Permit MASTER PERMIT
CITY OF TIGARD PERMIT # ° MST95 -0230
' COMMUNITY DEVELOPMENT Cid-4 �MgNT DATE ISSUED: 06/14/95
13125 SW Hall Blvd. Tigard. Oregon 97223.8199 (503) 839 -4171
PARCEL: 2S104CD -10400
SITE ADDRESS...: 13649 SW TRACY PL
SUBDIVISION ° HILLSHIRE ESTATES NO. 2 ZONING: R -7 PD
BLOCK LOT :103
BUILDING
REISSUE: DWELLING UNITS :1 BASEMENT :0 sf
CLASS OF WORK. :NEW BEDRMS :3 BATHS:3 GARAGE -925 sf
TYPE OF USE... :SF FLOOR AREAS REQUIRED SETBACKS
TYPE OF CONST. :5N FIRST -1349 sf LEFT.. :9 ft RIGHT.: 9 ft
OCCUPANCY GRP.: R3 SECOND...: 1673 sf FRONT. :20 ft REAR.. :99 ft
STORIES FINBSMENT :0 sf REQUIRED
HEIGHT -32 ft TOTAL :3022 sf SMOKE DETECTORS. :Y
FLOOR LOAD -40 psf VALUE $° 210453 PARKING SPACES.. :1
Remarks: PATH I
-• -- PLUMBING - - --
SINKS .1 FLOOR DRAINS .0 BACKFLOW PREVNTRS.. :1
LAVATORIES..... :5 WATER HEATERS... :1 TRAPS • :0
TUB /SHOWERS .3 LAUNDRY TRAYS... :0 CATCH BASINS .0
WATER CLOSETS.. :3 SEWER LINE (ft). :0 GREASE TRAPS -0
DISHWASHERS °1 WATER LINE (ft). :100 OTHER FIXTURES -0
GARBAGE DISP... :1 RAIN DRAIN (ft). :0
WASHING MACH... :1 SF RAIN DRAINS.. :1
- - - - -• MECHANICAL FEES --
FUEL TYPES UNIT HTRS.. :0 type amount by date recpt
/GAS/ / / VENTS :0 TIF $ 1550.00 JD 06/14/95 95- 266728
MAX INPUT :O BTU VENT FANS.. :4 SWM $ 180.00 JD 06/14/95 95- 266728
FURN < 100K .. :0 HOODS •1 SWM $ 100.00 JD 06/14/95 95- 266728
FURN >=100K .. :1 WOODSTOVES.:0 BPRT $ 710.50 JD 06/14/95 95- 266728
FLOOR FURN °0 CLO DRYERS.: 1 BPLC $ 461.83 SW 06/01/95 95- 266145
BOIL /CMP < 3HP :0 OTHER UNITS :1 BSPC $ 35.53 JD 06/14/95 95- 266728
GAS OUTLETS :1 PARK $ 500.00 JD 06/14/95 95- 266728
Owner: -----MPRT $ 45.00 JD 06/14/95 95- 266728
WINDWOOD HOMES MPLC $ 11.25 JD 06/14/95 95- 266728
14076 SW BENCHVIEW TERR. M5PC $ 2.25 JD 06/14/95 95- 266728
3BTH $ 225.00 JD 06/14/95 95- 266728
TIGARD OR 97224 P5PC $ 11.25 JD 06/14/95 95- 266728
Phone #: 590 -4700 EROS $ 88.00 JD 06/14/95 95- 266728
Contractor: --- - -ERPC $ 28.60 JD 06/14/95 95- 266728
WINDWOOD HOMES ERPC $ 28.60 JD 06/14/95 95- 266728
14076 SW BENCHVIEW TERRACE
TIGARD OR 97224
Phone 1#: 590 - -4700
Reg #.. : 05019E - • - - - - -- -- •--- -• - - --
$ 3977.81 TOTAL
This peroit is issued subject to the regulations contained in the REQUIRED INSPECTIONS -- -•
Tigard Municipal Code, State of Ore. Specialty Codes and all other Footing Insp Plumb Top Out
applicable laws. All work will be done in accordance with approved Foundation Insp Framing Insp
plans. This peroit will expire if work is not started within 180 Post /Beam Struct Fireplace Insp
days of issuance, or if work is suspen for core than 180 days. Post /Beam Mechan Gas Line Insp
Crawl Drain Insulation Insp
Permittee Sign_ e: Plm /undslab Insp Gyp Board Insp
,� 'LM /Underfloor Rain drain Insp
Issued :t �� �� A i r Mechanical Insp Water Line Insp
Call for inspection - 639 -4175
4 4 N5
o' Residential Building Permit Application ,, u ,u
City o f'Tigard
13125 SW Hall Blvd.
Tigard, O 97223
(503)
639-4 1 71 - - ' "
A a Addr lo w /9 L5('‘)
�/ i ...... .. / 7 � ,. ....
