Loading...
Permit . i CITY OF TIGARD PERMIT PERMIT . MST96 -0116 COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 08/02/96 13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639 -4171 PARCEL: 1 S 133DB —FCIZI 13 SITE_ ADDRESS...: 13385 SW SUMMERWOOD DR r / n SUBDIVISION • - • --22: _ . . . -.1.. _, sc i � FN 4�d,g ZONING: R -25 BLOCK ° LOT ° 01 Gust/ 4o/Yt FS Remarks: SF ATTACHED UNITS, PARCELS 13 -18 AT BLDG #3 7881 sq. ft total - --- ---------- - - - - -- BUILDING REISSUE: STORIES • 2 FLOOR AREAS BASEMENT...: 0 sf REQUIRED SETBACKS - -- REQUIRED - CLASS OF WORM.:NEW HEIGHT • 0 FIRST • 0 sf GARAGE • 2110 sf LEFT : 0 SMOKE DETECTRS: Y TYPE OF USE...:SF9, FLOOR LOAD • 0 SECOND...: 0 sf FRONT • 0 PARKING SPACES: 0 TYPE OF CONST.:5N DWELLING UNITS: 6 FINBSMENT: 0 sf f RIGHT • 0 OCCUPANCY GRP.:R1 BORM: 0 BATH: 0 TOTAL - - - -: 0 sf VALUE..$: 501242 REAR • 0 - -- PLUMBING ._• SINKS • 6 WATER CLOSETS.: 18 WASHING MACH..: 6 LAUNDRY TRAYS.: 0 RAIN DRAIN ft: 0 TRAPS • 0 LAVATORIES : 24 DISHWASHERS...: 6 FLOOR DRAINS..: 0 SEWER LINE ft: 99 SF RAIN DRAINS: 6 CATCH BASINS..: 0 TUB /SHOWERS...: 18 GARBAGE DISP..: 6 WATER HEATERS.: 6 WATER LINE ft: 99 BCKFLW PREVNTR: @ GREASE TRAPS..: 0 OTHER FIXTURES: 6 -- MECHANICAL - ------ -- - - -- FUEL TYPES--- - - - - -- FURN (100K ..: 0 BOIL /CMP ( 3HP: 0 VENT FANS • 30 CLOTHES DRYERS: 6 /ELE /GAS/ / FURN ) =100K ..: 6 UNIT HEATERS..: 0 HOODS • 0 OTHER UNITS...: 18 MAX INP.: 0 BTU FLOOR FURNACES: 0 VENTS • 0 WOODSTOVES : 0 GAS OUTLETS...: 6 ELECTRICAL - -- RESIDENTIAL UNIT - -- - -- SERVICE /FEELER - - -- - -TEMP SRVC /FEEDERS -- - -- BRANCH CIRCUITS - -- - - -- MISCELLANEOUS - - -- - -ADD'L INSPECTIONS- - 1000 SF OR LESS: 6 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 500SF.: 6 201 - 400 amp..: 0 201 - 4w alp..: 0 1st W/0 SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0 LIMITED ENERGY.: 0 401 - 600 asp..: 0 401 - 6% amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT • 0 MANF HM /SVC /FDR: 0 601 - 1000 amp.: 0 601 +amps -1000 v: 0 MINOR LABEL -10: @ 1000+ asp /volt.: 0 -------- - - - - -- PLAN REVIEW SECTION Reconnect only.: 0 ) =4 RES UNITS..: X SVC /FDR) =225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC: ELECTRICAL - RESTRICTED ENERGY A. SF RESIDENTIAL B. COMMERCIAL AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO i STEREO.: FIRE ALARM INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: 0TH: :: BOILER HVAC LANDSCAPE /IRRIG: PROTECTIVE SIGNL: GARAGE OPENER..: X CLOCK • INSTRUMENTATION: MEDICAL OTHR: .. HVAC DATA /TELE COMM.: NURSE CALLS • TOTAL # SYSTEMS: 0 Owner: ------ - - - - -- Contractor: - -- TOTAL FEES:$ 19362.58 MCM ARCHITECTS BOWEN DEVELOPMENT CO 1022 SW SALMON SUITE 350 111 SW FIFTH AVENUE, SUITE 2260 PORTLAND OR 97205 PORTLAND OR 97204 Phone #: 222 -5757 Phone #: 627 -9928 TONY Reg #..: 074810 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. - REQUIRED INSPECTIONS Footing Insp PLM /Underfloor Low Voltage Gyp Board Insp Electrical Final Foundation Insp Mechanical Insp Fireplace -p Rain drain Insp Mechanical Final Post /Beam Struct Plumb Top Out Gas ,•n — " p i/ter Line Insp Plumb Final Post /Beam Meehan Electrical Servi - . �} •p ace Water Service 1_ Building Final , Crawl Drain Framing Insp 's -ti Ins, isi rwr •w k Insp Erosion Control Permittee Signature :ieer7 :40 Issued By: ezlie.4.4-4--,.._— Call for inspection — 639 -4175 61 (4 , -)1 LA to (p Commercial Building Permit Application City of Tigard �_ I, 13125 SW Hall Blvd. r / / 1 4 - Tigard, OR 97223 -4,1 i f» b y (503) 639 -4171 i /3355 L5 S /fee - ODD Pte- FAfro7 - . ,. rz° - Jobsite Address: , - - . :.... <; ;:.. . •:,:,).: . :Office Use O " :.:: :::/.5::::....i:!:::::::::::::::::::: : 1:::i::::.!:..:::: Tenant: Suite �' Valuation: J 1 �i� - eer. • b f rol, 2%4'2- - P erm it .