1G �, Contractor =,.fs •_ iatailr; Address: Type of constr. V.I. N Telephone: Occupancy Class: p contractor's License # Sprinkler? Yes a (attach copy of current Oregon license) Sq. Ft Of Project: I, 6 147. 5 L � :ontact name & telephone: Story (1st, 2nd, etc.): 1 4 7T41 2 -1C Architect & Engineer: .iLr)L4 '�14.6,it �i Fnl zi t Proposed Use: CAlla VIA‘ 21 Address: 4? D. l3,x 2 37 4 Previous use: ---- "r i U+Al2 -b r1014 6 12 281 Note: Plumbing & mechanical plans must Telephone: (020 - -209'(p cofyrpT': JIM ANPPE4J be submitted at time of building permit application. JOB DESCRIPTION: • i . _ L Pi h , a r e. • P I L. i e M 4 • pplicant Signature & Telephone Number) ? eceived by: Date Received: •CC.m ,DST` 'C. 1 _ • 'ERMITa Account Description Amount Amt Pd. Balance Due Building Permit (BUILD) Plumbing Permit (PLUMB) Mechanical Permit (MECH) State Tax (TAX) Bldg. Plumb. Mech. • Plan Check (PLANCK) • Bldg. • Plumb. • Mech. Sewer Connection (SWUSA) Sewer Inspection (SWINSP) Parks Dev Charge (PKSOC) Residential TIF (T IF-R) Mass Transit TIF (TIF -MT) Commercial T1F (T1F -C) Industrial T1F (T1F -1) Institutional T1F (TIF -IS) Office TIF (TIF -0) • Water Quality (WQUAL) Water Quanity (WQUANT) Fire Life Safety (FLS) 44 si . Erosion Cntrl Permit (ERPRMT) Erosion Planck/USA (ERPLAN) Erosion Planck/COT (EROSN) TOTALS: 7/0 I:CCMT :.',CC .CS 1CJ 5 CITY OF TIGARD Tupc3 ,o 3 7 ^ ��� ;� DEVELOPMENT SERVICES IMPORTANT PERMIT NOTICE G RE: Plan Check J,( '' 7C' 4 12- DC THOMPSON /DAVIDSON LEASE 12475 SW MAIN ST TIGARD OR 97223 ' Parcel ° 1S134BC -00600 Site Address: 12390 SW SCHOLLS FERRY RD S u b d i v i s i o n . : MLP93 -0006 Block........ Lot: 002 Jurisdiction: TIG Zoning ° C -G Remarks: Site work permit for construction of a 1,948 square foot car wash facility. This letter is to confirm receipt of your Site Work or Building permit appli- cation which has been forwarded to the plans examiner today for review. As a reminder, the associate land use case(s) is /are: .2W o!0 Please be aware you are responsible for satisfying the conditions of the land use case(s) ano must submit plans directly to the appropriate staff person(s) indicated on your final order. Your building plans ARE NOT routed to the planning or engineering departments. You must satisfy the land use permit conditions independent of the building permit plans review process. After the building plans review process has been completed, your site work or building permit will NOT be issued without approval from the engineering and planning departments. If you have any questions regarding this notice, please contact me directly at 639 -4171 for further clarification. Sin erely, 1F Development Services Technician cc: Building Department Planning Department Engineering Department GI �11 ! 1 w DATE. 12 _ 1 d _ Q PLANS CHECK NO 7 PROJECT TITLE. COUNTYWIDE ?aC.tf‘ L/ V (A l;;c 4 TRAFFIC IMPACT FEE WORKSHEET APPLICANT (FOR NON - SINGLE FAMILY USES) MAILING ADDRESS. t Z�1 7S' '-,cu S� t.li1 CITY/ZIP /PHONE --11 A ,,,r_ Q� Z L� TAX MAP NO.. Ito � _ boo I SITES NO ADDRESS V LAND USE CATEGORY RATE PER TRIP 12-3'? j1„.A3 - �' I t .