us..v
` , /
ubdiviston• / � � � Lot # �
> `.Off : U
�-
Valuation:
p? f® ( / Si . P # ` '
Corner Lot? Y •
@D Flag Lot? Y
:
Owner. /01)// 0/1/-(-)°'-‘3 0/1/-(-)°'-‘3 ��`
< Appro Required ::::::::
o S 7c
G a.r
Address:
� t
dd ess: G lZ2'
w
7� �r r
Plannin :
� Cho
—
O
h �
� 3 �"
Phone: �1G Required
7
to ` r a
O e 1
• Contractor:
items ':.: .:.. .:.:::....::. .:..:,: :...... >;:
Address:
dd ess:
^:% % :; �i; is
Truss ` • ..,, ... ,.. ` .. .....
Deta is :` � °�<'�� >> >' °' >: �� : ��
Phone:
tt
Other 'V : f ;LA Lam;'
Contractor's License # � 9J`F ? • ./
(attach copy of c nt Oregon license
Contact Name & Phone: )Z-k- / 7Plr �Q��
Subc ntractors: /
Arc
Contact
i ` ct. --�
.../Plumbing: �l
S �ld Address:
chanicaI: yA� T•/
(attach op of curre O R Co Licens
�G.�� ,[/� G/, „ y Phone may— 7�
JOB DESCRIPTION: ��'��
Applica• " gnature & Phone number
Received by: A7 Date Received: \ (p 1 I cl 5
Permit # Account Description Amount Amt. Pd. 64ue
m54 - 0 23Oi Bldg. Permit (BUILD) 7/0 . so 2/0 , So
Plumb. Permit (PLUMB) 2-2
Mech. Permit (MECH) 4r, c V ( 1' 5 _
- _ .State Tax (TAX) //f` ; v 3 / c/ Q. 03
3 S: S 3 /- _.
Plumb: //. Z
Mech: -, Z 5 /
/ 2 2.3
' . 0 8
Plan Check (PLANCK) 73.0r 2. 50 iggtY
Bldg: — 4/. KJ
Plumb:
Mech: /• zs /
Scar i! 0"22.1 Sewer Connection (SWUSA) /U 2 21ov
Sewer Inspection (SWINSP) 3 c 3
Parks Dev Charge (PKSDC) ,5 v
Residential TIF (T1F -R) / '/.3 0 / 7
Mass Transit TIF (TIF -MT) /2-/
Commercial TIF (TIF -C)
Industrial TIF (T1F-1)
Institutional T1F (TIF -IS)
Office T1F (TIF -0)
Water Quality (WQUAL) / 411
Water Quantity (WQUANT) / GI/ / /
Fire Life Safety (FLS)
Erosion Cntrl Permit (ERPRMT) ?r
Erosion Planck/USA (ERPLAN) �k6 o ;2 - Ca
Erosion Planck/COT (EROSN) 02r, Go at‘''
TOTALS: 62 /Z,, -250
ey `/ q Solar Balance Worksheet
Address /36 L / Trac y /'"t
•
Box A calculations: North -South dimension for the lot. Box A:
This dimension is determined by finding the midpoint of the
North lot line and drawing an intersecting line perpendicular
to that point. Measure the distance from the midpoint of the g
North lot line to the South lot line along the described line.
ft
Box B calculations: Shade point height from your structure. Box B:
1. Determine whether measurements will be based on the peak
or eave of your structure. The orientation of the ridge
is also important. Which
la: If the roof line runs North - South, measurements will be describes
based on the peak of the roof. your lot?
lb: If the roof line runs East -West and the roof pitch is less (Circle one)
than 5/12, measurements will be based on the eave.
lc: If the roof line runs East -West and the roof pitch is 5/12 la lb lc
or steeper, measurements will be based on the peak.
2. Measure change in elevation from front property line to
finished floor elevation. ft
3. Measure distance from finished floor elevation to the
affected peak /eave. +3 ft
4. If the roof line runs North - South, deduct three feet.
If the roof line runs East -West, deduct nothing.
ft
5. Subtract one foot for each foot of difference in elevation
from the front property line to the rear property line, if
the lot slopes up from the front to the rear. If the lot _ �- ft
has no slope or slopes up from the rear to the front,
deduct nothing.
6. Total figure for box B:
2 ft
Box C. Distance to the shade reduction line. Box C:
1. Measure the distance from the North property line to the
foundation. i ft
2. Measure the distance from the foundation to the affected + Icp ft
peak or eave.
3. Total figure for box C:
2 ft
H: \LOGIN \DSTS \SOLARCK
Solar Balance Point Standard
Box A. North-South dimension for your lot Box B. Shade p•'nt he ght from your structure
O r
feet � feet
Box C. Distance to the shade reduction line
2 7 Feet
Distance to
shade 100+ 95 90 85 30 75 70 65 60 55 50 45 40
reduction line
from northern
lot line in feet
70 40 40 40 41 42 43 44
65 38 38 38 39 40 41 42 43
60 36 36 36 37 38 39 40 41 42
55 34 34 34 35 36 37 38 39 40 41
50 32. 32 32 33 34 35 36 37 38 39 40 41 42
45 30 30 30 31 32 33 34 35 36 37 38 39 40
40 28 28 28 29 30 31 32 33 34 35 36 37 38
35 26 26 26 27 28 29 30 31 32 33 34 35 36
30 24 24 24 25 ,26 27 28 29 30 31 32 33 34
25 22 22 22 23 24 25 26 27 28 29 30 31 32
20 20 20 20 21 22 23 24 25 26 27 28 29 30
15 18 18 18 19 20 21 22 23 24 25 26 27 28
10 16 16 16 17 18 19 20 21 22 23 24 25 26
5 14 14 14 15 16 17 18 19 20 21 22 23 24
Box "D" Maximum allowed shade point height 2cY feet
login \viola \solarbal
Page No. 1 CASE HISTORY FOR CASE NO.: MST95 -0230
WINDWOOD HOMES
13649 SW TRACY PL
02/09/99
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTA007 Application received / / / / 06/01/95 PASS SW 06/02/95 BLT
MSTA010 Plan check deposit paid / / / / 06/01/95 PASS SDW 06/02/95 BLT
MSTA020 Plan check by 06/02/95 / / 06/02/95 PASS RT 06/02/95 BLT
MSTA030 Check for prcl. restrict. / / 06/02/95 06/02/95 PASS SW 06/02/95 BLT
MSTA080 (F) Ready to issue / / / / 06/06/95 SKW 06/06/95 CTR
MSTA092 (F) Issue combination permit / / / / 06/14/95 JSD 06/14/95 JD
MSTA097 Issue plumbing signature form / / / / 06/14/95 JSD 06/14/95 JD
MSTA705 Footing Insp / / / / 06/16/95 pending -usa; 12 depth; seismic; 3 -ties PASS RB 06/19/95 RB
for ground rod.
MSTA706 Foundation Insp / / / / 06/20/95 PASS RB 06/20/95 RB
MSTA710 Post /Beam Structural / / / / 07/05/95 see report PASS RB 07/05/95 RB
MSTA711 Post /Beam Mechanical / / / / 07/05/95 see report PASS RB 07/05/95 RB
MSTA713 Crawl Drain / / / / / / 06/02/95 BLT
,
MSTA717 PLM /Underfloor / / / / 06/28/95 NR S MS 06/29/95 MRS
MSTA717 PLM /Underfloor / / / / 07/05/95 need nail plates FAIL MS 07/05/95 MRS
MSTA717 PLM /Underfloor / / / / . 07/06/95 PASS MS 07/06/95 MRS
•
MSTA720 Mechanical Insp / / / / 08/25/95 SOFFIT DUCTWORK; ENCLOSE LID -BONUS FAIL RB 08/25/95 RB
CHASE; EXHAUST VENTING INCOMPLETE;
SECURE FAN HOUSING FAMILY BATH
MSTA720 Mechanical Insp / / / / 08/30/95 pending- exhaust venting PASS RB 08/30/95 RB
MSTA720 Mechanical Insp / / / / 09/01/95 exhaust venting; enclose fireplace chase FAIL RB 09/01/95 RB
at ceiling level.
