Loading...
Permit MASTER PERMIT CITY OF TIGARD PERMIT # ° MST95 -0230 ' COMMUNITY DEVELOPMENT Cid-4 �MgNT DATE ISSUED: 06/14/95 13125 SW Hall Blvd. Tigard. Oregon 97223.8199 (503) 839 -4171 PARCEL: 2S104CD -10400 SITE ADDRESS...: 13649 SW TRACY PL SUBDIVISION ° HILLSHIRE ESTATES NO. 2 ZONING: R -7 PD BLOCK LOT :103 BUILDING REISSUE: DWELLING UNITS :1 BASEMENT :0 sf CLASS OF WORK. :NEW BEDRMS :3 BATHS:3 GARAGE -925 sf TYPE OF USE... :SF FLOOR AREAS REQUIRED SETBACKS TYPE OF CONST. :5N FIRST -1349 sf LEFT.. :9 ft RIGHT.: 9 ft OCCUPANCY GRP.: R3 SECOND...: 1673 sf FRONT. :20 ft REAR.. :99 ft STORIES FINBSMENT :0 sf REQUIRED HEIGHT -32 ft TOTAL :3022 sf SMOKE DETECTORS. :Y FLOOR LOAD -40 psf VALUE $° 210453 PARKING SPACES.. :1 Remarks: PATH I -• -- PLUMBING - - -- SINKS .1 FLOOR DRAINS .0 BACKFLOW PREVNTRS.. :1 LAVATORIES..... :5 WATER HEATERS... :1 TRAPS • :0 TUB /SHOWERS .3 LAUNDRY TRAYS... :0 CATCH BASINS .0 WATER CLOSETS.. :3 SEWER LINE (ft). :0 GREASE TRAPS -0 DISHWASHERS °1 WATER LINE (ft). :100 OTHER FIXTURES -0 GARBAGE DISP... :1 RAIN DRAIN (ft). :0 WASHING MACH... :1 SF RAIN DRAINS.. :1 - - - - -• MECHANICAL FEES -- FUEL TYPES UNIT HTRS.. :0 type amount by date recpt /GAS/ / / VENTS :0 TIF $ 1550.00 JD 06/14/95 95- 266728 MAX INPUT :O BTU VENT FANS.. :4 SWM $ 180.00 JD 06/14/95 95- 266728 FURN < 100K .. :0 HOODS •1 SWM $ 100.00 JD 06/14/95 95- 266728 FURN >=100K .. :1 WOODSTOVES.:0 BPRT $ 710.50 JD 06/14/95 95- 266728 FLOOR FURN °0 CLO DRYERS.: 1 BPLC $ 461.83 SW 06/01/95 95- 266145 BOIL /CMP < 3HP :0 OTHER UNITS :1 BSPC $ 35.53 JD 06/14/95 95- 266728 GAS OUTLETS :1 PARK $ 500.00 JD 06/14/95 95- 266728 Owner: -----MPRT $ 45.00 JD 06/14/95 95- 266728 WINDWOOD HOMES MPLC $ 11.25 JD 06/14/95 95- 266728 14076 SW BENCHVIEW TERR. M5PC $ 2.25 JD 06/14/95 95- 266728 3BTH $ 225.00 JD 06/14/95 95- 266728 TIGARD OR 97224 P5PC $ 11.25 JD 06/14/95 95- 266728 Phone #: 590 -4700 EROS $ 88.00 JD 06/14/95 95- 266728 Contractor: --- - -ERPC $ 28.60 JD 06/14/95 95- 266728 WINDWOOD HOMES ERPC $ 28.60 JD 06/14/95 95- 266728 14076 SW BENCHVIEW TERRACE TIGARD OR 97224 Phone 1#: 590 - -4700 Reg #.. : 05019E - • - - - - -- -- •--- -• - - -- $ 3977.81 TOTAL This peroit is issued subject to the regulations contained in the REQUIRED INSPECTIONS -- -• Tigard Municipal Code, State of Ore. Specialty Codes and all other Footing Insp Plumb Top Out applicable laws. All work will be done in accordance with approved Foundation Insp Framing Insp plans. This peroit will expire if work is not started within 180 Post /Beam Struct Fireplace Insp days of issuance, or if work is suspen for core than 180 days. Post /Beam Mechan Gas Line Insp Crawl Drain Insulation Insp Permittee Sign_ e: Plm /undslab Insp Gyp Board Insp ,� 'LM /Underfloor Rain drain Insp Issued :t �� �� A i r Mechanical Insp Water Line Insp Call for inspection - 639 -4175 4 4 N5 o' Residential Building Permit Application ,, u ,u City o f'Tigard 13125 SW Hall Blvd. Tigard, O 97223 (503) 639-4 1 71 - - ' " A a Addr lo w /9 L5('‘) �/ i ...... .. / 7 � ,. .... us..v ` , / ubdiviston• / � � � Lot # � > `.Off : U �- Valuation: p? f® ( / Si . P # ` ' Corner Lot? Y • @D Flag Lot? Y : Owner. /01)// 0/1/-(-)°'-‘3 0/1/-(-)°'-‘3 ��` < Appro Required :::::::: o S 7c G a.r Address: � t dd ess: G lZ2' w 7� �r r Plannin : � Cho — O h � � 3 �" Phone: �1G Required 7 to ` r a O e 1 • Contractor: items ':.: .:.. .:.:::....::. .:..:,: :...... >;: Address: dd ess: ^:% % :; �i; is Truss ` • ..,, ... ,.. ` .. ..... Deta is :` � °�<'�� >> >' °' >: �� : �� Phone: tt Other 'V : f ;LA Lam;' Contractor's License # � 9J`F ? • ./ (attach copy of c nt Oregon license Contact Name & Phone: )Z-k- / 7Plr �Q�� Subc ntractors: / Arc Contact i ` ct. --� .../Plumbing: �l S �ld Address: chanicaI: yA� T•/ (attach op of curre O R Co Licens �G.�� ,[/� G/, „ y Phone may— 7� JOB DESCRIPTION: ��'�� Applica• " gnature & Phone number Received by: A7 Date Received: \ (p 1 I cl 5 Permit # Account Description Amount Amt. Pd. 64ue m54 - 0 23Oi Bldg. Permit (BUILD) 7/0 . so 2/0 , So Plumb. Permit (PLUMB) 2-2 Mech. Permit (MECH) 4r, c V ( 1' 5 _ - _ .State Tax (TAX) //f` ; v 3 / c/ Q. 03 3 S: S 3 /- _. Plumb: //. Z Mech: -, Z 5 / / 2 2.3 ' . 0 8 Plan Check (PLANCK) 73.0r 2. 50 iggtY Bldg: — 4/. KJ Plumb: Mech: /• zs / Scar i! 0"22.1 Sewer Connection (SWUSA) /U 2 21ov Sewer Inspection (SWINSP) 3 c 3 Parks Dev Charge (PKSDC) ,5 v Residential TIF (T1F -R) / '/.3 0 / 7 Mass Transit TIF (TIF -MT) /2-/ Commercial TIF (TIF -C) Industrial TIF (T1F-1) Institutional T1F (TIF -IS) Office T1F (TIF -0) Water Quality (WQUAL) / 411 Water Quantity (WQUANT) / GI/ / / Fire Life Safety (FLS) Erosion Cntrl Permit (ERPRMT) ?r Erosion Planck/USA (ERPLAN) �k6 o ;2 - Ca Erosion Planck/COT (EROSN) 02r, Go at‘'' TOTALS: 62 /Z,, -250 ey `/ q Solar Balance Worksheet Address /36 L / Trac y /'"t • Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. Measure the distance from the midpoint of the g North lot line to the South lot line along the described line. ft Box B calculations: Shade point height from your structure. Box B: 1. Determine whether measurements will be based on the peak or eave of your structure. The orientation of the ridge is also important. Which la: If the roof line runs North - South, measurements will be describes based on the peak of the roof. your lot? lb: If the roof line runs East -West and the roof pitch is less (Circle one) than 5/12, measurements will be based on the eave. lc: If the roof line runs East -West and the roof pitch is 5/12 la lb lc or steeper, measurements will be based on the peak. 2. Measure change in elevation from front property line to finished floor elevation. ft 3. Measure distance from finished floor elevation to the affected peak /eave. +3 ft 4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, deduct nothing. ft 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot _ �- ft has no slope or slopes up from the rear to the front, deduct nothing. 6. Total figure for box B: 2 ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation. i ft 2. Measure the distance from the foundation to the affected + Icp ft peak or eave. 3. Total figure for box C: 2 ft H: \LOGIN \DSTS \SOLARCK Solar Balance Point Standard Box A. North-South dimension for your lot Box B. Shade p•'nt he ght from your structure O r feet � feet Box C. Distance to the shade reduction line 2 7 Feet Distance to shade 100+ 95 90 85 30 75 70 65 60 55 50 45 40 reduction line from northern lot line in feet 70 40 40 40 41 42 43 44 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 39 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32. 32 32 33 34 35 36 37 38 39 40 41 42 45 30 30 30 31 32 33 34 35 36 37 38 39 40 40 28 28 28 29 30 31 32 33 34 35 36 37 38 35 26 26 26 27 28 29 30 31 32 33 34 35 36 30 24 24 24 25 ,26 27 28 29 30 31 32 33 34 25 22 22 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 21 22 23 24 25 26 27 28 29 30 15 18 18 18 19 20 21 22 23 24 25 26 27 28 10 16 16 16 17 18 19 20 21 22 23 24 25 26 5 14 14 14 15 16 17 18 19 20 21 22 23 24 Box "D" Maximum allowed shade point height 2cY feet login \viola \solarbal Page No. 1 CASE HISTORY FOR CASE NO.: MST95 -0230 WINDWOOD HOMES 13649 SW TRACY PL 02/09/99 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTA007 Application received / / / / 06/01/95 PASS SW 06/02/95 BLT MSTA010 Plan check deposit paid / / / / 06/01/95 PASS SDW 06/02/95 BLT MSTA020 Plan check by 06/02/95 / / 06/02/95 PASS RT 06/02/95 BLT MSTA030 Check for prcl. restrict. / / 06/02/95 06/02/95 PASS SW 06/02/95 BLT MSTA080 (F) Ready to issue / / / / 06/06/95 SKW 06/06/95 CTR MSTA092 (F) Issue combination permit / / / / 06/14/95 JSD 06/14/95 JD MSTA097 Issue plumbing signature form / / / / 06/14/95 JSD 06/14/95 JD MSTA705 Footing Insp / / / / 06/16/95 pending -usa; 12 depth; seismic; 3 -ties PASS RB 06/19/95 RB for ground rod. MSTA706 Foundation Insp / / / / 06/20/95 PASS RB 06/20/95 RB MSTA710 Post /Beam Structural / / / / 07/05/95 see report PASS RB 07/05/95 RB MSTA711 Post /Beam Mechanical / / / / 07/05/95 see report PASS RB 07/05/95 RB MSTA713 Crawl Drain / / / / / / 06/02/95 BLT , MSTA717 PLM /Underfloor / / / / 06/28/95 NR S MS 06/29/95 MRS MSTA717 PLM /Underfloor / / / / 07/05/95 need nail plates FAIL MS 07/05/95 MRS MSTA717 PLM /Underfloor / / / / . 07/06/95 PASS MS 07/06/95 MRS • MSTA720 Mechanical Insp / / / / 08/25/95 SOFFIT DUCTWORK; ENCLOSE LID -BONUS FAIL RB 08/25/95 RB CHASE; EXHAUST VENTING INCOMPLETE; SECURE FAN HOUSING FAMILY BATH MSTA720 Mechanical Insp / / / / 08/30/95 pending- exhaust venting PASS RB 08/30/95 RB MSTA720 Mechanical Insp / / / / 09/01/95 exhaust venting; enclose fireplace chase FAIL RB 09/01/95 RB at ceiling level. MSTA720 Mechanical Insp / / / / 09/08/95 SEE REPORT FAIL RB 09/11/95 RB MSTA720 Mechanical Insp / / / / 09/12/95 MECH LOCATIONS, BUT STRUCTURAL ISSUES. PEND RB 09/13/95 RB MSTA720 Mechanical Insp / / . / / 09/13/95 PASS RB 09/14/95 RB MSTA722 Plumb Top Out / / / / 08/11/95 TEST WASTE THRU ROOF DIS GS 08/15/95 GES MSTA722 Plumb Top Out / / / / 08/17/95 need to secure hose bib PASS MS 08/17/95 MRS MSTA725 Framing Insp / / / / 08/30/95 3 -page report FAIL RB 08/30/95 RB MSTA726 Framing <REINSP> / / / / 09/01/95 pending- mech. issues; metal plate FAIL RB 09/01/95 RB protection; strap plates MSTA726 Framing <REINSP> / / / / 09/08/95 SEE REPORT $ 15 RB 09/11/95 RB MSTA726 Framing <REINSP> / / / / 09/12/95 SEE REPORT $ 15 RB 09/13/95 RB Page No. 2 CASE HISTORY FOR CASE NO.: MST95 -0230 WINDWOOD HOMES 13649 Sw TRACY PL 02/09/99 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTA726 Framing <REINSP> / / / / 09/13/95 PENDING- PLUMBING ROOF JACK INSTALLATION PASS RB 09/14/95 RB MSTA735 Gas Line Insp / / / / 09/08/95 TERMINATED DUE TO MECH /FRAMING FAILURE FAIL RB 09/11/95 RB MSTA735 Gas Line Insp / / / / 09/12/95 TERMINATED DUE TO FAILED PREVIOUS FAIL RB 09/13/95 RB INSPECTION MSTA735 Gas Line Insp / / / / 09/13/95 PASS RB 09/14/95 RB MSTA740 Insulation Insp / / / / 09/08/95 TERMINATED INSPECTION DUE TO FAILURE OF FAIL RB 09/11/95 RB • FRAMING /MECH ISSUES- RE- INSPECT FEE $15.00 CHARGED MSTA740 Insulation Insp / / / / 09/12/95 FAILED MECH /FRAMING ISSUES FAIL RB 09/13/95 RB MSTA740 Insulation Insp / / / / 09/13/95 PASS RB 09/14/95 RB MSTA745 Gyp Board Insp / / / / 09/18/95 INCOMPLETE FAIL RB 09/18/95 RB MSTA745 Gyp Board Insp / / / / 09/19/95 # -1- provide approved plans on site to DIS KS 09/26/95 KBS verify if shear nailing is applicable # -2- provide complete separation between garage /dwelling adjacent to furnace • MSTA745 Gyp Board Insp / / / / 09/22/95 # -1- see corrections notes DIS KS 09/22/95 KBS MSTA745 Gyp Board Insp / / / / 09/26/95 # -1- call for water test ( shower pan) A/N KS 09/26/95 KBS prior to installation of ceramic tile or other proof material # -2- apply gypsum under stairs storage area MSTA755 Rain drain Insp / / / / 06/26/95 PASS MS 06/27/95 MRS MSTA760 Water Line Insp / / / / 06/26/95 PASS MS 06/27/95 MRS MSTA760 Water Line Insp / / / / 08/11/95 APP GS 08/15/95 GES MSTA761 Water Service Insp / / / / 12/14/95 APP GS 12/15/95 GES MSTA765 Appr /Sdwlk Insp / / / / 10/13/95 1) Raise drain line in wing. PEND LT 10/16/95 JS 2) Place felt at 40' in sidewalk. 3) Be prepared to protect finish. MSTA765 Appr /Sdwlk Insp 12/15/95 / / 12/14/95 PASS PI 12/15/95 C +H MSTA770 Misc. Inspection / / / / 08/25/95 ECA MJR 08/25/95 MJR MSTA770 Misc. Inspection 11/29/95 / / 11/29/95 shower pan ok PASS MS 07/26/96 BT2 MSTA790 Electrical Final 12/15/95 / / 12/15/95 power outage DIS GS 07/26/96 BT2 • Page No. 3 CASE HISTORY FOR CASE NO.: MST95 -0230 WINDWOOD HOMES 13649 SW TRACY PL 02/09/99 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - - -- - -- -- -- - --- - -- MSTA790 Electrical Final 12/18/95 / / 12/18/95 garage /house steps FAIL TLP 07/26/96 BT2 off one in. electrical not ready MSTA790 Electrical Final / / / / 02/03/99 final signed off by MJR on 12/22/95 PASS MJR 02/03/99 CD MSTA795 Mechanical Final / / / / 12/14/95 power outage DIS GS 12/15/95 GES MSTA795 Mechanical Final 12/15/95 / / 12/15/95 PASS TLP 07/26/96 BT2 MSTA797 Plumb Final / / / / 12/13/95 main valve? PART MS 12/18/95 TLP clean -out? MSTA797 Plumb Final 12/15/95 / / 12/15/95 power outage DIS GS 07/26/96 BT2 MSTA797 Plumb Final 12/15/95 / / 12/15/95 PASS TLP 07/26/96 BT2 MSTA799 Building Final / / / / 12/14/95 power outage DIS GS 12/19/95 TLP MSTA799 Building Final 12/15/95 / / 12/15/95 garage /house steps off one in. FAIL TLP 07/26/96 BT2 MSTA799 Building Final 12/19/95 / / 12/19/95 # -1 -due to wet weather conditions A/N KS 01/29/99 VLN contractor will do finish grading as weather permits slope finish away from structure MSTA799 Building Final / / / / / / Inspection request for research to Hap NOTE 01/29/99 VLN W. 12/28/98. MSTA799 Building Final / / / / 02/02/99 8 -1- need electrical finaled. contacted FAIL KS 02/02/99 KBS Dale Richards, office left message with secretary needs final electrical approval. MSTA960 (F) Issue Cert. of Occupancy / / / / 12/19/95 02/09/99 JT MSTB708 Erosion Control / / / / 12/19/95 APP WS 12/19/95 KBS MSTB750 Shear Wall Insp / / / / 08/14/95 no engineering left w /plans FAIL RB 08/14/95 RB MSTB750 Shear Wall Insp / / / / 08/16/95 hd's missing; shear blocking req'd; FAIL RB 08/17/95 RB drywall shear req'd; block & strap w /cs -16 upstairs- marked • Page No. 4 CASE HISTORY FOR CASE NO., MST95 -0230 WINDWOOD HOMES 13649 SW TRACY PL 02/09/99 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTB750 Shear Wall Insp / / / / 08/22/95 shear blocking inadequate at $ 15 RB 08/22/95 RB splices /joints; submitt revised engineering for 2x6 studs; block and strap headers (marked); $15.00 re- inspection fee charged MSTB750 Shear Wall Insp / / / / 08/24/95 LETTER FROM ENG. FOR CHANGE TO PEND RB 08/25/95 RB HD'S /STUDS- RESUME AT CONTRACTOR'S OWN RISK- SUBMITTAL NOT YET RECEIVED, AS WAS TOLD BY JEFF MILLER (WINDWOOD) MSTB760 Gyp Board Insp / / / / 08/16/95 drywall shear 4/4 nailing- marked NOTE RB 08/17/95 RB • CITY OF TIGARD BUILDING INSPECTION DIVISION Msr 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested AM PM BLD Location / 36P '? _ 5 i'l/ �2 �/� G� Suite MEC Contact Person Ph PLM Contractor (J u i0.‘2aJ S Ph , JD SWR BUILDING> Tena O wn A/, v;o6 f - 7 - 1,,Ac - RC e ELC Retai rng Wall __ / ELR Footing Foundation FPS Ftg Drain O I REQ_ITESTED-____) SGN Crawl Drain Ili i,F�UND DURING RESEARCI1 Slab LNO-INSPECTION(s) FIL-EJ SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation � w ,,� �p Drywall Nailing , pp e- /a2---16/ — q3 — ALL 1 -2�f/ Fire wall 6(2-?N \ Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Misc: final' PASS PART FAIL PLUMBING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill/Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk p Other D Inspector Ext Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site.