Inspections 5 ` Z & t& t Wtr d3
1
•
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: (.5 A.M. P.M. MST:
Location: 11700 Su) dty j/� d aC) BUP:
Tenant: ( f Suite: Bldg: MEC:
t
Contractor
0..‘ dai Phone: 5 79 7 J DS- PLM: % ^o iac?
Owner: Phone: ELC:
feA'1714 "'/ ELR:
1 / 4 -A 2 , 21 d SIT:
B BLDG (con't) PLUMBING �j . MECHANI ELECTRIC SITE
Site Post/Beam c _ Pos Post/Beam Cover /Service Sewer /Storm
Footing " Roof UndFl/Slab Rough -In Ceiling a r me
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved Approved C,t ttv�
Appr /Sdwlk Not Approved Not A.. . • Not Approved Not Approved Not Approved
FINAL I • FINAL FINAL e firtki
O Call for reinspection O Reinspection fee of $ required before next inspection O Unable to inspect
r .
Inspector: /�- Date: _ / 2 qg Page i of •