Loading...
Plans Booth 107" W x 11'8" D x 8' H with 611 "x r area under stairs Booth 10.63 x 11.75 x 8.0 =1000 c ft Under Stairs 6.9x3x8 =166 cubic ft Total cubic ft = 1166 RECEIVED Plenum 10'7" W x 3' D x B E CEIVED Duct 30" Diameter 32'6" long with 2 90 deg. bends. jW Y OCT 0 8 2008 20' DP CITY OFTIGARD -C ,DP _ BUILDING DIVISION DP s' 30" Diameter Duct At-- 3'—P * Manual Pull s �1' ceder / �/ St abs / / +� TF Nszzl /// / DP Ilozzle TFP / ♦ V TFP Ilozzl • /1 � Fusible Link p Control Head IS 45 ABC IS 45 ALL 1 " PIPE 111 171_ 3 71 1 Cylindeu Manual Pull IS 18 ABC IS 18'S ALL 3.4" PIPE 11'8" Cylinder 314" Pipe /� I( 10'7" . Pipe CITY OF' TIG System to be installed by System to be installed at: Conditionally Approved . J United Fire and Safety Bridgeport Cabinets See Letter ta: Fel r .................. f I 4611 tE MLK Jr Blvd 9460 Tigard Street l Portland. OR 97211 Suite 104 � . � f 1: Mt = .„ (5031219 -0771 Tigard.ORContact: Ed Segar permit 1r , _. ; , e: ,, • y!y r isto Contact Ed Wallace 360 - 518 -3348 e:.1 -, • r�l,I��-w`'�I. CCB= 65290 Metro = 3093 jl Iji &VASI Data p,Jff m OFFICE COPY a lk � 2111E3E1EMIE CO R3". Industrial Dry Chemical Fire Suppression System INSTALLATION, OPERATION AND MAINTENANCE MANUAL, P/N 15040 Revision A, October 10 2002 AMEREX CORPORATION INC. - 7595 GADSDEN HIGHWAY - TRUSSVILLE, AL 35173 - February 5, 2002 Part Number 15040 System Design Page 3A -11 3A.3.2 Module Perimeter Coverage, Total Flood a) Cylinders: The Model IS45ABC is to be used for Module Perimeter Total Flooding applications. b) Nozzle: The Total Flood Perimeter (TFP) Nozzle, (P /N 17809) is used in both one and two nozzle installations on the IS45ABC. The nozzle must be properly oriented at the upper perimeter of the module being protected. c) Nozzle Coverages: Maximum Module Volume: 2,720 ft. per nozzle Maximum Module Area: 217.6 ft. per nozzle at 12.5 ft nozzle height Maximum Module Height: 12.5 ft. Maximum Module Side length: 16 ft. (either dimension) Note: Amerex Industrial Dry Chemical Systems have not been evaluated by Underwriters Laboratories, Inc. with respect to the total flood protection of hazards incorporating uncloseable openings exceeding 5% of the total hazard surface area. d) Temperature Range: The operating temperature range for Module Perimeter Total Flood applications is -40 ° F to 120 ° F (-40 ° C to 49 ° C). e) Piping Requirements: Piping diagrams include limitations on pipe length and fittings. System piping must be balanced. Balanced piping is that in which the difference between the shortest actual pipe length from the 1" TEE to nozzle and the longest actual pipe length from the 1" TEE to nozzle does not exceed 10% of the longest actual pipe length from TEE to nozzle. The number and type of fittings for both TEE to nozzle sections must be equal. All piping must be Schedule 40, hot - dipped galvanized steel pipe, and all fittings must be 150Ib. class. Examples of acceptable fitting materials include hot - dipped galvanized malleable iron, ductile iron, or steel. Couplings and unions may be used where necessary, and reducing bushings or reducing tees can be used for changes in pipe diameter. Note: Black steel pipe and fittings can be used in relatively noncorrosive atmospheres. f) Nozzle Placement and Orientation: The TFP Nozzle has been developed to provide application of extinguishing agent from the upper perimeter of the module being protected. The nozzle is to be installed through the top of the module, at the closest point to the intersection of the module wall and module top. The nozzle location, laterally, is to be at the midpoint of the adjacent module edge. [The nozzle may be offset laterally (side to side) from the midpoint as long as the maximum lateral horizontal distance from the nozzle to the module edge does not exceed 8 feet.] The tip of the module must be within 6" of its entry point. The nozzle is to be installed vertically, with the orifices pointing downward, and the engraved arrow pointing into the protected module. The arrow must be aligned perpendicular to the adjacent wall, when viewed directly from below. Proper nozzle placement is shown as follows: UL EX 5208 November 15, 2007 Part Number 15040 System Design Page 3A -12 3A.3.2 Module Perimeter Coverage, Total Flood (continued) LOCATE NOZZLE AT MIDPOINT 6" MAXIMUM FROM OF ADJACENT MODULE EDGE ENTRY POINT 0 8' MAXIMUM TO LATERAL MODULE EDGE HEIGHT WIDTH LENGTH TFP NOZZLE AS VIEWED DIRECTLY FROM BELOW: ORIENTATION ARROW, MUST POINT AWAY FROM ADJACENT MODULE EDGE 0 t 90• 0 f 0 ADJACENT MODULE EDGE UL EX 5208 November 15, 2007 ii Part Number 15040 System Design Page 3A -13 3A.3.2 Module Perimeter Coverage, Total Flood (continued) 1" 1 Nozzle tro Module Perimeter Total Flooding, IS45ABC, Single TFP Nozzle: Maximum Maximum # of Tees Pipe Size, in Length, ft # of Elbows Allowed 1 40 6 0 Cylinder to Nozzle -- 40 -- -- Total 1" Pipe The maximum nozzle height above the agent cylinder is 12.5 feet. UL EX 5208 November 15, 2007 Part Number 15040 System Design Page 3A -34 3A.4.2 Plenum Coverage, VPSB 3A.4.2.1 Standard Plenum Coverage, VPSB Plenum Type Nozzle Dimensions Maximum Nozzle Nozzle Nozzle Used Per Nozzle Specifications Location Offset* Orientation LxWxH Backdraft (Option 1) TF 4' x 15' x 10' Volume = 600ft 12" x 12" 0" to 6" Vertical, Pointing Area = 60ft Square, Downward Side = 15' Centered at Ceiling Backdraft (Option 2) TF 4' x 9' x 18' Volume = 648ft 12" x 12" 0" to 6" Vertical, Pointing Iti RIP Area = 36ft Square, Downward Side = 9' Centered at Ceiling Pantleg TF 4' x 15' x 12' Volume = 720ft 12" x 12" 0" to 6" Vertical, Pointing (Pantleg width Area = 60ft 2 Square, Downward dimensions: Side = 15' Centered at 11 1' minimum to Ceiling 3' maximum) Pit (Option 1) 3 -Way 24' x 4' x 4' Volume = 384ft Centered, 0" to 6" Vertical, Pointing Area = 96ft Length, Width, Downward; Two Side = 24' and Height of Opposite Side Plenum Holes Parallel tc Longest Side Pit (Option 2) D/P 24' x 4' x 4' Volume = 384ft End, 0" to 6" Horizontal Area = 96ft Centered Side = 24' . ill/ Pit with Tunnel 3 -Way Pit: 24' x 4' x 4' Volume = 576ft Centered, 1 /2 Pit Vertical, Pointing (Option 1) (Nozzle No Area = 144ft 2 Vertically; Height Downward; Each Further Than Side = 24' Centered, Side Hole 12' From Either Length of Pit; Aligned Parallel Pit End.) 12" From Start with Pit and , Tunnel: of Tunnel Tunnel Sections 12' x 4' x 4' Downdraft, Side 3 -Way Plenum: Volume = 640ft Centered, -- Horizontal, Each Exhaust With Vertical 24' x 4' x' 4' Area = 96ft 2 Length of Side Hole Transition (Nozzle no Side = 24' Plenum; Aligned Parallel o Further Than Centered, with Plenum and 12' From Either Width of Transition End of Plenum; Sections Plenum.) Centered, Transition: Height of 4' x 4' x 16' tall Plenum Under Floor TF 14' x 15' x 1' Volume = 210ft Side -Entry; 0" to 6" Horizontal <> Area = 210ft Centered, Side = 15' Vertically; Centered, Lengthwise (±6 ") *Nozzle Offset is the maximum distance from the tip of the nozzle to the nearest edge of the protected zone. UL EX 5208 November 15, 2007 Part Number 15040 System Design Page 3A -35 3A.4.2.1 Standard Plenum Coverage, VPSB (continued) 46 fr PIT OPTION 2: D/P 24' T � NOZZLE 2 I j TION 1: IL ' �, 4 7 4' 114 i_ � 12 4: `�, D/P 4 7 3 -WAY NOZZ NOZZLE 4_/ / \ 2 ,,., \� 7 24' 4' 4' WAL Y i �„ 2 4' \ O / 1'MIN.; NOZZ 3' TF MAX. / 12" I ith. NOZZLE q , It 18 1 4`/ .a 4',/ V 0 I 1' MIN.; ____,... 10 - 3' MAX. OPTION 1: 4 . TF 15 ( 4 ' NOZ �--- \ / f , 3-WAY 2 y / NOZZLE / 10' 4 _7/ i_ / 1.14 15' L/2 28' '.... ,. /. \ „4' T `C MAXIMUM OP1 �. 10N ?; -MAXIMUM 1F NO 4 . , (2 ) ZZLE NOZZLE III (2) � /- L/2 r 15 , ' 78 MAXIMUM /4 \ .,4'� 7 UL EX 5208 November 15, 2007 Part Number 15040 System Design Page 3A -38 3A.4.3 Duct Coverage, VPSB The D/P Nozzle will protect either round or rectangular ducts up to 28 feet in length. Any change in duct direction or additional length requires an additional D/P nozzle. The duct nozzle must be centered at the duct entrance, pointed in the direction of air flow. The tip of the duct nozzle must be within 6" of the duct entrance. Round Ducts Maximum Diameter, Single Nozzle = 46 Inches Maximum Diameter, Two Nozzles = 52 Inches (nozzle spacing: .5 x duct diameter, located on the same plane) .5 x DUCT DIAMETER Spacing for two nozzles, protecting a duct diameter larger than 46 ", up to 52" maximum Rectangular Ducts The following table shows sample maximum rectangular dimensions, based on the following two requirements: Maximum Perimeter = 144.5 Inches Maximum Diagonal = 46 Inches Rectangular Ducts Side 1, Inches Side 2, Inches, Maximum 12 44.4 14 43.8 16 43.1 18 42.3 20 41.4 22 40.4 24 39.2 26 37.9 28 36.5 30 34.8 32 33.0 32.5 32.5 34 31.0 36 28.6 38 25.9 40 22.7 42 18.7 44 13.4 UL EX 5208 November 15, 2007 Part Number 15040 System Design Page 3A -40 3A.4.4 Piping Limitations, Plenum and Duct, VPSB (continued) 3/4" 3/4" T1 Nozzle 3/4" 4 Nozzle Vehicle Paint Spray Booths, DUCT and STANDARD Plenum Coverages, ISISABC, Two Nozzles: Cylinder Nozzle Nozzle Type Piping Maximum Maximum Size Quantity Section Pipe Length, ft. # of Size, Elbows in. Any of the following Cylinder 3 / 4 36 4 ISI8ABC 2 combinations: to T1 - one 3 -Way and one D /P; - two D /P's; - two TF's; - one TF and one D/P T1 to 3 / 4 16 3 Nozzle The maximum elevation of the D /P, TF and 3 -way nozzles above cylinder is 23'4 ". UL EX 5208 November 15, 2007