Loading...
Report .. w HRISTENSEN 4,j2 NGINEERING, INC. CITY A OF r IGARO PLANNERS, CIVIL ENGINEERS, AND SURVEYORS Opnditianail .. •• •� PERMIT the wor k as deScr .( : ArtiPit 9 -30 -98 Sep Letter NO Ih 'bed i� • ..( � 96- 500.11 � : Follow.... 243 Job Address Att ach ... .. ..... ••( j JAMES PRICE By: ' 76 '7. •( p D &J CONSTRUCTION Date: s RE: DAKOTA MEADOWS DEAR JAMES: WE HAVE PROVIDED ANALYSIS FOR THE KEYSTONE WALLS YOU WISH TO BUILD. YOUR WALLS MAY GO UP TO 5 FEET WITHOUT REINFORCING, IF THE KEYSTONE STANDARD UNITS ARE USED. PER YOUR REQUEST, WE HAVE ALSO LOOKED AT USING REINFORCING FOR HIGHER WALLS UP TO 6 FEET, USING A KEYSTONE COMPACT UNIT IN CONJUNCTION WITH FORTRAC 35 -20/20 REINFORCING MATERIAL. A 6' WALL IN THIS CASE WILL REQUIRE ONE LAYER OF REINFORCING, 4' LONG, PLACED PER THE MANUFACTURER'S RECOMMENDATIONS ON TOP OF THE FOURTH BLOCK. FOR THESE DESIGNS, WE HAVE ASSUMED A LEVEL BACKFILL CONSISTING OF CLEAN 1 1/4" MINUS WITH NO FINES AND A NATIVE SOIL WITH AN ANGLE OF INTERNAL FRICTION OF 26 DEGREES. STANDARD DRAIN PIPE NEEDS TO BE INSTALLED FOR DRAINAGE, AND SUITABLE BASE EXCAVATION NEEDS TO BE CONFIRMED BY THE SOIL ENGINEER. 1u,4.g /246:.4.26-10 1 iLL -4-i- t IF YOU HAVE ANY QUESTIONS, PLEASE CALL US AT 503 -598 -1866. SINCERELY, c _ EDWARD K. CHRISTENSEN, P.E. PRINCIPAL 7150 SW Hampton Street, Suite 226 • Portland, Oregon 97223 • Phone: (503) 598 -1866 • Fax: (503) 598 -1868 E -Mail: cei @cybernw.com page / of 1 KEYSTONE RETAINING WALL DESIGN Based on Coulomb -NCMA (modified soil interface) Methodology KeyWall Ver lb, Oct 1, 1997 CHRISTENSEN ENGINEERING, INC. Project: D + J CONSTRUCTION 9/29 Date: 9/29/1998 Proj. No.: - By: RN Design Parameters Soil Parameters c psf ,x pd Reinforced Fill: 34 0 120 ` } "_` Retained Fill: 26 0 120 Foundation Fill: i v 26 `` fn„ 0 120 1S Reinforce Fill Type: S- minus v crushed stone or gravel I ,,ti : Unit Fill: Crushed Stone, 1 inch minus t` .' Factors of Safety Sliding: 1.50 Overturning: 2.00 Pullout: 1.50 Uncertainties: 1.50 Bearing: 2.00 Connection Peak: 1.50 Serviceability: N/A Reinforcing Parameters: Generic Geogrids Tult RFcr RFd RFid LTDS FS Tal Ci Cds Gen -15+ 2503 1.67 1.20 1.20 1041 1.50 694 1.00 1.00 Analysis: Section Unit Type: COMPAC Wall Batter: 7.10 deg. Leveling Pad: Crushed Stone Wall Ht: 6.00 ft embedment: 0.50 ft Level Backfill Surcharge: LL -- 0 psf uniform surcharge DL -- 0 psf uniform surcharge Results: Sliding Overturning Bearing Shear Bending Factors of Safety: 2.14 4.79 3.15 4.52 2.43 Calculated Bearing Pressure: 754 psf Eccentricity at base: 0.27 ft Reinforcing: (ft & Ibs /ft) Layer Height Length Reinf. Tal Tension Tconn FSpo 1 ^ 2.67 4.00 Gen -15+ 466 431 466 * 1.89 Reinforcing Quantities (no waste included): ( Efficiency= 62% ) Gen -15 +: 0.44 sy /ft y � ,) PROFF � E& V O A 16,166 r v � nor OREGON O � �p p 15 V -Ce CHR+ ' i r Z13 9 NOTE: THESE CALCULATIONS ARE FOR PRELIMINARY DESIGN ONLY AND SHOULD NOT BE USED FOR CONSTRUCTION WITHOUTREVIEW BY QUALIFIED ENGINEER Minneapolis, MN 55435 page I of • KEYSTONE RETAINING WALL DESIGN Based on Coulomb -NCMA (modified soil interface) Methodology KeyWall Ver lb, Oct 1, 1997 CHRISTENSEN ENGINEERING, INC. Project: D + J CONSTRUCTION 9/29 Date: 9/29/1998 Proj. No.: By: lc Design Parameters Soil Parameters c psf Reinforced Fill: 34 0 120 Retained Fill: 26 0 120 Foundation Fill: 26 0 120 Reinforce Fill Type: 0.75" minus crushed stone or gravel t Unit Fill: Crushed Stone, 1 inch minus Factors of Safety Sliding: 1.50 Overturning: 1.50 Pullout: 1.50 Uncertainties: 1.50 Bearing: 2.00 Connection Peak: 1.50 Serviceability: N/A Analysis: Section Unit Type: STANDARD (21.5 in) Wall Batter: 7.10 deg. Leveling Pad: Crushed Stone Wall Ht: 5.00 ft embedment: 0.50 ft Level Backfill Surcharge: LL -- 0 psf uniform surcharge DL -- 0 psf uniform surcharge Results: Sliding Overturning Bearing Shear Bending Factors of Safety: 1.71 1.81 2.89 N/A N/A Calculated Bearing Pressure: 748 psf Eccentricity at base: 0.36 ft „OD PROp s <V 5 1GINf4 4% 16,166 F s OREGON O j 5 1,15v Z 'QOk CHRISr( NOTE: THESE CALCULATIONS ARE FOR PRELIMINARY DESIGN ONLY AND SHOULD NOT BE USED FOR CONSTRUCTION WITHOUT REVIEW BY QUALIFIED ENGINEER Minneapolis, MN 55435 Main Office Branch Office PO Box 23814 4060 Hudson Ave. Tigard, OR 97281 Salem, OR 97301 Carlson Testing, Inc. Phone (503)684 -3460 Phone (503)589 -1252 Fax # (503)684 -0954 Fax # (503)589 -1309 August 19, 1998 b7 ---q5- 02- 6 3 #97-G1353 - 604 Beacon Homes 9500 SW 125th Ave. 9,, 11 Beaverton, OR 97005 — 4 1 / 0 FINAL SOILS LETTER DAKOTA MEADOWS - BUILDING PADS 1 -4 and 18 -25 CITY OF TIGARD, OREGON This letter confirms that as of August 11th, 1998, density testing on the granular engineered fill was adequately completed. Based on our observations and testing, the fill location was properly prepared and the fill achieved at least 90 percent of the modified Proctor maximum dry density. The above listed pads are suitable for foundation and slab support. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, l f /A 3/ ,e/ix) t6u CARLSON TESTING, INC. 446(A#4-40 t o P - / ja // GINf£ si 4743 4 — / /� r , C j�iit�c. -- N &L � 23 v4 19 2_" /l 30 / j " • Mes D. 00 e L,./0 re. 7 fq If aM )4(1 11,1 /i & , e ___ ao /f301-f N James D. Imbrie, P.E. d �kji,(._ Geotechnical Engineer a (- 1/ 3' / cc: City of Tigard a s- 039 ---, a3- LL376 = -.0 a5- toP 0) -litii, / �e' Ma! ,rfi. Branch Office � PO B23814 4060 Hudson Ave. ` Tigard, OR 97281 Salem, OR 97301 Carlson Testing Inc. Phone (503)684 -3460 Phone (503)589 -1252 Fax # (503)684 -0954 Fax # (503)589 -1309 August 19, 1998 - #97-G1353 ) ---rjeAA- Beacon Homes 9500 SW 125th Ave. C�J Beaverton, OR 97005 FINAL SOILS LETTER DAKOTA MEADOWS - BUILDING PADS 1-4 and 18 -25 CITY OF TIGARD, OREGON This letter confirms that as of August 11 th, 1998, density testing on the granular engineered fill was adequately completed. Based on our observations and testing, the fill location was properly prepared and the fill achieved at least 90 percent of the modified Proctor maximum dry density. The above listed pads are suitable for foundation and slab support. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. 101- ° a,k1 � c 50 PRcipi- t 12 6(�t ■ Fa i� e co E 14743 f £R /qk �� I ( Z 6 - -- _ na(ed ✓ / 7) 4 ‘ �_ 2 6,v_ ' %�� 1 �1G1'(.t? 0V AN ►cam / OREGON �r01 P� R' aLG� N, 23. N 4 �'ES b7,0 E 7 • (..- it7 1°I 11 3(t (u Ib EilMl L' ..• I132( Bi,c-Fck Co fnct , James D. Imbrie, P.E. Z 1 Geotechnical Engineer 1 • • "'A_ � 2 I (3) 6 ik-=� v e , cc: City of Tigard 2� Rai() () gD ro- o z`A I l 3 gel 6t,�. to _ •).5 ( 13_• _r - f • V /ZVIUV TILL V / :4J real aVJ o X7141 \.111t1...JV1y 1LJt11vb WJuu.3 • Main ' vice Branch Office `/ s PO Bc,_,3814 4060 Hudson Ave. Tigard, OR 97281 Salem, OR 97301 Carlson Testing Inc. Phone (503)684-3460 Phone (503)589 -1252 Fax # (503)684 -0954 Fax* (503)589 -1309 July 28, 1998 CTI #97 -G1353 Beacon Homes 9500 SW 125th Avenue Beaverton, Oregon 97005 FINAL REPORT OF EARTHWORK OBSERVATION AND TESTING DAKOTA MEADOWS SUBDIVISION TIGARD, OREGON Carlson Testing Inc. (CTI), has conducted on -call inspection services for the earthwork at the above residential development located off SW North Dakota & SW 105th PI in Tigard, Oregon. This final letter briefly summarizes our observations and testing during construction, and the as -built soil conditions to the best of our knowledge. Foundation design input has already been addressed in previous reports provided by CTI. In addition, CTI has reviewed and stamped the approved plans to verify that the previous recommendations were incorporated into the design of the foundations. SITE PREPARATION AND FILL PLACEMENT Based on our visual observations and our density test results, after stripping vegetation and topsoil, engineered fill using on -site soil was moisture- conditioned and placed on the following areas to a maximum depth of approximately 3 feet. LOTS: 5 - 17 and 23 - 25 Based on the in -place soil density results and our visual observations, it is our opinion that the engineered fill on the above lots was generally placed in conformance with the City of Tigard standards. On the attached test summary, lot tests LF -1 through LF -20 were density tests taken during both