� r LIr(rl - ( R , RESIDENTIAL $ 179.00 -BUSINESS AND COMMERCIAL $ 45.00 OFFICE $ 164.00 INDUSTRIAL $ 172.00 INSTITUTIONAL $ 74.00 PAYMENT METHOD: CASH /CHECK CREDIT BANCROFT (PROMISSORY NOTE) INSTITUTIONAL ONLY DEFER TO OCCUPANCY LA U DESCRIPTION N O U E WEEKDAY AVG I WEEKEND AVG TRIP RATE (`� TRIP RATE 1 00 l BASIS: - \\(\9-- , IhCGU ro:�LS DI I -i c L col( wos i iuti(L - ` 1-&-- ¢br c�DSC WA h -k � �� 4 ts�nc rn + tau' JJJ JJ CALCULATIONS: T I F z & 5I s C o v d y P X c etiali j acv V r e e t -it f (ANA ose C gory T'1F ` nJo. eLkWr x 100 x 4 L 5.. SO "x 1DO = 700 Try s J W PROJECTiR FEE So0 FOR ACCOUNTING PURPOSES ONLY ADDITIONAL NOTES: \ c 1 2 ) ( - - v S" am-L_ CC )/ stea IrPA 6 s - n.Lc rAkitr vy CCL 1'S c l ur k t42 sett' a')' aru- 441(2_ 't s w cnS how `i ga_c_uv t_Sk (44s k You) caxS ccun ! toQ e..r u�aSGT , `'I are -CI v� vzI ct�. tv1A -- I �7I � T !fie vai -4� c C� Ihi° � �� - U k 4 ROAD AMT. z L P � z ,yao Cy I V� `- .K 1 . u ((.v �Vl . TRANSIT AMT$ 100 J I PFIf PAM If I:TIFWKST DOC (DST) • • December 10, 1997 CITY OF TIGARD OREGON Dennis Thompson 12475 SW Main St Tigard, OR 97223 TRAFFIC IMPACT FEE FOR PACIFIC CAR WASH Enclosed with this letter you will find a calculation sheet showing the computation that has been performed to determine the amount of the Traffic Impact Fee (TIF) to be paid for the project noted above. The amount of the TIF is $31,500.00. You have three payment options available to you. The first is to pay the TIF at the time you are issued a building permit. The second is to arrange for payment over time by signing a promissory note (if you wish to exercise this second option please contact me for additional details). The third option is to defer payment until occupancy. Traffic impact fees are subject to an annual increase of up to 6% if not paid or financed prior to July 1st of each year. Please note that you may appeal the discretionary decisions made in determining the appropriate category and the amount of the fee based on that category. A notice of appeal must be received by the City Recorder no later than 5:00 p.m. on December 24, 1997 and must be accompanied by the $625.00 appeal fee required by Washington County. Although filed with the City Recorder, an appeal would be heard by the Washington County Hearings Officer. If you have any questions, or if I can be of further service, please contact me at 639- 4171. i3t9w6.; Amu Bonnie Mulhearn Development Services Technician c: TIF file Building file I,DSTSI3TIF DOT 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 COUNTYWIDE TRAFFIC IMPACT FEE APPEAL INFORMATION Attached is a copy of the Director's decision on this Traffic Impact Fee assessment or Traffic Impact Fee Credit /Offset request. This decision may be appealed and a public hearing held by filing a signed petition for review (appeal) within fourteen (14) calendar days of the date written notice is provided (date mailed)_ APPEAL PERIOD: Date mailed: f s - I b - 7 to 5:00PM on 12 - Z 4 - c j i Appeal Due Date A motion for reconsideration also may be filed within seven calendar days of the date written notice of the decision is provided (see Section 208 of the Washington County Community Development Code). A motion for reconsideration does not stop the appeal period(s) from running and is available only as an extraordinary remedy for when a mistake of law or fact has occurred. A motion for reconsideration requires a filing fee of $ /0 ZS• °" This decision will be final if an appeal is not filed by the due date(s), and a motion for reconsideration is not granted by the Director. The complete file is available at I Silk Actil Ei . I tr _d 'Z 1 Q�7123 for review. J A petition for review (appeal) must contain the following: 1. The name of the applicant and the relevant casefile /building permit /other development permit number, 2. The name and signature of the petitioner filing the petition for review (appeal). If a group consisting of more than one person is filing a single petition for review, one individual shall be designated as the group's representative for all contacts with the Department. All Department communications regarding the petition, including correspondence, shall be with this representative; 3. A statement of the interest of the petitioner; 4. The date the notice of decision was sent as specified In the notice; 5. The petition for review (appeal) shall state the relevant facts, applicable ordinance provisions, and relief sought; and 6. The fee of $625.00 for Director's decisions being appealed to the Washington County Hearings Officer. For further appeal information contact: formt3 `' Page No. 1 CASE HISTORY FOR CASE NO.: BUP97 -0539 THOMPSON & DAVIDSON LEASE 12390 SW SCHOLLS FERRY RD 09/21/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - - -- --- -- - - ---- - -- BUPC005 Application received / / / / 12/03/97 RECD DRA 12/04/97 BON BUPC008 Permit created / / / / 12/04/97 TIF to be assessed at a later date. DONE B 12/04/97 BON Need to consult with Brian R. as no trip rates available for a car wash. BUPCO10 Check for prcl. restrict. / / / / 12/04/97 Conditions of approval for SDR97 -0010 to MEMO B 12/04/97 BON apply BUPC012 Plans routed to Plans Examiner / / / / 12/04/97 SENT B 12/04/97 BON BUPCO26 Approved Plans routed to DSTs / / / / 02/03/98 APPR RDP 02/03/98 RDP BUPCO29 DST Post Review Completed / / / / 02/09/98 DONE B 02/09/98 BON BUPC090 (F) Ready to issue / / / / 02/09/98 TIF assessment is being negotiated MEMO B 02/20/98 DST between Brian R. and applicant. We will not defer TIF until this is resolved and have an exact dollar amount. 2/17/98: On 2/13/98 BDR accepted traffic engineer report at 224 trips calculated by DLH and sent today. DO NOT ISSUE THIS PERMIT WITHOUT A TIF PAYMENT OPTION FORM COMPLETED AND SUBMITTED 02/20/98: TIF Payment option form has been completed. Defer to occupancy! BUPC100 (F) Issue permit / / / / 02/24/98 DONE DEB 02/24/98 DST BUPC461 Develop Rev Conditions Met / / / / 09/17/98 Approval granted by MJR for a 60 day APPR JDA 09/17/98 JDA temp C of 0 to complete landscape for which a bond was received by COT BUPC705 Foot /Found Insp 12/08/97 / / 03/11/98 Reclaimer Pit. Footings at detail A/5 1, PASS GS 03/11/98 J *H to be inspected by Engineer Note: Engineer to do rebar inspections Please forward all field inspection reports and a final summary report to my office. BUPC705 Foot /Found Insp / / / / 03/13/98 Re -bar for "A" footing okay. PASS GS 03/15/98 J *H BUPC705 Foot /Found Insp / / / / 03/26/98 conveyor footing PASS RB 03/27/98 RB BUPC705 Foot /Found Insp / / / / 04/16/98 Rebar PASS GS 04/19/98 J *H BUPC715 Struc Steel Insp 12/08/97 / / 04/01/98 Rebar approved section thru correlator, PASS GS 04/01/98 J *H conveyor walls. Page No. 2 CASE HISTORY FOR CASE NO.: BUP97 -0539 THOMPSON & DAVIDSON LEASE 12390 SW SCHOLLS FERRY RD 09/21/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - --- --- - --- ---- - -- BUPC715 Struc Steel Insp / / / / 09/10/98 Received report dated 091098, approving PASS CTI 09/11/98 J *H structural steel - field, final summary from Douglas Leach. Routed to file. BUPC716 Reinf Steel Insp 12/08/97 / / 03/19/98 Pit walls and baffles /rebar approved. PASS GS 04/09/98 J *H SEE SLAB INSPECTION. BUPC725 Slab Insp 12/08/97 / / 04/09/98 Rebar approved for footings, office, PASS GS 04/09/98 J *H storage, electrical and equipment rooms. UFER GROUND IN. BUPC725 Slab Insp / / / / 04/29/98 rebar & steel mesh okay also PASS GS 04/29/98 J *H BUPC727 Masonry Insp 12/08/97 / / 05/07/98 SPEC INSP AS PER PLAN PART GS 05/07/98 GES MAINTAIN BAR LAP AND CORNER BARS AS PER PLAN BUPC727 Masonry Insp / / / / 05/18/98 Brick & rebar per special inspection. PASS RC 05/19/98 J *H BUPC727 Masonry Insp / / / / 05/22/98 Last of brick (rebar at brick approved) PASS GS 05/26/98 J *H BUPC740 Framing Insp 12/08/97 / / 06/16/98 PASS GS 06/16/98 GES BUPC742 Roof nailng Insp / / / / 06/16/98 PASS GS 06/16/98 GES BUPC750 Insulation Insp 12/08/97 / / 07/20/98 1. Submit energy calculations to Justify PASS GS 07/30/98 J *H compression of insulation beneath attic walk. BUPC757 Shear Wall Insp 12/08/97 / / / / 12/08/97 RDP BUPC760 Gyp Board Insp 12/08/97 / / 07/27/98 PASS HAP 07/27/98 DGW BUPC768 Structural welding final reprt / / / / 09/21/98 field welding rec. 9 -17 -98 PASS GS 09/21/98 GES BUPC790 Appr /sdwlk Insp 12/08/97 / / / / 12/08/97 RDP BUPC792 Misc. Inspection 12/08/97 / / 09/04/98 Bicycle Pad PASS GS 09/07/98 J *H BUPC792 Misc. Inspection / / / / 09/11/98 Letter from Carlson Testing: 091098: NOTE GS 09/14/98 J *H Structural Steel field approval, final summary received - work conforms. Letter to file from James Nicoli - general approval of water facility pond and misc. inspections during construction See file, letter dated 091198. 'w Page No 3 CASE HISTORY FOR CASE NO • BUP97 -0539 THOMPSON & DAVIDSON LEASE 12390 SW SCHOLLS FERRY RD 09/21/98 Cf Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By -- --- -------- -- BUPC802 Final Inspection 12/08/97 / / 09/03/98 1. Tempered glass window by office door FAIL GS 09/08/98 J *H 2. Indicator lock on bathroom door. 3. Check carwash bay windows for tempered stamp. 4. INSPECTION INCOMPLETE - NEEDS SUBTRADES. BUPC802 Final Inspection / / / / 09/11/98 SITE WORK NEEDS COMPLETION PRIOR TO FAIL GS 09/14/98 J *H ~ 33 BUILDING PERMIT APPROVAL. • `j , B s 1. Complete wall around monopole. ti f'"% 2. Remove dirt stockpile on adjacent lot. 01. )./.' .,.1 3 Soils report & final summary. ,,.r ell" � BUILDING PERMIT REQUIRES APPROVAL BY k ..,' t'-'.'. PLANNING DEPT. PRIOR TO FINAL INSPECTION: tip' �� 1. Tempered window by office door. v _�!/ 2. Planning Dept. approval. BUPC802 Final Inspection / / / / 09/16/98 NOTE TO FILE: Building final okay to FAIL GS 09/17/98 J *H pass pending site final, most items are bonded Fencing needs to go in immediately. Site (SIT97 -0044) incomplete: 1. Remove dirt from adjacent lot (bonded). 2 Fencing around monopole to be replaced (US West to replace). 3. Curb along adjacent lot not poured (bonded) BUPC802 Final Inspection / / / / 09/17/98 PASS GS 09/17/98 J *H BUPC947 (F) Issue Temp Cert of Occ / / 09/17/98 /,,l n/ Temporary Approval per George Steele. TEMP JMH 09/17/98 J *H ^n 7� - -te 'n/) l See notes in case for details / /1 �(J � I '„ n Allow 3 days for landscaping, etc. See ef2riL / I (.. \i MJ erts for details regarding bonding \ r landscaping. BUPC960 Case Finaled / / / / 09/17/98 All subtrades complete, ENG /SDR & Jill PASS GS 09/17/98 J *H have okayed issuance of temp C of 0 as + / remaining items on ENG /SDR have bonding. 1 1 1 • 1 / 1 li 41) 'VI Page No 1 CASE HISTORY FOR CASE NO • BUP97 -0539 THOMPSON & DAVIDSON LEASE 12390 SW SCHOLLS FERRY RD 09/22/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - - -- - -- -- - - - --- --- BUPC005 Application received / / / / 12/03/97 RECD DRA 12/04/97 BON BUPC008 Permit created / / / / 12/04/97 TIF to be assessed at a later date. DONE B 12/04/97 BON Need to consult with Brian R as no trip rates available for a car wash. BUPC010 Check for prcl. restrict. / / / / 12/04/97 Conditions of approval for SDR97 -0010 to MEMO B 12/04/97 BON apply. BUPC012 Plans routed to Plans Examiner / / / / 12/04/97 SENT B 12/04/97 BON BUPCO26 Approved Plans routed to DSTs / / / / 02/03/98 APPR RDP 02/03/98 RDP BUPCO29 DST Post Review Completed / / / / 02/09/98 DONE B 02/09/98 BON BUPC090 (F) Ready to issue / / / / 02/09/98 TIF assessment is being negotiated MEMO B 02/20/98 DST between Brian R. and applicant. We will not defer TIF until this is resolved and have an exact dollar amount. 