# S�� .0 ) (6. . 4 Owner &Zell F^L4NC' /4 L_.(e2.d /�i.5 Map &.TL # : .:.:.... ... . • Address: // ..10(1 /`'r - 1W ee' R ..: Approvals Required : � : f oL 9 72497 : Planning: .,. " :: : .: Phone: X03) 2751 - cr Engineering: :::.. < . Contractor: , ` `' : 6 I.U1-6 (196(A,Cei6 13 — 1° . Address: �� 3 ,4 - /0 ,5 vN /3- „1 Type of const: Occupancy class: A l), Phone: Sprinklered? Yes No 7 ��� Contractor's License # 640441 _/I 0 (attach copy of current Oregon license) Sq. ft. of project: 0 sir Contact name & phone: Story (1st, 2nd, etc.) L _� ,'a� ` 4Y/6 - ‹ Proposed use: 9' ` r 140..r. Architect/Engineer: /lf! lf% /7 %r� 7 �J Previous use: 0V /i� 1 Address: /DZZ Sill alh ^/ # V Note: Plumbing & mechanical plans ' ?'LA, JZ5 nf2- 9 7 must be submitted at time of ' building permit application. Phone: (503 "ZVI,' S S7 JOB DESCRIPTION: V - . 1 l/ • I v • astep 4'J eS oil. 4' / • ne ,E- - • I epvr - i357,1/ A . .L. .. , 4 CeitAt 9 FP e- l/ AP / � e, _ .1 .122 4 s �s7 Ap :cant Signature & Phon mber / /1/014- J: ' 1 6.� Received by: ( /44� 4 Date Received: GP- / 3 96 . PERMIT # DESCRIPTION CODE • MOUNT AMOUNT PAID BALANCE DUE" / ;A4 • /1161 0//i Bldg Permit BUILD iiil J)38,C) Plmb Permit PLUMB //03/ /0 1103, 40 Mech Permit MECH • ;2 5'G 3� .25t, Elec Permit ELPRMT S/0 • CIO 810 I co Ltd Energy Permit ELPRMT 2-5 x ( J,51) . 60 State Tax csAme) bldg tax subtotal 6-3-6 7 ?0 plmb tax subtotal S5 / 7 mech tax subtotal / ELC tax subtotal 4 5U ELR tax subtotal 7, 5 ST TAX TOTAL TAX _ I 8 Plan Check Fees 70 �/ (Req. for all) bldg plan chk BUPPLN , 5 58 I..7 7 ti v — y7 D 7 plmb plan chk PLMPLN 2 BS 275, 86 mech plan chk MECPLN 6 1 2- 64, /3 elect plan chk ELPLCK 242.50 i 202 • SD (Req. w/ C) fire -life- safety chk FLS S. . - O 604, 17 e a/ — •18 417 PLAN CHK TOTAL S 20 Sewer Connection 5a Permit SWUSA )3,100.00 13,21 . 0O Sewer Inspection SWINSP 55.00 35.00 Park Dev Charge PKSDC 3. x, 00 3 OM, 0 0 TIF- Residential : . TIF -R tik /81'20,6 9-- TIF -Mass Transit TIF -MT i 4.. '724, CO g TIF - Commercial TIF -C -E•3– TIF- Industrial TIF -I 8- TIF- Institutional TIF -IS TIF - Office TIF -O �- T F INFO - �6 ' 6/,28/ 16 Water Quality WQUAL VAosvifts -4- Water Quantity WQUANT X00 CO Erosion Control Permit ERPRMT / 3 / ? G Erosion Plan y ' 240 Check - USA ERPLAN U 1/ ...- L l 1 l `— Erosion Plan o Check -.COT EROSN lI U 1.../ `i (../ ?� TOTAL ZI •6 Checked: a/i�� Date: -) % FEELIST/H/jh i ll . Permit #: i.•9 -//6o (A-61 / 3 �' F` p � / 3 fft5 j hr/mL GL / ¢ F Address: c ;;; z . . j Issued by: 64- CL1� Date: Y /279�o 5 Statement: Information Notice to Property Owners About Construction Responsibilities Note: Oregon Law, ORS 701.055(4), requires residential construction permit appli- cants who are not registered with the Construction Contractors Board to sign the following statement before a building permit can be issued. This statement is required ' for residential building, electrical, mechanical, and plumbing permits. Licensed architect and engineer applicants, exempt from registration under ORS 701.010(7), need not submit this statement. This statement will be filed with the permit. Fill in the appropriate blanks and initial boxes 1 and 2, and either box 3A or 3B: -dim 1. I own, reside in, or will reside in the completed structure. .'