a morning and afternoon visit by CTI on 1 -9 -98. These test were slightly lower than the minimum compaction requirement. CTI conducted a follow up visit on 2 -3 -98 and retested the failing areas. All retests exceed the minimum compaction requirement. The retests are listed as structural fill tests SF -1 through SF -6. The engineered fill is considered suitable for support of spread footings. The remaining lots within the subdivision were either cut lots or lots left near original grade. 11200 lei t (d ✓ 0 &AAR-t J b ■ - 5 (l3� 1(2.10 6vk• 4.1D ,./ -� I (3 SO 6U (�Y� it 2-35 takf-retlo ,.., t 3_ 1( 2 6i,(4-(-4.10 ../ 4 .).. t122-0 X1.1 10 "\ i l - l l 21Q0 hi,uCo ,/ 1 it 280 6 &- . to '(H ((210 5 I 0 614_ o -- 09/Z9/99 WKll U7:44 FAA 503 Ei70 9147 CAKLSUN 11:5111\(; 41004 CTI #98-G1353 ,...-- , ,......., 98 -G 1353 `� Dakota Meadows • Page 2 CLOSING AND LIMITATIONS Our reports pertain to the materials tested /inspected only. This letter should not be construed to relieve or lessen the responsibility of the contractor or owner's site representative for this site work, but is provided for the minimum required governmental assurance. Our support was given on an as- needed basis as requested. If conditions are encountered during foundation excavation which differ from this report, then the developer (Beacon Homes), the contractor (GVS), and CTI should be allowed to review the condition before corrective actions are taken. Corrective work performed by the builder without notifying the above parties will be interpreted as an acceptance of the conditions encountered. Respectfully submitted, itli PR CARLSON TESTING, INC. t*GINEER Jo y 4. 14743 / 1, J p° may / � OREGON v4, 4�r 23.1990 ,ES D . 111: C-- 66-77 . C ' Brian D. Leach, E.I. James D. Imbrie, P.E. Engineering Associate Principal Engineer Attachments: Summary report of in -place soil density tests U9/Z9/99 WF.l) U7:44 FAA DU:$ ($70 9147 CAKLSON TESTING 10005 CTI #98-G1353 Dakota Meadows Page 3 APPENDIX A IN -PLACE DENSITY TESTING A minimum of 90 percent of the maximum dry density obtained from the Modified Proctor (AASHTO T -180) was required for engineered fill placed in the lots of this development. The field density testing was performed in general conformance with ASTM D2922 and D3017, utilizing a nuclear density gauge. A complete density test result summary is attached. Prefix designations on the test nos. indicate the type of fill being tested as follows: NC- No Code (general fill areas and backfill} LF- residential Lot engineered Fill RF- Roadway engineered Fill PS- Pavement Subgrade BC- Base Course RW- Retaining all backfill WT- Water line Trench ST- sanitary Sewer Trench DT- Storm Drain Trench Any suffix designation's (A, B, C, etc.) indicate