Correspondence Memo
TO: Phil Waymire
Bergelectric
FROM: Steve Lockhart, P.E. .L aod 6003
Principal
SUBJECT: Fanno Creek Buildings A 80
Electrical Plan Review Corrections
DATE: February 20, 2007
Please forward the following responses to the electrical plan review comments to the City of Tigard along with the
attache revised drawings.
1. The receptacles have been accounted for in "miscellaneous" category at the main service level. Any
applicable receptacle code factors are applied at the branch panel level and taken at that point.
2. 480 volt bus and main information was added to the panel schedules.
3. Grounding detail and code references were added to the one -line diagram.
If you have any questions, please feel free to call.
SLIvs 2372 ElecPlanRevuCorrections.doc
Attachment