�0i,! 2. I understand that I must register as a construction contractor if the structure is sold or offered for sale 40 before or upon completion. El 3A. My general contractor is (Name) Contractor regis. # I will instruct my general contractor that all subcontractors who work on the structure must be registered with the Construction Contractors Board. OR 'e 3B. I will be my own general contractor. If I hire subcontractors, I will hire only subcontractors registered with the Construction Contractors Board. If I change my mind and hire a general contractor, I will contract with a contractor who is registered with the CCB and will immediately notify the office issuing this building permit of the name of the contractor. I hereby certify that t 1 ov : in . _ • do ►' rrect and that I have read and do understand the Information Notice to Pro ' • y 0 e� ab I : �u In Responsibilities on the reverse side of this form. of permit applicant t I 3 a (Signature P PP ( (White copy to issuing agency permit file, pink copy to applicant) 7 • Information Notice to Poperty Owners About ConstrucVon Pens , Vorice ()r, Th,s. '.`";;■ ,tc 1:on 2- Ir nu are iiet: ° o- '^ • • • • -;;• " •-• •- - • • - - ), awale e•t EMPLOYER RESPONSIBILITIES: If \Qi I1fJ pi-c.ons • the Com-Aril.. . rWig O ! :■,. : 11!prov• - camt a a 1-esich-,iti•d ;fl. you hirc will be (.:ITTIOyCC.i. r'31111):y ()r withholding tax law; employer, )ei_ nest from etTir•lti) - -n at the • `-•'• \kill he liable for tia) meats CV2 1;! n eur OITIOI., infOrni%itinn, Call the Oregon Dept of Re°.•ent re 94:•,-S091. U: insin•aace fix: s •te ,' wages of all einplo)Pes more informaer„ , •all the Ore 2,ott tl of at 378-3524. Workers' compensation insurance: A ii 0 cr. CC nr: '‘vorkcr, compensation insurarie,- your r he L;ubjed1 to penalties and will he lidble for all i ela.m cosi if ore i fl C■ITI: lho j()1 For- iu call he Workels' Compensation Division the Dep,tt .,f Jtic, 11 Services Scrvicc it 94: U.S. Internal Revenue Service: ..V4 an emplo)ci.)oit must ithhold I sIciul uceric ta., from :n-n- .\ fh 31i 1)L liable for the tax payment even if didn't actually For at 1-800-829-1040. OTHER RESPONSIBILITIES AND AREAS OF CONCERN: Code compliance: As the permit holder for this projee t, arc re spot siblc H LnivinO ;my failurc to meet ....ode tecuirefl -eittL that may be brought to your attention through inspections. Liabilit:t and property damage insurance: Contact your insurance agent to see if you ha‘ e adequate insurance coverage for accidents and omissions such as falling tools, paint overspra), water damage from pipe punctures, fire, or work that must he re-done. Time to supervise employees: Make sure you have sufficient time to supervise your employees. Expertise: Make sure you have the expertise to act as your own general contractor, to coordinate the work of rough-in and finish trades, and to notify building officials at the appropriate times so they can perform the required inspections. If you have additional questions, write or call the Construction Contractors Board (PO.Box 14140, Salem, OR 97309-5052, 503/378-4621). The Board is located at 700 Summer St. NE Suite 300, in Salem. prop-own.pm4 1/94 From: "David Scott' <DAVID.COT> To: rick, mikes, hap, george, jeanne, jean Date: Wed, 24 Dec 1997 14:23:42 +0000 Subject summerwood Reply -to: david @ci.tigard.or.us X- mailer: Pegasus Mail for Windows (v2.54) X- PMFLAGS: 128 0 To clear up any confusion that took place re: the termination of crawls out there...Hap anf I had told Tony that we would allow the crawls to discharge on adjacent grade...we allowed this because the buildings have foundation drains which would collect any water that migrated back toward the structure and then carry it out into the storm system...apparantly this message didn't get forwarded along anyway, over -all on the issue of the crawls...Tony has informed me that they are putting them in for everything...so we don't need to do any temp c of os if everything else is ok (incl ping/eng) we can do regular c of os thanks • Jeanne Temple —1 — Wed, 24 Dec 1997 14:52:15 Page No. 1 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE-GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTA005 Application received / / / / 02/13/96 RECD JMH 01/02/97 GES MSTA008 Permit Created / / / / 03/21/96 PASS JMH 08/02/96 JDA MSTA010 Check for prcl. restrict. / / , / / 03/21/96 PASS JMH 08/02/96 JDA MSTA012 Plans routed to Plans Examiner / / / / 04/23/96 used this action for p.r. to typing PEND JHF 04/23/96 JHF 04/23/96 MSTA026 Plans approved by Plans Exmr / / / / 05/28/96 APPR JHF 05/28/96 JHF MSTA030 Reviewed plans routed to DSTS / / / / 06/07/96 APPR JHF 06/06/96 JHF MSTA080 (F) Ready to issue / / / / 07/31/96 PAID JMH 07/31/96 J *H MSTA092 (F) Issue combination permit / / / / 08/02/96 - PASS JDA 08/02/96 JDA MSTA097 Issue plumbing signature form / / / / 12/06/96 OK JDA 12/06/96 KAS MSTA098 Issue electric signature form / / / / 12/06/96 OK JDA 12/06/96 KAS . MSTA705 Footing Insp / / / / 09/04/96 APP GS 09/04/96 GES MSTA705 Footing Insp / / / / 01/21/97 garages PART GS 01/21/97 GES MSTA706 Foundation Insp / / / / 01/24/97 gar walls PART GS 01/24/97 GES MSTA710 Post /Beam Structural / / / / 09/23/97 P&B /Mach & Structural Corrections FAIL RB 09/26/97 J *H needed: 1. Remov debris (Wood, B4, B5, B6). 2. Support heat plenum B5 where lacking. 3. Overspanned girders at all B -units 12' -9" (max. 11' -2 ") 4x8. 4. Bearing post at ends need min. 3 -in. • wood -to- concrete (B5,B6) All units. 5. Rim girder against girder (A -10). 6. A -10 - Insulate heat duct (metal). 7. A -10 - Spread vapor barrier over ground exposed. 8. Remove debris (wood) A -10, A -11, A -12. 9. Support notched girder against wall) A -11, A -12. 10. Add floor support at all plenum • boxes through floor. CALL FOR REINSPECTION. MSTA717 PLM /Underfloor / / / / 09/16/97 PASS RAB.09/16/97 RAB. MSTA720 Mechanical Insp / / / / 01/27/98 BUILDINGS: A -12, A -11, A -10, B -6; B -5; FAIL RB 01/27/98 RB B -4. GAS LINE TESTS FAILED IN ALL UNITS EXCEPT B -6 (323348) & B -5 (323309) A -12- RETURN AIR NOT INSTALLED YET REMOVE DRAFT STOP W /IN FIREPLACE SUPPORT RIGID WYE DUCT FOR EXHAUST IN ATTIC FIRESTOP FLOOR AT HEAT DUCT CHASE Page No, 2 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By