Loading...
Permit Support Document . CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 Date Requested: / /'1 A.M. P.M. MST: q^ v `/ Location: 3 4c LS Su, ,,,.„....at uo -O V ` BUP: ` ,' Tenant: Suite: B�. _ 1 • ,MEC: Contractor:'. ►Z.IIIA Phone: / c - 3S PLM: Owner: l Phone: ELC: ELR: SIT: BUILDING LD on't) PLUMBING MECHANICAL ELECTRICAL SITE Site s eam Post/Beam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation • Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire I. /Alm Crawl/Found Dr Heat Pump Low Volt • pprov Approved Approved Approved Approved Appr /Sdwlk . _ N. oved Not Approved Not Approved Not Approved Not Approved 1' - FINAL FINAL FINAL FINAL 13 4. S 5 \ J . - - . , . . . r..`5kr (96- 0 11') e- 1 Q S \ seks cl.A-,-,,,,,-A-r Lky--&-y-vA (-, 7- O L I° ( A--- 1 2F-5 S 1S ZiA 1 Su.tti. v ter ('fl- 6 `i 6 3) (- -Z ex.sS 4 St. . ,ter w cry -k LG1- 040.4) 4 'D 4 Cr"? -v.,.. r.,. (q)- o 44 44(1c) A-- 4 V-71'1 3 4 c ,.,. r o --A (, o(4661). A - ?IA's s r\) • • lii . 0 Call for reinspection 0 Reinspection fee of $ required before next inspection . 0 Unable to inspect Inspector: C Z Date: 1 ` /\ /0 /4 Page 7 of / ,,, ., 1 ____ • From: "David Scott' <DAVID.COT> To: rick, mikes, hap, george, jeanne, jean Date: Wed, 24 Dec 1997 14:23:42 +0000 Subject summerwood Reply -to: david@ci.tigard.or.us X- mailer. Pegasus Mail for Windows (v2.54) X- PMFLAGS: 128 0 To clear up any confusion that took place re: the termination of crawls out there...Hap anf I had told Tony that we would allow the crawls to discharge on adjacent grade...we allowed this because the buildings have foundation drains which would collect any water that migrated back toward the structure and then carry it out into the storm system...apparantly this message didn't get forwarded along anyway, over -all on the issue of the crawls...Tony has informed me that they are putting them in for everything...so we don't need to do any temp c of os if everything else is ok (incl pingleng) we can do regular c of os thanks Jeanne Temple —1 — Wed, 24 Dec 1997 14:52:15