Loading...
Report In-/10/98 THU 08:50 FAX 503 684 0954 CARLSON TESTING 0 002 Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing Inc • Phone (503) 684-34 Phone (503) 589 -1252 FAX (503) 684.0954 FAX (503) 589 -1309 Special Inspection FINAL SUMMARY LETTER September 10, 1998 #98 -2446 • City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department 01 Re: Pacific Car Wash 12390 SW Scholls Ferry Road Tigard, OR Permit No.: BUP970539 Dear Sir/Madam: This is to certify that in accordance with Chapter 17 of the Uniform Building Code, we have performed special inspection of the following item(s) per our inspection reports only. Structural Steel - Field All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards; as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain'to the material testedinspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, IN 1 (12 ):1 2/ 61 ' Douglas W. Leach President - General Manager DWK:jdk cc: Robert Gray Partners - Ralph Nicoli Engineering and Construction Services, Inc. • Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson Testing, Inc. FAX (503) 684-0954 684-3460 Phone (503) 589-1252 FAX (503) 589 1309 Special Inspection FINAL SUMMARY LETTER September 10, 1998 #98 -2446 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Pacific.Car- _Wash 12390=SW :Scholls<Feny Road, Tigard, OR Permit No.: BUP970539 Dear Sir/Madam: This is to certify that in accordance with Chapter 17 of the Uniform Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Structural Steel - Field All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC `Z• Douglas W. Leach President - General Manager DWK:jdk cc: Robert Gray Partners - Ralph Nicoli Engineering and Construction Services, Inc. PWVORD 2EPORTSFlNLTRI9&2446