Loading...
Inspection CITY OF TIGARD BUILDING INSPECTION DIVISION 24-Hour Inspection Line: 639-4175 Business Phone: 639-4171 Date Requested: (0 tg 9 A.M. P.M. MST: 9 D Location: I 3 9 c 5(A) Stoniuryte)tafarlet BUP: Tenant: Suite: Bldg: 3 MEC: Contractor: orlAA A / 1 -u o )-61.,.. Phone: 5,1 LI - (a ea.3 PLM: Owner: Phone: ELC: ELR: SIT: BUILDING BLDG n't) PLUMBING MECHANICAL ELECTRICAL SITE Site os eam Post/Beam Post/Beam Cover/Service Sewer/Storm Footing Roof UndFl/Slab Rough-In Ceiling Water Line Slab Framing Top Out Gas Line Rough-In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear/Sheath Fire • .. , Crawl/Found Dr Heat Pump Low Volt • Troy .k. Approved Approved Approved Approved Appr/Sdwlk ' • lit • •roved Not Approved Not Approved Not Approved Not Approved 40 FINAL FINAL FINAL FINAL 7 L.5 DO NOT COMBINE INSPEC.T1OOS - 130)G FINAL ONLY c 0 Call for reinspection r 0 Reinspection fee of $ tt 7uireqe espection 0 Unable to inspect Inspector: 1..0 Date: ' \/ Page of • l _ Page No. 1 CASE HISTORY FOR CASE NO.: MST97 -0426 BOWEN REAL ESTATE GROUP 13375 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTB092 (F) Issue combination permit / / / / 03/05/98 dummy permit for C/O 03/05/98 JT MSTB789 Smoke Detector / / / / / / 10/08/97 J +H MSTB799 Building Final / / / / 05/29/98 1. Fix hole in garage wall. FAIL RC 05/31/98 J +H 2. Spacing on verticals may not exceed 4- inches on guardrail. MSTB799 Building Final ./ / / / 06/18/98 As per RC report dtd.5- 29 -98. PASS RB 06/19/98 RB •