DOWN STAIRS TERMINATE RANGE VENTING TO EXTERIOR. FURNACE PLENUM NOT AFFIXED YET GAS LINE W/O CONNECTIONS TO APPLIANCE CLEAR UNDER - FLOOR VENT HOLE AND SCREEN AS REQ'D FURNACE NOT SET YET A -11- MOVE NYLON STRAP AWAY FROM B -VENT DOWN STAIRS EXHAUST VENT DISCONNECTED SUPPORT RIGID WYE DUCT FOR EXHAUST IN ATTIC FIRESTOP FLOOR AT HEAT DUCT CHASE DOWN STAIRS TERMINATE RANGE VENTING TO EXTERIOR FURNACE PLENUMS NOT AFFIXED YET GAS LINES W/O CONNECTIONS TO APPLIANCE CLEAR UNDER -FLOOR VENT & SCREEN AS REQ'D FURNACE NOT SET YET A -10- SUPPORT RIGID WYE DUCT FOR EXHAUST IN ATTIC TERMINATE RANGE VENTING TO EXTERIOR FIRESTOP FLOOR AT HEAT DUCT CHASE DOWN STAIRS FURNACE PLENUMS NOT AFFIXED YET - GAS LINES W/O CONNECTIONS TO FURNACE CLEAR UNDER -FLOOR VENT HOLE AND SCREEN AS REQ'D FURNACE NOT SET YET B -6- MAINTAIN 1" CLEARANCE FOR B -VENT GYPSUM FLOOR RETURN AIR TO BE INSTALLED FOR PLENUM SUPPORT RIGID WYE DUCT FOR EXHAUST IN ATTIC TERMINATE RANGE VENTING AT EXTERIOR FIRESTOP FLOOR AT HEAT DUCT CHASE DOWN STAIRS FURNACE PLENUM NOT AFFIXED YET GAS LINES W/O CONNECTIONS TO FURNACE CLEAR UNDER -FLOOR HOLE AND SCREEN AS REQ'D FURNACE NOT YET SET B -5- SUPPORT VERTICAL B -VENT AT 10' INTERVALS SUPPORT RIGID WYE DUCT FOR EXHAUST IN ATTIC Page No, 3 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd Code • Sent Done Done Date By • GYPSUM FLOOR CAVITY TO BE USED FOR PLENUM TERMINATE RANGE VENTING AT EXTERIOR FIRESTOP FLOOR AT HEAT DUCT CHASE DOWN STAIRS EXHAUST VENTING DISCONNECTED AT BEDRM FURNACE PLENUMS NOT AFFIXED YET GAS LINES W/O CONNECTIONS TO FURNACE CLEAR UNDER- FLOOR HOLE VENT AND SCREEN AS REQ'D FURNACE NOT SET YET B -4- SUPPORT VERTICAL B -VENT & MAINTAIN 1" CLEARANCE SUPPORT RIGID EXHAUST DUCT WYE- SEAL JOINTS GYPSUM FLOOR CAVITY TO BE USED FOR PLENUM- RETURN AIR. TERMINATE RANGE VENTING TO EXTERIOR FIRESTOP FLOOR AT DUCT CHASE EXHAUST VENTING BELOW SOFFIT LEVEL IN BEDRMS FURNACE PLENUMS NOT AFFIXED YET GAS LINE W/O CONNECTIONS TO FURNACE CLEAR UNDER -FLOOR VENT AND SCREEN AS REQ'D FURNACE NOT SET YET. MSTA720 Mechanical Insp / / / / 01/30/98 SEE FRAMING THIS DATE FAIL RB 01/30/98 RB MSTA720 Mechanical Insp / / /- / 02/06/98 pending- termination of range vent w /in PASS RB 02/09/98 RB floor system gyp plenum need to have edges open • sealed up MSTA722 Plumb Top Out / / / / 01/21/98 PASS MS 01/21/98 MRS MSTA725 Framing Insp / / / / 01/30/98 THIS INSPECTION DOES NOT INCLUDE FAIL RB 01/30/98 RB FURNACE(S) AND HOT WATER HEATERS. INSULATE RETURN AIR PLENUMS AT ALL A -UNITS IN GARAGE. EXTEND RANGE VENT TO EXTERIOR - UNIT A -12 ENCLOSE LIDS OF CLOSETS AT MAIN ENTRY - GYP OK SEAL PLENUM W /IN FLOOR STSYEM FOR RETURN AIR IN B -UNITS SHEAR REQM'T AS PER ENGINEERING REQUESTED • Page No, 4 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17•/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTA725 Framing Insp / / / / 02/06/98 Framing & insulation approved pending: PASS RB 02/06/98 J *H 1. Fill void over shower each #B -6. 