Correspondence i BOWEN� i ii DEVELOPMENT 3 g7 e) H COMPANY • December 23, 1997 Mr. David Scott Tigard Building Official City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 „Seit4—Ced 4 -eAAr RE: e Townhomes Dear Mr. Scott: Per a request by Hap Watkins, of the City of Tigard, we are sending you a copy of the letter from our Attorney, Mike Robinson, of Stoel Rives L.L.P., outlining the agreement between the City of Tigard and Bowen Development Company concerning the installation of low point drains at the above referenced project. Please be advised that we have decided to proceed with the installation of the low point drains at this project. To date, all of the completed buildings have sump pumps and drains installed to the exterior perimeter of each unit and are ready for inspection. The buildings under construction have all the preliminary work completed for the installation of low point drains. The completion of the work noted above will resolve all the items in the attached letter up to and including item # 5. The installation of the sump pumps and drains referenced above was completed after site visits with the plumbing inspector, Mike Sheehan, and the building inspector, Rick Bowen to review the proposed work. At these meetings, and in conversation with Hap Watkins, it was agreed that, where positive drainage away from the building was provided, exiting the sump pump drains to daylight at the building perimeter would be acceptable. We were instructed by Mr. Bowen to install drain rock at the point of exit of each sump pump drain. This work was completed. We recently had a final inspection for the plumbing in one of the buildings and were failed because the sump pump drains were not connected to the storm drainage lines. This seemed to be in direct contradiction of our earlier verbal agreements. We know it is possible for misunderstandings in matters such as these, but we have had several meetings and conversations regarding this detail and every indication given was that the proposed detail would be approved by the City of Tigard. I have talked with Hap Watkins and he has informed me that the connection of the sump drains to the storm system will not be required if the above conditions are met. He assured me that he would inform the field inspectors of this. Mr. Scott, we are proceeding to correct this problem in good faith. c:\my documentsV6r1901divl\city of tigard\12- 23- 97david scott.doc 1 of 2 12570 S.W. 69th • Suite 200 • Tigard, Oregon 97223 • (503) 598 -4522 voice • (503) 598 -0503 fax I �i BOWEN f= DEVELOPMENT COMPANY We have consulted with the of Tigard on the installation of these drains prior to commencing work. Based on our understanding, we proceeded to complete the work after having the exit point of the drain lines agreed to. This detail influenced our decision to proceed with the work, to resolve this issue and avoid further dispute. We would appreciate any involvement on your part in resolving this matter. Please call us at 598-4522 if you have any questions regarding this letter. Sincerely BOWEN DEVELOPMENT COMPANY Anthony Silvestrini Project Manager Dist David Scott - City of Tigard - via fax and mail File - City of Tigard • : F c :\my documents\96- 190 \divl \city of tigard\12- 23- 97david scott.doc 2 of 2 12570 S.W. 69th • Suite 200 • Tigard, Oregon 97223 • (503) 5984522 voice • (503) 598 -0503 fax • NOV 05 '97 16:11 FROM:STOEL RIVES 6032202480 T -T15 P.02/04 F -961 STOEL RIVES 1.1,p A T T O R N E Y S STANDARD INSURANCECENTGR 900 SW FIFTH AVENUE, SUITE 2300 roaTLAND. OREGON 972044268 Phone (5031229 -338P Fax (503) 22O -2ee0 TDD (503)221 -1045 Internet: www.ctarl.mm November 5, 1997 • MICHAEL. C. AOOINYON Direct Dial 003) 294 -9194 email mcrobinsonesroel.com VIA FACSIMILE Mr. David Scott Tigard Building Official Community Development Department 13125 SW Hall Blvd. Tigard, Oregon 97223 Re; Summerwood Towuhomnes Dear Mr. Scott: This law firm represents Bowen Development Company. This letter reflects the results of our telephone conference on November 4 which included yourself, me, Tony Silvestrini of Bowen Development and Hap Watkins of the City of Tigard. Bowen Development Company and the City have agreed to the following: 1. The final certificates of occupancy issued by the City for Buildings 1 and 5 will not be revoked. 