MSTA720 Mechanical Insp / / / / 09/08/95 SEE REPORT FAIL RB 09/11/95 RB
MSTA720 Mechanical Insp / / / / 09/12/95 MECH LOCATIONS, BUT STRUCTURAL ISSUES. PEND RB 09/13/95 RB
MSTA720 Mechanical Insp / / . / / 09/13/95 PASS RB 09/14/95 RB
MSTA722 Plumb Top Out / / / / 08/11/95 TEST WASTE THRU ROOF DIS GS 08/15/95 GES
MSTA722 Plumb Top Out / / / / 08/17/95 need to secure hose bib PASS MS 08/17/95 MRS
MSTA725 Framing Insp / / / / 08/30/95 3 -page report FAIL RB 08/30/95 RB
MSTA726 Framing <REINSP> / / / / 09/01/95 pending- mech. issues; metal plate FAIL RB 09/01/95 RB
protection; strap plates
MSTA726 Framing <REINSP> / / / / 09/08/95 SEE REPORT $ 15 RB 09/11/95 RB
MSTA726 Framing <REINSP> / / / / 09/12/95 SEE REPORT $ 15 RB 09/13/95 RB
Page No. 2 CASE HISTORY FOR CASE NO.: MST95 -0230
WINDWOOD HOMES
13649 Sw TRACY PL
02/09/99
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTA726 Framing <REINSP> / / / / 09/13/95 PENDING- PLUMBING ROOF JACK INSTALLATION PASS RB 09/14/95 RB
MSTA735 Gas Line Insp / / / / 09/08/95 TERMINATED DUE TO MECH /FRAMING FAILURE FAIL RB 09/11/95 RB
MSTA735 Gas Line Insp / / / / 09/12/95 TERMINATED DUE TO FAILED PREVIOUS FAIL RB 09/13/95 RB
INSPECTION
MSTA735 Gas Line Insp / / / / 09/13/95 PASS RB 09/14/95 RB
MSTA740 Insulation Insp / / / / 09/08/95 TERMINATED INSPECTION DUE TO FAILURE OF FAIL RB 09/11/95 RB •
FRAMING /MECH ISSUES- RE- INSPECT FEE
$15.00 CHARGED
MSTA740 Insulation Insp / / / / 09/12/95 FAILED MECH /FRAMING ISSUES FAIL RB 09/13/95 RB
MSTA740 Insulation Insp / / / / 09/13/95 PASS RB 09/14/95 RB
MSTA745 Gyp Board Insp / / / / 09/18/95 INCOMPLETE FAIL RB 09/18/95 RB
MSTA745 Gyp Board Insp / / / / 09/19/95 # -1- provide approved plans on site to DIS KS 09/26/95 KBS
verify if shear
nailing is applicable
# -2- provide complete separation between
garage /dwelling
adjacent to furnace
•
MSTA745 Gyp Board Insp / / / / 09/22/95 # -1- see corrections notes DIS KS 09/22/95 KBS
MSTA745 Gyp Board Insp / / / / 09/26/95 # -1- call for water test ( shower pan) A/N KS 09/26/95 KBS
prior to installation of
ceramic tile or other proof material
# -2- apply gypsum under stairs storage
area
MSTA755 Rain drain Insp / / / / 06/26/95 PASS MS 06/27/95 MRS
MSTA760 Water Line Insp / / / / 06/26/95 PASS MS 06/27/95 MRS
MSTA760 Water Line Insp / / / / 08/11/95 APP GS 08/15/95 GES
MSTA761 Water Service Insp / / / / 12/14/95 APP GS 12/15/95 GES
MSTA765 Appr /Sdwlk Insp / / / / 10/13/95 1) Raise drain line in wing. PEND LT 10/16/95 JS
2) Place felt at 40' in sidewalk.
3) Be prepared to protect finish.