2. Terminate range vent at #B -6 ext. 3. Gyp plenum need open gaps sealed. MSTA726 Shear Wall Inap / / / / 01/02/98 partial- block & nail garage wings FAIL RB 01/05/98 RB nail gyp sheathing gyp should have been secured to bottom plate - engineering complete gyp cover where lacking nailing missed at frontal OSB sheathing - 1st 4- units. • MSTA735 Gas Line Insp / / / / 01/27/98 SEE MECH ROUGH THIS DATE PART RB 01/27/98 RB MSTA735 Gas Line Inap / / / / 01/30/98 A -12 PASSED- NO TAG FAIL RB 01/30/98 RB A -11 FAILED A -10 FAILED B -6 PASSED- ALREADY TAGGED B -5 PASSED- ALREADY TAGGED B -4 PASSED- NO TAG MSTA740 Insulation Insp / / / / 10/13/97 Conditional approval: Protect insulation COND RB 10/14/97 J *H from weather conditions. MSTA740 Insulation Inap / / / / 02/06/98 PASS RB 02/06/98 J *H MSTA740 Insulation Inap / / / / 02/06/98 pending- framing issues PASS RB 02/09/98 RB MSTA745 Gyp Board Insp / / / / 02/11/98 firewalls only let layer PART RB 02/12/98 RB MSTA745 Gyp Board Insp / / / / 02/17/98 PENDING- 1" b -VENT CLEARANCE PASS RB 02/17/98 RB MISSED NAILING THRU OUT • MSTA750 Firewall Insp / / / / 01/06/98 ABOVE CEILING- BEHIND SHOWERS- WITHIN FAIL RB 01/07/98 RB • CHASES- SIDE ATTICS 1st Layer nailers missed missed nailing- 7" oc req'd rock wool missing from from firestopping locations the noted locations above incompleted cover firetape /mud as req'd joint connections • Page No. 5 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTA750 Firewall Insp / / / / 01/08/98 FAIL RB 01/08/98 RB NOT READY FROM PRIOR ISSUES- NOTE THAT PRIOR INSPECTION WAS TERMINATED FOR LACK OF COMPLIANCE ISSUES. FULLY INSPECT FIREWALL FOR 1 -HR RATING. MSTA750 Firewall Insp / / / / 01/09/98 pending - GA WP3820 reviewed pg. A701 PART RB 02/09/98 RB .plans mud /tape all joints in all areas to become tbru penetrations Rock Wool- and block locations req'd at floor /ceiling levels and unit connections. MSTA750 Firewall Insp / / / / 02/06/98 pending- rock wool open gaps abobe PASS RB 02/09/98 RB shower MSTA750 Firewall Insp / / / / 02/11/98 a -10 garage- upper plate needs to be PASS RB 02/12/98 RB covered b -6 missed nailing w /in water closet N. bedrm E. S. bedrm wall. MSTA750 Firewall Insp / / / / 02/17/98 PASS RB 02/17/98 RB MSTA755 Rain drain Insp / / / / / / 03/21/96 J *H MSTA757 Roof Nailing / / / / 12/22/97 pending- maintain 1/8" gaps at PASS RB 12/22/97 RB • ends /edges nailing missed flush nail- do not penetrate sheathing maintain req'mts as per prep and materials used MSTA795 Mechanical Final / / / / 05/29/98 Entered to show Ron's inspection. PASS RC 06/22/98 J *H MSTB704 Sewer Inspection 05/08/98 / / 05/08/98 05/08/98 J *H MSTB705 Footing Insp / / / / _ 01/02/97 2 of 4 garages PART GS 01/02/97 GES MSTB708 Erosion Control / / / / / / 03/21/96 J *H MSTB710 Post /Beam Structural 10/29/97 / / / / 10/29/97 J *H MSTB710 Post /Beam Structural / / / / 10/10/97 P&B Framing & Mech contingent to special PART RB 06/19/98 RB inspection report submittal. MSTB711 Post /Beam Mechanical / / / / 10/01/97 PASS GS 10/01/97 J *H • • • • • . Page No, 6 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTB711 Post /Beam Mechanical 10/10/97 / / 10/09/97 MECH & STRUCTURAL P&B: PEND RB 10/10/97 J *H 1. Pending issues from previous inspections, review reports for compliance. Contractor desires to move forward with construction and protection of insulation for both metal and flex heat ducts. 2. Provide special inspection report for low point drains and pictures to reflect notched beam support. 