Loading...
Permit MASTER PERMIT t CITY OF T I GARD PERMIT ISSUED: 06/2 96 -- ,�,w74 - COM MUNITY DEVELOPMENT DEPARTMENT 13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639 -4171 PARCEL: 1 S 133CC —PB34 1 SITE ADDRESS...: 11577 SW TALLWOOD DR SUBDIVISION....: PEBBLECREEK #3 ZONING: R-25 . BLOCK........... LOT. ............: 4 1 Remarks: PATH I - BUILDING REISSUE: STORIES • 2 FLOOR AREAS BASEMENT...: 0 sf REQUIRED SETBACKS - - -- REQUIRED - CLASS OF WORK.:NEW HEIGHT : 25 FIRST • 1228 sf GARAGE • 546 sf LEFT • 5 SMOKE DETECTRS: Y TYPE OF USE...:SF FLOOR LOAD : 40 SECOND...: 853 sf FRONT • 15 PARKING SPACES: 1 . TYPE OF CONST. :5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT • 5 OCCUPANCY GRP.:R3 BDRM: 4 BATH: 3 TOTAL -- - - -: 2081 sf VALUE..$: 143894 REAR • 20 PLUMBING --- SINKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN DRAIN ft: 0 TRAPS : 0 LAVATORIES • 4 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: @ SF RAIN DRAINS: 1 CATCH BASINS..: 0 TUB /SHOWERS...: 2 GARBAGE DISP..: 1. WATER HEATERS.: 1 WATER LINE ft: 100 BCKFLW PREVNTR: 1 GREASE TRAPS..: 0 OTHER FIXTURES: 0 ---- - - - - -- MECHANICAL — FUEL TYPES FURN ( 1s4K ..: 0 BOIL /CMP ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: 1 /GAS/ / / FURN ) =100K ..: 1 UNIT HEATERS..: 0 HOODS • 1 OTHER UNITS...: 1 MAX IMP.: 0 BTU FLOOR FURNACES: 0 VENTS • 0 W00DSTOVES • 0 GAS OUTLETS...: 1 -- — — --- - -- ELECTRICAL — - - -- -- RESIDENTIAL UNIT - -- - -- SERVICE /FEEDER - - -- —TEMP SRVC /FEEDERS -- -- BRANCH CIRCUITS - -- - -- MISCELLANEOUS - - -- - -ADD'L INSPECTIONS- - 1000 SF OR LESS: 1 0 - 200 asp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 500SF.: 4 201 - 400 asp..: 0 201 - 400 amp..: 0 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0 LIMITED ENERGY.: 0 401 - 600 asp..: 0 401 - 600 asp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT • 0 MANF HM /SVC /FDR: 0 601 - 1000 amp.: 0 6@1 +asps - 10'x' a: 0 MINOR LABEL -10: 0 1000+ asp /volt.: 0 ------ - - - - -- PLAN REVIEW SECTION Reconnect only.: 0 ) =4 RES UNITS..: SVC /FDR) =225 A.: ) 600 V NOMINAL: . CLS AREA /SPC OCC: ---- - - - - -- ELECTRICAL - RESTRICTED ENERGY -- --- - - - ---- A. SF RESIDENTIAL - B. COMMERCIAL ---- - - - - -- --- AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: 0TH: :: X BOILER HVAC LANDSCAPE /IRRIG: PROTECTIVE SIGNL: GARAGE OPENER..: CLOCK INSTRUMENTATION: MEDICAL OTHR: .. HVAC DATA /TELE COMM.: NURSE CALLS • TOTAL # SYSTEMS: 0 Owner: - ---- -- -- --- Contractor: — TOTAL FEES:$ 4505.95 COSTA PACIFIC HOMES COSTA- PACIFIC HOMES 8625 SW CASCADE BLVD 8625 SW CASCADE AVE STE.606 SUITE #606 BEAVERTON OR 97008 BEAVERTON OR 97005 Phone #: 646 -8888 Phone #: 503 -646 -8888 Reg #..: 65157 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for sore than 180 days. -------- - - - --- -- REQUIRED INSPECTIONS Footing Insp PLM /Underfloor Framing Insp Gas Line Insp Water Line Insp Plumb Final Foundation Insp Mechanical Insp Framing Insp Gas Fireplace Water Service In Building Final Post /Beam Struct Plumb Top Out Shear Wall Insp Insulation Insp Appr /Sdwlk Insp Erosion Control Post /Beam Meehan Electrical Servi Low Voltage Gyp Board Insp Electrical Final Crawl Drain Electrical Rou/ Fireplace I sp Rain drain Insp Mechanical Final - Permittee Si.gnature:/ lr / ,C1,,__y � // Issued By : 411111k, !4 ei C j , ,. " Cal for inspect — 639- -4175 o 6065 - _./c /6 Residential Building Permit Application City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639-4171 5-89 Jobsite Address: 11577 SW Tallwood Drive ` e: s Subdivision: Pebble creek 43 Lot # 41 O Y.;; Valuation: :> :Contact; Date, / i: > /.'y ::: ni R ul es l u t'' New e Construction ' c tion O - ' • - "'''"ggiVq6 , - , :7. - qkt , 317.)