results of retests which immediately follow the original failed test. 09/29/2111 WED 07.44 FAA 50:$ tt7U x147 CAKLSUN 1t,S1 4.1UUt) Construction Inspection & Related Test~ Carlson Testiirg, Inc. SUMMARY REPORT OF P.O. Box 23814 IN-PLACE DENSITY TESTS Tigard, Oregon 97281 Phone (503) 684-3460 JOB NO. 97 - G1�5� FAX (503) 684-0954 Jul 16, 1998 Client BEACON HOMES Project DAKOTA MEADOWS _ _ - - 8' i - 3 ^ .- 1 DATE OF TEST Eavrtium 'PAP= % ALL. RELD D CRY RELamIE DN TEST LOCATION ' oasmr COARSE MAX wOTTURt Dear' co)dractioN TEST NO P6I n 3 ) PARTICLES DENS. (%) aD1(0) t%) BC STATION 3+50 SW N DAKOTA TOP 1 18' RIGHT OF CENTERLINE 3- 6 144.6 7.7 137.5 9E DC 'STATION 4 +25 SW N DAKOTA TOP 12' RIGHT C CENTERLINE 3- 6 144.6 8.2 137.8 9t BC STATION 4+75 SW N DAKOTA TOP 3 16' RIGHT OF CENTERLINE 3- 6 144.6 6.8 137.5 9E LF LOT 51 CENTER +2.0 1 1- 9 144.6 5.5124.3 (3c LF LOT 61 CENTER +2.0' 2 . (7 1- 9 144.6 5.5 125.4 U, LF LOT 7: CENTER +2.0 1- 9 _ 144.6 6.1 126.4 2' LF LOT 8, CENTER +2.0 4 1- 9 144.6 5.6 123.5 g' LF LOT 91 CENTER +2.0 5 1- 9 144.6 6.4 121.4 E.• LF LOT 10+ CENTER +E.0 6 1- 9 144.6 6.1 121.9 8- LF LOT 11, CENTER +2.0 7 1- 9 144.6 6.6 1256 8 LF LOT 12, CENTER +2.0 s 1- 9 144.6 6.4 126.3 8 LF LOT 139 CENTER +2.0 1- 9 9 1 , 144.6 6 ..9 127.1 8 cc: CITY OF TIGARD ALPHA ENGINEERING INC CARLSON TESTING IN( Information contained herein is not to be reproduced, except in full, without prior authorization from this office. 09/Z9/99 WED 07:45 FAX 503 670 9147 CARLSON TESTING l¢J007 C arlson T Inc. • Construction Inspection &Related Te: SUMMARY REPORT OF IN -PLACE DENSITY TESTS P.O. Box 23814 Tigard, Oregon 97281 JOB NO. ?7 -C'1 353 Phone (503) 684 -3460 FAX (503) 684 -0954 Jul 16: 1998 Client BEACON HOMES Project DAKOTA MEADOWS SW NUR i H DAKOTA SW 105TH PL - I IGARU -- DATE OF TEST ELEV EVrH FIELD HELD DRY FE VINE TEST NO TEST LOCATION DAY D€N r cam MAX , o mom 0/0) PARTICLES DENS. (96) (m f R (Y.) LF LOT 55 FRONT CENTER -2.0 10 _ 1- 9 LF LOT 6, FRONT CENTER 144 6.1 127.0 g 11 -2.0 1- 9 LF LOT 71 FRONT CENTER -2.0 144^ E•2 124' 12 1- 9 LF LOT 0, FRONT CENTER 144.6 ° 122.7 13 -2.0 1- ' LF LOT 9, FRONT CENTER 1`14 ° .4 125.0 S 14 -2.0 1- 9 LF LOT 10 FRONT CENTER 144 ^ E 9 1``x'0 c. 15 -2.0 1- 9 LF LOT 11s FRONT CENTER 144 6 . 3 124.E 8( 16 -2.Q 1- 9 LF LOT 12, FRONT CENTER -2.0 144E • 0 125.3 17 1- 9 LF LOT 151 BACK CENTER 144. ��' • 124.7 8c 18 -2.0 1 - 9 LF LOT 16s 144 .6 7.0 126.1 87 BACK CENTER -2.0 19 1- 9, LF LOT 17/ SACK CENTER 144 6 °8 125.7 g7 ZO -2.0 1 LF CENTER OF LOT 17 144 t "° 125'3 Si 21 - 144.6 8 . 