MSTA765 Appr /Sdwlk Insp 12/15/95 / / 12/14/95 PASS PI 12/15/95 C +H
MSTA770 Misc. Inspection / / / / 08/25/95 ECA MJR 08/25/95 MJR
MSTA770 Misc. Inspection 11/29/95 / / 11/29/95 shower pan ok PASS MS 07/26/96 BT2
MSTA790 Electrical Final 12/15/95 / / 12/15/95 power outage DIS GS 07/26/96 BT2
•
Page No. 3 CASE HISTORY FOR CASE NO.: MST95 -0230
WINDWOOD HOMES
13649 SW TRACY PL
02/09/99
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
- - -- - -- -- -- - --- - --
MSTA790 Electrical Final 12/18/95 / / 12/18/95 garage /house steps FAIL TLP 07/26/96 BT2
off one in.
electrical not ready
MSTA790 Electrical Final / / / / 02/03/99 final signed off by MJR on 12/22/95 PASS MJR 02/03/99 CD
MSTA795 Mechanical Final / / / / 12/14/95 power outage DIS GS 12/15/95 GES
MSTA795 Mechanical Final 12/15/95 / / 12/15/95 PASS TLP 07/26/96 BT2
MSTA797 Plumb Final / / / / 12/13/95 main valve? PART MS 12/18/95 TLP
clean -out?
MSTA797 Plumb Final 12/15/95 / / 12/15/95 power outage DIS GS 07/26/96 BT2
MSTA797 Plumb Final 12/15/95 / / 12/15/95 PASS TLP 07/26/96 BT2
MSTA799 Building Final / / / / 12/14/95 power outage DIS GS 12/19/95 TLP
MSTA799 Building Final 12/15/95 / / 12/15/95 garage /house steps off one in. FAIL TLP 07/26/96 BT2
MSTA799 Building Final 12/19/95 / / 12/19/95 # -1 -due to wet weather conditions A/N KS 01/29/99 VLN
contractor will do
finish grading as weather permits slope
finish
away from structure
MSTA799 Building Final / / / / / / Inspection request for research to Hap NOTE 01/29/99 VLN
W. 12/28/98.
MSTA799 Building Final / / / / 02/02/99 8 -1- need electrical finaled. contacted FAIL KS 02/02/99 KBS
Dale Richards,
office left message with secretary
needs final
electrical approval.
MSTA960 (F) Issue Cert. of Occupancy / / / / 12/19/95 02/09/99 JT
MSTB708 Erosion Control / / / / 12/19/95 APP WS 12/19/95 KBS
MSTB750 Shear Wall Insp / / / / 08/14/95 no engineering left w /plans FAIL RB 08/14/95 RB
MSTB750 Shear Wall Insp / / / / 08/16/95 hd's missing; shear blocking req'd; FAIL RB 08/17/95 RB
drywall shear req'd; block & strap
w /cs -16 upstairs- marked
•
Page No. 4 CASE HISTORY FOR CASE NO., MST95 -0230
WINDWOOD HOMES
13649 SW TRACY PL
02/09/99
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTB750 Shear Wall Insp / / / / 08/22/95 shear blocking inadequate at $ 15 RB 08/22/95 RB
splices /joints; submitt revised
engineering for 2x6 studs; block and
strap headers (marked); $15.00
re- inspection fee charged
MSTB750 Shear Wall Insp / / / / 08/24/95 LETTER FROM ENG. FOR CHANGE TO PEND RB 08/25/95 RB
HD'S /STUDS- RESUME AT CONTRACTOR'S OWN
RISK- SUBMITTAL NOT YET RECEIVED, AS WAS
TOLD BY JEFF MILLER (WINDWOOD)
MSTB760 Gyp Board Insp / / / / 08/16/95 drywall shear 4/4 nailing- marked NOTE RB 08/17/95 RB
•
CITY OF TIGARD BUILDING INSPECTION DIVISION Msr
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
BUP
Date Requested AM PM BLD
Location / 36P '? _ 5 i'l/ �2 �/� G� Suite MEC
Contact Person Ph PLM
Contractor (J u i0.‘2aJ S Ph , JD SWR
BUILDING> Tena O wn A/, v;o6 f - 7 - 1,,Ac - RC e ELC
Retai rng Wall __ / ELR
Footing
Foundation FPS
Ftg Drain O I REQ_ITESTED-____) SGN
Crawl Drain Ili i,F�UND DURING RESEARCI1
Slab LNO-INSPECTION(s) FIL-EJ SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation � w ,,� �p
Drywall Nailing , pp e- /a2---16/ — q3 — ALL 1 -2�f/
Fire wall 6(2-?N \ Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Misc:
final'
PASS PART FAIL
PLUMBING
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill/Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk p
Other D Inspector Ext
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.