... . ..,, Only: r Y (Square uae Footage) e 4 9) .la R • II : ' Perm #: MSTF:. q;.g;.; ;: <:-2 / >;: <: , • House: LO ` Garage: 5 �- (-17 i Rei :of ::::: ; :,;:. > : , Corner Lot? Y ;:` ::. ..: :..: N Fla Lot? Y N :.' Owner: Costa Pacific Homes ; lit# l C' . 'r �` Sf` �< ;.::. <:;:s= :`<;.`' ppro als Rq e aired > < ' : -. . Address: 8625 SW Cascade Blvd. #606 .::Planning: Setbacks : .• ;:J. : > - : :Solar _: Beaverton, OR 97008 ,. , Phone: ( 503 ) 64 - :`�Itei fired :;:: ;'': :;,;; ' "> " =; �;::`::>_ >'';., >�::' Contractor: q y e b ontrac o < ; ;.:; ' < '> _ `> : Address: c tors. russ • Phone: ; .. Note . :: Pu '` Contractor's License # 65157 - i (attach C fta h copy Of current f Or Oregon license) 9 on cen se Contact Name: Mardi Weller Contact Phone: ( 503 1 646 -8888 Subcontractors: Architect/Engineer: Iverson Associates Plumbing: Wolcott Plumbing Address: 151 Kalmus Drive C. 140 Mechanical: Arco -Installations Costa Mesa, CA 92626 (attach copy of current OR Contractor's License) Bear Electric Phone: ( 714 ) 549 -3479 JOB DESCRIPTION: /" 4 ( 1 . 7 ei(' kEkS ' Applicant Signature Applicant Phone number Received by: 0./ Date Received: ()5, d, H:Jogin \dsts4esapp Permit Account Description Amount Amt. Pd. Bal. Due - / nf%G- 0 27 L/ Bldg. Permit (BUILD) Sy 50 3 ^ - Plumb. Permit (PLUMB) Z - „2 L �°�- -- Mech. Permit (MECH) tlerait ) �- ___ _ Bldg: , 7.. / ,S ,� • �' Plumb: O L Mech: �•L.S Plan Check (PLANCK) $� E � 7i� /oz, Bldg: •352 -5 Plumb: Mech: if r. 2 //' Z ..Swift f - fJ Zs 7 Sewer Connection (SWUSA) e, i -(11 Sewer Inspection (SWINSP) 3 c 3)` Parks Dev Charge (PKSDC) J O $ 0 /0 $ 0 Residential TIF (TIF -R) / 7 0 / (I 70 Mass Transit TIF (TIF -MT) 1 Z. J / 2-e Commercial TIF (TIF -C) Industrial TIF (TIF -I) Institutional TIF (TIF -IS) Office TIF (TIF -0) Water Quality (WQUAL) l h)10 Water Quantity (WQUANT) j U' L / C Fire Life Safety (FLS) Erosion Cntrl Permit (ERPR11Ti) 6 y C -f Erosion Planck/USA (ERPLAN) . 7/ Erosion Planck/COT (EROSN) - ,3`o• \ TOTALS: Solar Balance Point Standard Worksheet Address ir511 5uJ Ta cUei . bir. - Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. 45° --► t i t \ NORTHERN NORTHERN LOT UNE LOT UNE N / North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along /� "" the described line. q(U feet 1 . I 1 N s f �, NCRT+SOU'H C�A,Ei 61cN = — '> `: ; ..Q Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure. The orientation of the ridge is also important. your residence? YCCISRR1 la: if the roof line runs North - South, measurements will / in \/'• (circle one) be based on the peak of the roof. c c a c NC -QM 1A 1B dr 1 b: If the roof line runs East - West and the roof pitch is N less than 5/12, measurements will be based on the eave. i4+CE x :N7 _.:LE 1c: If the roof line runs East -West and the roof pitch is /..' 5/12 or steeper, measurements will be based on the nn 12 . peak. ocy " `i: sM: xvr ,A;2 Box B. continued Box B: • 2. Measure change in elevation from front property line to finished floor elevation. If the lot slopes up from the front lot line to the foundation, the figure is positive. If the lot slopes down from the front lot line to the foundation, the figure is negative. - ft 3. Measure distance from finished floor elevation to the affected peak/eave. Z ft 4. If the roof line runs North- South, deduct three feet. If the roof line runs East -West, - ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation -from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing: - U ft 6. Total figure for box 8: Z ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation near the 2-2- ft affected peak/eave. 2. Measure the distance from the foundation to the affected peak or eave. 1 - j ft 3. Total figure for box C: 5 ft It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "0". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) Distance to North -south lot dimension (in feet) shade 100 '5 90 85 80 75 70 65 60 55 50 45 40 reduction line from northern I I'n- lin f ., t 70 40 '0 40 41 42 43 44 65 38 3 38 39 40 41 42 43 60 36 6 36 37 38 39 40 41 42 55 34 4 34 35 36 37 38 39 40 41 50 32 2 32 33 34 35 36 37 38 39 40 45 30 t0 30 31 32 33 34 35 36 37 38 39 40 23 3 28 29 30 31 32 33 34 35 36 37 33 35 _9 30 31 32 33 34 35 36 30 24 4 24 25 26 27 28 29 30 31 32 33 34 25 22 2 2 23 24 25 26 27 28 29 30 31 32 20 20 0 20 21 22 23 24 25 26 27 28 29 30 15 18 113 13 19 20 21 22 23 2 4 2 3 2 6 2 7 2 3 10 16 ¶6 16 17 18 19 2 0 21 22 23 24 25 26 3 14 I ' 14 13 16 17 18 19 20 21 2 23 2 4 Box D. Maximum allowed shade point " e i et: feet CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. t Post/Beam Mech. Shear /Sheath Framing Mec PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg) San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: /1— 7 — 9:6 A.M. P.M. Entry: / Address: // ,5 7 % �-e-Q Ctra'Ti" %9 t `// Tenant: Ste: MST: 96 OZ 7lc MEC: �71�C(, EC : PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: p -1-1) Inspe or: r � Date: \ (.0 P ("CO "I APPROVED DISAPPROVED /CALL FOR REINSP. - CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: A.M. P.M. Entry: Address: m - Tenant: Ste: MST: Cr BUP: Con /Own: MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: ......, C -- / /-..) '—(/) i'7 _ _ c ",,,ice ( c_-rt.2_c.,--.j Inspector: A c- /f a , _E./ RU (- Date: _ APPROVED DISAPPROVED /CALL FOR REINSP. CO .,/,(/' jzw . - . - iler 291 t c.L e iL - t CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 • Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling -Plumb. C Post/Beam Mech. Shear /Sheath Framing yr„ Plbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg) San. Sewer Gas Line Appr /Sdwlk Reins. Other: `7 "` £''' Al Date: _ ' & ` -- A.M. P.M. Entry: / / �,.tit:c� ,. � Ad e S �s , / / ,.. _, L —: Tenant: Ste: MST: 96 o 2 751 1. ME C: : f , � Con /Own:. ii . MC S ZG7� U – g/ Z� PLM: U r ELC: THE Fl e , I ING CORRECTIONS ARE REQUIRED: ELR: 0/s S&i T L. e__ 6voOD D2 . 5 ‘r)-- C k -k-f--1—...—L2 ' L , Ina AL. ... � , _ , '"UJC Ins ector: Date: 1 Mf.• APPROVED DISAPPROVED/CALL FOR REINSP. CF CO /. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /FIr /Slab Plbg. Top Out Insulation cow Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: //— / Date: 6, — 9 A.M. P.M. Entry: ,5 2 7 c �LG 9 Address: � / rSLL� �d�C �f.2� //� v, Tenant: jj z, � � (.62-. c Ste: MST: 7�' 0 Z 7' Con /Own: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: t-..i / - , , , " , j/ spector: IVt .4.4.....or Date APPROVED DISAPP"OVED /CALL FOR REINSP. CF CO 1 3/6/00 Activities for Case #: MST96 -00274 . 12:52:11 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 5/21/96 JH PASS BT2 5/30/96 MSTA008 Permit Created 5/30/96 RT PASS BT2 5/30/96 MSTA010 Check for prcl. restrict. 5/24/96 BON PASS BT2 5/30/96 MSTA012 Plans routed to Plans Examiner 5/24/96 BON PASS BT2 5/30/96 MSTA026 Plans approved by Plans Exmr 5/30/96 RT PASS BT2 5/30/96 MSTA030 Reviewed plans routed to DSTS 5/30/96 RT PASS BT2 5/30/96 MSTA705 Footing Insp 7/3/96 KS A/N KBS 7/3/96 #-1- electrical ground rod inplace tagged MSTA706 Foundation Insp 7/11/96 KS APP KBS 7/12/96 MSTA7•0 Post/Beam Structural 7/22/96 RB PASS BT2 7/29/96 MSTA711 Post/Beam Mechanical 7/22/96 RB PASS BT2 7/29/96 MSTA720 Mechanical Insp 9/10/96 RB PEND RB 9/13/96 see framing this date MSTA722 Plumb Top Out 9/11/96 MS PASS MRS 9/13/96 MSTA725 Framing Insp 9/9/96 KS DIS KBS 9/10/96 #- 1- positive connection glu /lam to plates at garage= front rear #-2- strap trimmers to header at garage #-3- add fl joist at plumbing waste #-4- provide full bearing under glu /lam adjacent to entry #-5- fireblock stud space at liv /rm # -6- firestop chimney chase #-7- full bearing under girder truss #t-8- adjust truss clips full penetration =nails MSTA726 Shear Wall Insp 9/9/06 KS DIS KBS 9/10/96 #-1- renail all shear panels as per schedule # -2- renail generic panels where nail have fracture outer layer of panel MSTA727 Low Voltage 11/1/96 MJR PASS MJR 11/1/96 MSTA735 Gas Line Insp 9/9/96 KS APP KBS 9/10/96 #-1- 21 psi for 15 minutes MSTA•45 Gyp Board Insp 9/19/96 RB PASS RB 9/19/96 pending- 1" b -vent clearance; missed nailing; green bd • req'mts. MSTA•55 Rain drain Insp 11/6/96 MS PASS MRS 11/6/96 no record of inspection record in file MSTA760 Water Line Insp 11/6/96 MS PASS MRS 11/6/96 record in file MSTA765 Appr /Sdwlk Insp 11/7/96 LT PASS JT 11/12/96 chip concrete out of weep hole in curb on west side of lot MSTA790 Electrical Final 11/1/96 MJR PASS MJR 11/1/96 MSTA795 Mechanical Final 11/7/96 RB PASS RB 11/8/96 Page 1 of 3 3/6/00 Activities for Case #: MST96 -00274 12:52:11 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA797 Plumb Final 11/4/96 MSR NR MRS 11/4/96 check folder for rd- water -sewer inspections MSTA799 Building Final 11/7/96 RB PASS JT 11/12/96 PENDING LETTER TO BE SENT TO MIKE SHEEHAN NOTED 11 -8 -96 letter received. mike s. approved. MSTB708 Erosion Control 11/1/96 USA PASS RB 11/8/96 MSTA724 Electrical Rough In 9/4/96 TLP PASS RB 9/10/96 MSTA725 Framing Insp 9/10/96 RB FAIL RB 9/13/96 plumbing top -out; shear req'mts- nail splice at rear wall of garage; secure HD's at side wall of garage. All other issues re: mech rough and framing corrections as per KS report - approved. MSTA080 (F) Ready to issue 5/31/96 CJS PASS CJS 5/31/96 MSTA092 (F) Issue combination permit 6/24/96 JMH J *H 6/24/96 MSTA097 Issue plumbing signature form 6/24/96 JMH J *H 6/24/96 MSTA098 Issue electric signature form 6/24/96 JMH J *H 6/24/96 MSTA717 PLM /Underfloor 7/23/96 7/19/96 MS PASS MRS 7/23/96 MSTA726 Shear Wall Insp 9/10/96 RB PEND RB 9/10/96 nail splice at rear wall of garage; secure HD's at side wall of garage. MSTA720 Mechanical Insp 9/12/96 RB PEND RB 9/13/96 incomplete! MSTA725 Framing Insp 9/12/96 RB FAIL RB 9/13/96 incomplete! MSTA726 Shear Wall Insp 9/12/96 RB FAIL RB 9/13/96 incomplete! MSTA740 Insulation Insp 9/12/96 RB FAIL RB 9/13/96 Prior issues regarding mech. /framing /shear req'mts incomplete- insulation not ready! MSTA725 Framing Insp 9/13/96 RB PEND RB 9/17/96 pending- close off return air cahse from electrical wiring; shear req'mts. MSTA726 Shear Wall Insp 9/13/96 RB PEND RB 9/17/96 pending- previous report contingent MSTA740 Insulation Insp 9/13/96 RB PEND RB 9/17/96 pending- framing, shear and mech. req'mts MSTA720 Mechanical Insp 9/17/96 RB PASS RB 9/17/96 MSTA725 Framing Insp 9/17/96 RB PASS RB 9/17/96 MSTA726 Shear Wall Insp 9/17/96 RB PASS RB 9/17/96 MSTA740 Insulation Insp 9/17/96 RB PASS RB 9/17/96 Page 2 of 3 3/6/00 Activities for Case #: MST96 -00274 12:52:11 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA790 Electrical Final 11/8/96 11/6/96 HW PASS RB 11/8/96 ALREADY SIGNED OFF BY MIKE RUDD. MSTA797 Plumb Final 11/12/96 MS PASS MRS 11/12/96 MSTA960 (F) Issue Cert. of Occupancy 11/8/96 JT 11/12/96 MSTA970 Case Finaled 11/14/96 RB PASS RB 11/14/96 Page 3 of 3