0 1 142.0 991 cc: CITY OF TIGARD ALPHA ENGINEERING INC CARLSON TESTING INC. Information contained herein is not to be reproduced, excevt in full, withou t n alohnri,arin., U,y /Z /bb 1thD U7 :45 FAX 5U:3 157U U147 CAKLSUN TESTING 410013 Construction Inspection & Related Test Carlson Testing, Inc. SUMMARY REPORT OF P.O. Box 23814 IN -PLACE DENSITY TESTS Tigard, Oregon 97281 Phone (503) 684 -3460 JOB NO. 97-G1:35"3 FAX (503) 6840954 Jul 163 1998 Client - HOME - N Project DAKOTA MEADOWS SW NUI 1 H DAKW H S 5W 1Ob 1 H 3-'L - 1 1UHHt) DATE OF TEST aEvroerro ae wa % Ai- RED FED DRY RELATIVE TEST NO TEST LOCATION Ana oaro Ary COARSE MRX MOISTURE oENSrrr cam�cTON r 1 ewner Es �r+s (x) W r rr'1 (�) LF CENTER OF LOT 23 144.6 7.5 137.8 9E LF CENTER OF LOT 24 23 2- 144.6 7.9 140.4 97 LF CENTER OF LOT 25 24 2- 3 144.6 8.8 143.3 9S SF FILL BETWEEN LOTS 5/6 1 3 144.6 8.1 142.5 95 SF FILL ' BETWEEN LOTS 7/8 2- 3 144.6 7.7 1==5.5 ' ?E SF FILL BETWEEN LOTS 9/10 • 3 2 3 144.6 7.9,141.1 9E SF FILL BETWEEN LOTS 11/12 4 2- 3 144.4 6.9 137.7 SF FILL BETWEEN LOTS 13/14 5 2 3 144.6 7.3 137.4 9E SF FILL BETWEEN LOTS 15/16 6 2- 3 144.6 8.2 1:39.8 97 ST STATION 2 +00 LINE "B" -1.0 1 SANITARY SEWER TRENCH 12- S 144.6 12.4122.0 84 ST STATION 1 +00 LINE "B" -1.4 2 SANITARY SEWER TRENCH 12- S 144.6 9.2 119.6 ?S� ST STATION 3 +00 LINE "A" -1.0 3 SANITARY SEWER TRENCH 12 S 144.6 9.6 123.0 SE cc: CITY OF TIGARD ALPHA ENGINEERING INC • CARLSON TESTING INC. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Ua /La /aa Y/t.11 UI:4O rAA DU." is /U a14r I.AKLJU1N Ito ll lvl, wJUua Construction Inspection & Related Tests Carlson Test , Inc. SUMMARY REPORT OF P.O. Box 23814 IN -PLACE DENSITY TESTS Tigard, Oregon 97281 Phone (503) 684-3460 JOB NO. 97 -G135 ' FAX (503) 684 -0954 Jul 16, 1998 Client BEACON HOMES Project DAKOTA MEADOWS SW NORTH DAKOTA & SW 105TH PL - TIGARD DATE OF TEST wax x ADJ. Rao Rao DRY - RtLATrvE TEST LOCATION � ( Frj DRYDEN51Y COARSE ?AV MO TURF DEN ou TEST NO pe/n PARr�clES { %? q/ 1 (x) ST LOT 19 LATERAL LINE "A" -1.0 4 SANITARY SEWER TRENCH 12- 8 144.6 118.5 S2 ST LOT 13 LATERAL LINE "A" -1.0 5 SANITARY SEWER TRENCH 12- 8 • 144.6 13.9119.5 5 ST STATION 2 +00 LINE "A" -3.0 6 SANITARY SEWER TRENCH 12- E4 144.6 15.2120.3 83 ST STATION 1 +75 LINE "A" -1.0 7 SANITARY SEWER TRENCH 12- E\ 144.6 12.9117.4 81 ST LOT 9 LATERAL LINE "A" -1.0 8 SANITARY SEWER TRENCH 12- 8 144.6 11.5121.5 84 ST STATION 1 +25 LINE "A" -4.0 9 SANITARY SEWER TRENCH 12- `3 _ 144.4 14.6123.6 86 ST LATERAL LOT 3 LINE "A" -1.0 10 SANITARY SEWER TRENCH 12- 8, 144.6 12.4120.3 8.2 , ST STATION 0 +10 ON NORTH DAKOTA -1.0 11 SANITARY SEWER TRENCH 12- 8 144.6 14.0125.4 871 ST LOT 6 LATERAL ON NORTH DAKOTA -1.0 12 SANITARY SEWER TRENCH 12- 8 144.6 12.7119.1 82 cc: CITY OF TIGARD ALPHA ENGINEERING INC CARLSON TESTING INC. Information contained herein is not to be reproduced, except in full, without prior authorization from this office.