2. The City will issue temporary certificates of occupancy for Buildings 2, 6 and 7. 3. The certificates of occupancy for Buildings 1, 2, 5, 6, and 7 will be subject to the following: A. Bowen Development Company reserves the right to file an appeal of the Building Official's decision requiring crawl drains. B. Bowen Development Company will commission a study by a qualified geohydrologist, after the City has reviewed and approved the scope of the study, to determine whether crawl drains are required for Buildings 1 - 9. If the study determines that ppXIA- 100167.1 2596600S SEATTLE PORTLAND VANCOUVER. WA Bwt;r• SALT LAKE CITY WASHINGTON, D.C. NOV 05 '97 16:11 FROM:STOEL RIVES 5032202480 T -T15 P.03/04 F -961 STOEL RIVES LLP Mr. David Scott November 5, 1997 Page 2 of 3 crawl drains are not required. The Building Official agrees to issue final certificates of occupancy for Buildings 2, 3, 4, 6, 7, 8 and 9 subject to any other requirements. If the study demonstrates that crawl drains are required, Bowen Development Company agrees to install crawl drains in all buildings and to diligently pursue commencement of such installation by May 1, 1998. If an extension of that date is required, the City and Bowen Development Company mutually agree that a reasonable extension will be granted and that the certificates of occupancy will be maintained. 4. Bowen Development Company agrees to construct Buildings 3, 4, 8 and 9 in such a way as to accept crawl drains if required. 5, The City agrees that upon inspection and approval of the crawl drains, it will issue final certificates of occupancy for Buildings 2, 3, 4, 6, 7, 8 and 9. 6. The City acknowledges and agrees that there are no other issues other than the crawl drains that will prevent issuance of temporary certificates of occupancy for Buildings 2, 6 and 7. This letter does not waive Bowen Development Company's right to seek damages from the City due to the negligent administration of the Building Code as applied in this matter. Bowen Development Company appreciates your assistance and cooperation, especially in regard to the issuance of a temporary certificate of occupancy for Lot 7, Building 2. Please call me if you have any questions about this letter. Please indicate your acceptance of these terms by executing n the space provided below and returning a copy to me, Very truly yours, Plaid49 C. friLA, Michael C. Robinson MCR:lxh cc: Mr. Walt Bowen (via facsimile) Mr. Anthony Silvestrini (via facsimile) PDX1M100187.1 159660009 NOV 05 '97 16:11 FROM:STOEL RIVES 5032202480 T -715 P.04/04 F-961 STOEL RIVES GLP Mr. David Scott November 5, 1997 Page 3 of 3 ACCEPTED AND AGREED TO: TIGARD COMMUNITY DEVELOPMENT DEPARTMENT By: David Scott, City of Tigard Building Official Date: PDX16- 100187.1 159E60009 IN Deer 23 97 03:54p Anthony Silvestrini 503 598 -0503 p.2 CJ BOWE 1 Off 7 HR [)E\ I J� • C.JC (.;O IIPkMT December 23, 1997 Mr. David Scott Tigard Building Official City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 RE: Summer Wood Village Townhomes Dear Mr.. Scott: • Per a request by Hap Watkins, of the City of Tigard, we are sending you a copy of the letter from our Attorney, Mike Robinson, of Stoel Rives L.L.P., outlining the agreement between the City of Tigard and Bowen Development Company concerning the installation of low point drains at the above referenced project. Please be advised that we have decided to proceed with the installation of the low point drains at this project. To date, all of the completed buildings have sump pumps and drains installed to the exterior perimeter of each unit and are ready for inspection. The buildings under construction have all the preliminary work completed for the installation of low point drains. The completion of the work noted above will resolve all the items in the attached letter up to and including item it 5. The installation of the sump pumps