2/17/98: On 2/13/98 BDR accepted traffic engineer report at 224 trips calculated by DLH and sent today. DO NOT ISSUE THIS PERMIT WITHOUT A TIF PAYMENT OPTION FORM COMPLETED AND SUBMITTED 02/20/98: TIF Payment option form has been completed. Defer to occupancy! BUPC100 (F) Issue permit / / / / 02/24/98 DONE DEB 02/24/98 DST BUPC461 Develop Rev Conditions Met / / / / 09/17/98 Approval granted by MJR for a 60 day APPR JDA 09/22/98 JDA temp C of 0 to complete landscape for which a bond was received by COT MJR granted full C of 0 release today, 9/21/98 see land use case lognote -jda BUPC705 Foot /Found Insp 12/08/97 / / 03/11/98 Reclaimer Pit: Footings at detail A/5.1, PASS GS 03/11/98 J *H to be inspected by Engineer. Note: Engineer to do rebar inspections. Please forward all field inspection reports and a final summary report to my office. BUPC705 Foot /Found Insp / / / / 03/13/98 Re -bar for "A" footing okay. PASS GS 03/15/98 J *H BUPC705 Foot /Found Insp / / / / 03/26/98 conveyor footing PASS RB 03/27/98 RB BUPC705 Foot /Found Insp / / / / 04/16/98 Rebar PASS GS 04/19/98 J *H BUPC715 Struc Steel Insp 12/08/97 / / 04/01/98 Rebar approved section thru correlator, PASS GS 04/01/98 J *H conveyor walls. Page No. 2 CASE HISTORY FOR CASE NO.: BUP97 -0539 THOMPSON & DAVIDSON LEASE 12390 SW SCHOLLS FERRY RD 09/22/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By BUPC715 Struc Steel Insp / / / / 09/10/98 Received report dated 091098, approving PASS CTI 09/11/98 J *H structural steel - field, final summary from Douglas Leach. Routed to file. BUPC716 Reinf Steel Insp 12/08/97 / / 03/19/98 Pit walls and baffles /rebar approved PASS GS 04/09/98 J *H SEE SLAB INSPECTION. BUPC725 Slab Insp 12/08/97 / / 04/09/98 Rebar approved for footings, office, PASS GS 04/09/98 J *H storage, electrical and equipment rooms. UFER GROUND IN. BUPC725 Slab Insp / / / / 04/29/98 rebar & steel mesh okay also PASS GS 04/29/98 J *H BUPC727 Masonry Insp 12/08/97 / / 05/07/98 SPEC INSP AS PER PLAN PART GS 05/07/98 GES MAINTAIN BAR LAP AND CORNER BARS AS PER PLAN BUPC727 Masonry Insp / / / / 05/18/98 Brick & rebar per special inspection. PASS RC 05/19/98 J *H BUPC727 Masonry Insp / / / / 05/22/98 Last of brick (rebar at brick approved). PASS GS 05/26/98 J *H BUPC740 Framing Insp 12/08/97 / / 06/16/98 PASS GS 06/16/98 GES BUPC742 Roof nailng Insp / / / / 06/16/98 PASS GS 06/16/98 GES BUPC750 Insulation Insp 12/08/97 / / 07/20/98 1. Submit energy calculations to justify PASS GS 07/30/98 J *H compression of insulation beneath attic walk. BUPC757 Shear Wall Insp 12/08/97 / / / / 12/08/97 RDP BUPC760 Gyp Board Insp 12/08/97 / / 07/27/98 PASS HAP 07/27/98 DGW BUPC768 Structural welding final reprt / / / / 09/21/98 field welding rec. 9 -17 -98 PASS GS 09/21/98 GES BUPC790 Appr /sdwlk Insp 12/08/97 / / / / 12/08/97 RDP BUPC792 Misc Inspection 12/08/97 / / 09/04/98 Bicycle Pad PASS GS 09/07/98 J *H BUPC792 Misc Inspection / / / / 09/11/98 Letter from Carlson Testing: 091098: NOTE GS 09/14/98 J *H Structural Steel field approval, final summary received - work conforms. Letter to file from James Nicola - general approval of water facility pond and misc. inspections during construction. See file, letter dated 091198 Page No. 3 CASE HISTORY FOR CASE NO.: BUP97 -0539 THOMPSON & DAVIDSON LEASE 12390 SW SCHOLLS FERRY RD 09/22/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By BUPC802 Final Inspection 12/08/97 / / 09/03/98 1. Tempered glass window by office door. FAIL GS 09/08/98 J *H 2. Indicator lock on bathroom door. 3. Check carwash bay windows for tempered stamp. 4. INSPECTION INCOMPLETE - NEEDS SUBTRADES. BUPC802 Final Inspection / / / / 09/11/98 SITE WORK NEEDS COMPLETION PRIOR TO FAIL GS 09/14/98 J *H BUILDING PERMIT APPROVAL. 1 Complete wall around monopole. 2 Remove dirt stockpile on adjacent lot. 3. Soils report & final summary. BUILDING PERMIT REQUIRES APPROVAL BY PLANNING DEPT. PRIOR TO FINAL INSPECTION: 1. Tempered window by office door. 2. Planning Dept. approval. BUPC802 Final Inspection / / / / 09/16/98 NOTE TO FILE• Building final okay to FAIL GS 09/17/98 J *H pass pending site final, most items are bonded. Fencing needs to go in immediately. Site (SIT97 -0044) incomplete: 1. Remove dirt from adjacent lot (bonded). 2. Fencing around monopole to be replaced (US West to replace). 3 Curb along adjacent lot not poured (bonded). BUPC802 Final Inspection / / / / 09/17/98 PASS GS 09/17/98 J *H BUPC950 (F) Issue Cert of Occupancy / / / / 09/17/98 JMT 09/22/98 JT BUPC960 Case Finaled / / / / 09/17/98 All subtrades complete, ENG /SDR & Jill PASS GS 09/17/98 J *H have okayed issuance of temp C of 0 as remaining items on ENG /SDR have bonding. CITY OF TIGARD BUILDING INSPECTION DIVISION MST )££�� 24 - -H,� Jouur Inspection Line: 639 -4175 Business Line: 639 -4171 C17-05.37 Date Requested C i - ib 5 AM PM BLD Location "if r . 6 A h ,1 4 t . A 1_,2 Suite MEC Contact Person it I 1 1)4\ Ph PLM Contractor Ph SWR ILDING Tenant/Owner Paz,44, CAA bOliu'vv ELC Re • • all ELR Footing Foundation Access: ,� � ��// id_ ma L/OK FPS Ftg Drain ,, SGN Crawl Drain Inspection Notes: / f" SIT q'7 - ©© 4 Poost st '7 Slab & Beam Ext Sheath /Shear ( P V 67\- �, ) Int Sheath /Shear Uo .�- /Q /� n� Framing ' Jo o-o- w � ' 4, l ,, J / � �� 1 /� / � � ,, / Insulation plte a C4 zLt b gat I 1 Cat d1 . lW - 7[ 71 K Drywall Nailing Fire Sprinkler Fire Sp J Fire Alarm Susp'd Ceiling Roof / ./0%tiii /-e/I ./LIA-Uti. - t' 7,...4.-0)er-'t.- L.,-) PASS PART FAIL C ` "_" PLUMBING ,...4 e (.r��� 1/4_ , - / iz� A Post & Beam !� Under Slab , ( S (A).,441..7 Top Out � Water Service ( I ,/ ILA- YA _,,, _. J_ - C,-e .�t..-L Sanitary Sewer Rain Drains v Final � 7.j PASS PART FAIL i Z _ MECHANICAL / / r , Post & Beam L 1� iA_...___i_.4 ,A . 6 _ Rough In ' / Gas Lines '�.((��� l -` - i , Smoke Dampers /Z� " /� x i• • i - IP Final PASS PART FAIL / fr' ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final S PART FAIL IT Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk O Date I / 4 7� Inspector IZI Ext `* PART FAIL DO NOT REMOVE this inspection record from the job site. CITY OF TIGARD BUILDING INSPECTION DIVISION MST 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 .7 —053q /6 4:SO 1605 Date Requested 7/ 7 -q j PM BLD Location 2_3 WS oil' - L., - S p MEC ! - ,, I Contact Person e Ph [ q3 -00(3 PLM Contractor (l'.J�(. & r" 1 Ph �' 612 - 75 SWR UILDING Tenant/Owner PA—ct Fl C CA-g- \ IAS.- ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: � .� , J, P ost Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Mi a {Z*. ART FAIL PLUMBING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PART FAIL Backfill/Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk ?� / 7' — 9 Date d Inspector Ext Final S PART FAIL DO NOT REMOVE this inspection record from the job site.