Loading...
Report 6915 SW Nyberg - P104 F t , `h ; t ' Tualatin, Oregon 97062 , ti ; , ' , , Tel(503)702.8437 FIELD OBSERVATION REPORT ( f � 1 , _ „ �., nwgeoconsultants @frontier coin PROJECT ID Page 1 of 1 REPORT NUMBER Alpine View 9 OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE DATE DAY OF WEEK DR Horton Don Durst 9/12/12 Wednesday GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME 2:00pm 2:30pm GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE IT Sun MST 2012 -00130 TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL NGC REPRESENTATIVE Lot Subgrade Paul Crenna, C.E.G. LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 5 (formerly Lot 28) CONTRACTOR ACTIVITY. OBSERVATIONS, CONCLUSIONS, RECOMMENDATIONS. I made this visit at the request of Don Durst (as communicated to Brad Hupy PE, GE) to observe foundation excavation subgrade conditions for single - family home construction on Lot S located at 13369 SW Ouzel Lane. While on site, I spoke with Mr Durst over the phone At the time of my site visit, the foundation excavation had been completed to an approximate depth of 2 to 4 feet, and foundation forms were partially set I observed the subgrade soils visually and probed the near surface soils with a steel shaft probe. The subgrade consists of native, clayey silt soil with a very-stiff consistency Based on our observations and probing, the subgrade has been prepared in general conformance with theproject specifications and NW GEO Consultants LLC recommendations, and should perform as intended for sup. art of single - family home foundations as specified in our geotechnical report, dated March 5, 2012 The exc •vation subgrade is ready for placement of foundation forms • fi t •• I • Y 4•••'• 1pe a AI elk 10 I 6:PIRF.S1 J m, f i5 Przorve4A /0 fs.) A c ; Ai cfp___ A Preliminary report Is provided solely as evidence that the field observation was performed Observations, and /or conclusions, and /or El FINAL le PRELIMINARY recommendations conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report A final report is an instrument of professional service Any conclusions drawn from this report should be discussed with and evaluated by the professional involved ITEMS TO OBSERVE. CHECK. OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE /3 D ATE c , C - - / C _ / / / NGC s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction