Report 645+ 20/, - a if 6915 SW Nyberg - P104 Northwest GEO ' Tualatin, Oregon 97062 FIELD OBSERVATION REPORT Tel (503) 702 8437 Consultants, LLB nwgeoconsultants @frontier.com PROJECT ID DATE REPORT NO, Alpine View September 4, 201 2 8 OWNER/CLIENT OWNER /CLIENT REPRESENTATIVE DAY OF WEEK ' PAGE D R Horton (DHI) Reed Couch Tuesday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Don Durst 1300 1345 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT Pacific Earthworks Sunny, 80 °F TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL NGC REPRESENTATIVE Footing Subgrade NA Brad Hupy, PE, GE LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lots 30 & 37 Mid Size Trackhoe CONTRACTOR ACTIVITY, OBSERVATIONS, CONCLUSIONS, RECOMMENDATIONS: I made this site visit as requested by Don Durst to observe the conditions of subgrade for single family homes that will be constructed on Lots 30 and 37. At the time of my visit, the contractor had excavated lots 30 to 37 to subgrade elevations. The footing contractor was in the process of placing forms within lot 30. I observed and probed the subgrade using a 1/2-inch diameter steel foundation probe. The subgrade in both of the lots was very stiff to hard native silt. Based on observation and probing, the subgrade in both lots has been prepared in general conformance with ' the project specifications and my recommendations and will perform as intended to support single family home foundations. The areas are ready for placement of footing forms and reinforcement. Attachments: Photo Log A Preliminary report is provided solely as evidence that the field observation was performed. Observations, and /or conclusions, and /or FINAL ❑ PRELIMINARY recommendations conveyed in the final report may vary from and shall take precedence over those indicated In a preliminary report. A final Z report is an instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE, CHECK, OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE '• •'- DATE T 19/ 2— NGC's professionals are - `.resented on i e solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and specifications throughout the duration of the project, irrespective of the presence of our representative. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.