and drains referenced above was completed after site visits with the plumbing inspector, Mike Sheehan, and the building inspector, Rick Bowen to review the proposed work. At these meetings, and in conversation with Hap Watkins, it was agreed that, where positive drainage away from the building was provided, exiting the sump pump drains to daylight at the building perimeter would be acceptable. We were instructed by Mr. Bowen to install drain rock at the point of exit of each sump pump drain. This work was completed. We recently had a final inspection for the plumbing in one of the buildings and were failed because the sump pump drains were not connected to the storm drainage lines. This seemed to be in direct contradiction of our earlier verbal agreements. We know it is possible for misunderstandings in matters such as these, but we have had several meetings and conversations regarding this detail and every indication given was that the proposed detail would be approved by the City of Tigard. I have talked with Hap Watkins and he has informed me that the connection of the sump drains to the storm system will not be required if the above conditions are met. He assured me that he would inform the field i nspectors of this. Mr. Scott, we are proceeding to correct this problem in good faith. c:\my documents196- 1901div11city of tigard 112- 23- 97david scott.doc 1 of 2 Ded 23 97 03:54p Anthony Silvestrini 503 598 -0503 p.3 • n BOWEN I)EVELOPME ]' ❑I- A COMPANY We have consulted with the City of Tigard on the installation of these drains prior to commencing work. Based on our understanding, we proceeded to complete the work after having the exit point of the drain lines agreed to. This detail influenced our decision to proceed with the work, to resolve this issue and avoid further dispute. We would appreciate any involvement on your part in resolving this matter. Please call us at 598 - 4522 if you have any questions regarding this letter. Sincerely BOWEN DEVELOPMENT COMPANY Anthony Silvestrini Project Manager Dist: David Scott - City of Tigard - via fax and mail File - City of Tigard • c:\my documents196- 1901divl\city of tigard112- 23- 97david scott.doc 2 of 2 - i _.... � _ . . . . . ___ • . _ . . - ' ___ _ -_ . _ L Der 23 97 03:55p Rnthon Silvestrini 503 598 -0503 p.4 NOV 05 `9T 16:11 FR041:STOEL RIVES 5032202480 T - 715 P.02/04 F - 961 STOEL RIVES L1.P A T T O R N E Y S STANDARD INSURANCE CENTER 900 SW FIFTH AVENUE, SUITE 2300 PORTLAND. OREGON 9720+ -1268 Phone (503)224-3380 Fax (50712362480 TDD (503)121 -1095 karma: www.,tcdlwn November 5, 1997 • M1cw►se. C. ROsallooN Direct Dial (503) 294.9194 email merobinson®sloel.coln VIA FACSIMILE Mr. David Scott Tigard Building Official Community Development Department 13125 SW Hall Blvd. Tigard, Oregon 97223 Re: Summerwood Townhomes Dear Mr. Scott: This law firm represents Bowen Development Company. This letter reflects the results of our telephone conference on November 4 which included yourself, me, Tony Silvestrini of Bowen Development and Hap Watkins of the City of Tigard. Bowen Development Company and the City have agreed to the following: 1. The final certificates of occupancy issued by the City for Buildings 1 and 5 will not be revoked. 2. The City will issue temporary certificates of occupancy for Buildings 2, 6 and 7. 3. The certificates of occupancy for Buildings 1, 2, 5, 6, and 7 will be subject to the following: A. Bowen Development Company reserves the right to file an appeal of the Building Official's decision requiring crawl drains. B. Bowen Development Company will commission a study by a qualified geohydrologist, after the City has reviewed and approved the scope of the study, to determine whether crawl drains are required for Buildings 1 - 9. If the study determines that PDX1A- 101157.1 15966CM. SIATTL5 Mal. Amy VANCOUVI P. WA Rome SALT LAKE CRY WASHINGTON, D.C. Deb 23 97 03:55p Anthony Silvestrini 503 598 -0503 p.5 NOV 05 '97 16:11 FROM:STOEL RIVES 5031101480 7 -715 P.03/04 F -961 STOEL RIVES LLP Mr. David Scott November 5, 1997 Page 2 of 3 crawl drains are not required. The Building Official agrees to issue final certificates of occupancy for Buildings 2, 3, 4, 6, 7, 8 and 9 subject to any other requirements. If the study demonstrates that crawl drains are required, Bowen Development Company agrees to install crawl drains in all buildings and to diligently pursue commencement of such installation by May 1, 1998. If an extension of that date is required, the City and Bowen Development Company mutually agree that a reasonable extension will be granted and that the certificates of occupancy will be maintained. 4. Bowen Development Company agrees to construct Buildings 3, 4, 8 and 9 in such a way as to accept crawl drains if required. 5. The City agrees that upon inspection and approval of the crawl drains, it will issue final certificates of occupancy for Buildings 2, 3, 4, 6, 7, 8 and 9. 6. The City acknowledges and agrees that there are no other issues other than the crawl drains that will prevent issuance of temporary certificates of occupancy for Buildings 2, 6 and 7. This letter does not waive Bowen Development Company's right to seek damages from the City due to the negligent administration of the Building Code as applied in this matter. Bowen Development Company appreciates your assistance and cooperation, especially in regard to the issuance of a temporary certificate of occupancy for Lot 7, Building 2. Please call me if you have any questions about this letter. Please indicate your acceptance of these terms by executing n the space provided below and returning a copy to me. Very truly yours, MiLied Michael C. Robinson MCR:Ixb cc: Mr. Walt Bowen (via facsimile) Mr. Anthony Silvestrini (via facsimile) PDX1 A- 100167.1 139660/09 Deb 23 97 03:55p Anthony Silvestrini 503 598 -0503 p_S NOV 05 '97 16:11 FROM:STOE. RIVES 5032202480. T-715 P.04/04 F -961 STOEL RIVES 1.LF Mr. David Scott Novcmbcr 5, 1997 Page3of3 ACCEPTED AND AGREED TO; TIGARD COMMUNITY DEVELOPMENT DEPARTMENT By: David Scott, City of Tigard Building Official Date: PDX1A- 3OO187.1 1S9f6 9 10/06/97 08:28 11503 628 0271. SVVIMCRAFr 2002/003 — • • • ,{t, 9 -may k 0% WASHINGTON .`11: COUNTY, • OREGON • October 1, 1997 • Scholls Ferry LLC 121 SW Morrison St. #1000 Portland, OR. 97204 • RE: Swimming and Spa Pool Plan Review ' • Summerwood Townhouses (97-18, 19) Tigard, OR. 'Dear Sirs: , Your plans to construct a limited -use public swimming and spa pool located at 13495 • Summerwood Drive in Tigard, have been reviewed by the staff and are approved. All Conditions listed in previous letters must be followed. When the work is nearing completion, we will need to be advised so a prelicensing inspection can be scheduled. 'It should be noted, the pools are not to be used until they • have received an approved prelicensing inspection and a license has been issued. If you have any questions regarding the above, please contact William Ross at 648 -8722. Sincerely, m William M. Ross, RS, MPA, Supervisor Environmental Health and Sanitation WMR:lye • • cc: Swimcraft Department of Health & Human Services 155 North First Avenue Hillsboro, Oregon 97124 • WIC Nutrition Plan: (503) 640 -3555 Administration & Planning: (503) 693-4402 TDD: (503) 648-8601 Health Services: (503) 648 -8881 FAX: Clinic 693 -4522 ! Administration 6934490 Environmental Health: (503) 648 -8722 • 10/06/97 08:29 $503 628 0271 SWIMCRAFT j44, f 7- O 0003 /003 1 WASHINGTON COUNTY DEPARTMENT OF HEALTH AND HUMAN �R19 ES • CONSTRUCTION PERMIT for a SPRAY POOL SWIMMING POOL BATH HOUSE WADING POOL XSPA POOL EXPIRES DECEMBER 31, 1997 FEE:$405 EXEMPT THIS PERMIT IS NOT TRANSFERABLE POST IN A CONSPICUOUS PLACE This permit is issued to the person named herein to Scholls Ferry LLC 121 SW Morrison 5t., #1000 construct the facility and /orionsiofties indicated Portland, OR 97204 in .Revised Statutes, with the provisions Statutes, and Chapter 333 of the Administrative Rules. Upon written notification of completion of the above indicated facility in accordance with approved plans, a license application and fee needs to be submitted so that an operation license can be issued. October 1, 1997 Date issued f, DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL HEALTH AND SANITATION Surrmer000d Townhouses, 13495 Sumnerwood Dr.,Tigard, OR LOCATION /FACILITY NAME WCDPH SP -3 rev, WASHINGTON COUNTY DEPARTMENT OF HEALTH AND HUMAN SERVICES NO. 97 -18 CONSTRUCTION PERMIT for a X SWIMMING POOL BATH HOUSE WADING POOL SPA POOL SPRAY POOL EXPIRES DECEMBER 31, 199 FEE:$985EXEMPT THIS PERMIT IS NOT TRANSFERABLE POST IN A CONSPICUOUS PLACE Scholls Ferry LLC This permit is issued to the person named herein to 121 SW Morrison St, #1000 construct the facility and /or facilities indicated above Portland, OR 97204 in accordance with the provisions of Chapter 448, Oregon Revised Statutes, and Chapter 333 of the Administrative Rules. Upon written notification of completion of the above indicated facility in accordance with approved plans, a license application and fee needs to be submitted so that an operation license can be issued. 1 1997 v�U� Date issued issued 'DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL HEALTH AND SANITATION Surrmerwood Townhouses, 13495 Surrmerwood Dr.,Tigard, OR LOCATION /FACILITY NAME WCDPH SP -3 rev. • - •G%lVll l�I I �, , September 18, 1997 . • • CITY OF TIGARD Swimcraft OREGON 17756 SW Scholls Ferry Road Beaverton, OR 97007 RE: Summerwood Pool/Pool House Building Plan Review , 13495 SW Summerwood PC #: 9 -2c BUP#: 97 -0426 Occupancy: Al Occupant Load: 127 Submittal documents for the above referenced project have been reviewed for conformance with the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: gP00 EQUIPMEN T, 9Jrg ' C LTA W $ , F 1. There is no record of permits issued for this structure. Provide the following with appropriate applications: A. Three (3) site plans. B. Three (3) architectual. • C. Two (2) mechanical (provide BTU /h input of heater). D. Submit completed Energy Compliance Forms 2a, 3a, 3b, 4a through 4j, and 5a through 5c from the April 1, 1996 Revised Oregon Energy Code. %._�y.. .'+e. ", }ii. s "+��' o s <�p„ r� < c.,. k .i ;q ,rzr.,�.r aat;�,�;7°.. `ti.��� -.sax � . �> ��«^y " "•: ::-� ACCESSIBIL TAY: >Lr;. ,,rAEM ��T --4� W °.::. t• S " i:i ° x .ui, «-��;F. ; Y r , � �;�.,., >;�, -�, %try. �; .,c,� yr �'��+«'YTI .:�t���Y:<s;�».�1w.."°`,� ' s:,,.s;r�.;:.n:a�..,��o-:.�. ,a�a'v�.'..'�u...- ::raar �,.:.3�`a«?'�r�:�:: �_�...�L >' .�. 1. Parking accessible to persons with disabilities shall be provided. A. Accessible parking places shall be located on the shortest practical' accessible • route to the building entry [OSSC, Section 1104.4.5]. B. The accessible parking and access aisle shall be located on a surface with a slope not to exceed 2 %. C. Provide a more detailed parking lot plan. • 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Summerwood Pool /Pool House Building Plan Review PC #: 9 -2c BUP#: 97 -0426 Page #2 2. Accessible parking stalls for the disabled shall have signs and pavement markings of the international symbol of accessibility clearly visible and designated to standards adopted by the Oregon Department of Transportation [OSSC, Section 1104.1 and ORS 447.233]. 3. At least one accessible route shall be provided within the boundary of the site . from public transportation, public streets and sidewalks to an accessible building entry. 4. Gates providing access to the swimming pool shall have latching hardware providing access to persons with disabilities. Provide hardware details. • 5. Provide details on handicap lifts for the pool. 6. All doors with controls and hardware shall be of the type providing accessibility to persons with disabilities [OSSC, Section 1109.3]. Hardware on doors shall be lever or other shape not requiring tight grasping, pinching or twisting to operate. Controls shall require a force no greater than 5 pounds -force to activate [OSSC, Section 1109.3]. ;f=1RE AND NI= V: � .�..� ,� �� *- r � «%�.�;`�`' � q +- rxt�'i.� �", 1. Panic Hardware - The gate near the pool house may be omitted by the exception • in OSSC, Section 1016.4, however, panic hardware will be required on the rear gate. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sincerely, R ert Poskin, CBO PLANS EXAMINER •