3. Support all ducts missing straps and hangers. NOTE: Under -floor (mech.) ventilation to be achieved by heat /duct underneath stairs - once constructed. MSTB713 Crawl Drain /Backwater valve 01/28/98 / / / / sump pump installed for low point drain NOTE 06/19/98 RB problem MSTB714 Ftg Drain Bsm't Walls / / / / 09/25/96 APP GS 09/25/96 GES MSTB715 Slab Insp 01/28/98 / / / / N/A 06/19/98. RB MSTB717 Underfloor insulation / / / / 10/10/97 PART RB 10/29/97 J *H MSTB723 Electrical Service 01/28/98 / / 01/28/98 'PASS BRP 01/28/98 J *H MSTB724 Electrical Rough -in 01/28/98 / / 01/28/98 ' PASS BRP 01/28/98 J *H • • • Page No, 7 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By ---- - -- -- - ----- --- MSTB725 Mechanical Insp 01/28/98 / / 02/04/98 Insulation, Framing, Mechanical: FAIL RB 02/04/98 J *H 1. Prep for drywall along garage 1 -hr firewall. Below soffit in garage add drywall Hailers, between studs - b-units. 2. B4: Return air (floor system) blocked off. 3. Furnace and hot water heaters to be set at or near final: Vehicle barrier required for protection of furnaces. 4. Pitch greater than 3:12 required to have batt material placement R -30 required. 5. In B Units: Rock wool required at roof level where lacking. Make sure that installation of rock wool is tight. 6. Disregard - corrected. 7. Firecaulk thru hole penetrations between units above ceiling, IE wiring and plumbing. 8. 2nd layer: Firewall above ceiling nailing OK: need to seal joints. 9. B -5: Return air (floor system) open end. 10. B -6 Return air floor system unknown exactly how furnace will be affixed to system. 11. Pill cavities of side wall in A- Units. 12. Insulate return air duct within attic of A -unit garage. 13. Insulate perimeter of down -draft furnace within garage. 14. Insulate door headers of garage dwelling. 15. Thru hole penetrations missed at plates, etc. MSTB725 Mechanical Insp / / / / 02/06/98 Pending approval of final issues. PASS RB 02/06/98 J *H (Terminate range vent at B -6 to exterior. Gyp plenum needs gaps sealed.) MSTB729 Plumbing Top Out 01/28/98 / / / / As noted in case history already !!! PASS 06/19/98 RB 1/21/98 MS • • Page No. 8 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTB730 Framing Inap 01/28/98 / / 02/04/98 See Insulation Inspection this date FAIL RB 02/04/98 J *H (combo inspection w /firewall, mach, insulation, framing & shear). MSTB737 Roof Nailing 01/28/98 / / / / 01/28/98 J *H MSTB740 Gas Line Insp 01/28/98 / / 02/04/98 Gas Line approved for Units A -10 & A -11 PASS RB 02/04/98 J *H only: A -11: 24.5 # A -10: 29.5 # • • Page No. 9 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - --- - -- - ------- - -- MSTB745 Insulation Insp 01/28/98 / / 02/04/98 Insulation & Framing: FAIL RB 02/04/98 J *H 1. Prep for drywall along garage - 1'hr. firewall below soffit in garage add drywall nailers between studs - b vents. 2. B -4: Return air (floor system) blocked off. • 3. Furnace and hot water heaters to be set at or near final: Vehicle barrier required for protection of furnaces. 4. Pitch greater than 3:12 required t� have batt material placement R -30 required. 5. In b -units > rock wool required at roof level where lacking. Make sure that installation of rock w000l is tight. 6. Disregard. 7. Fire -caulk thru hole penetrations between units above ceiling, i.e. wiring and plumbing. 8. 2nd layer: Firewall above ceiling nailing - okay - need to seal joints. 9. B -5: Return air (floor system) open end. 10. B -6: Return air (floor sytem) unknown exactly new furnace will be affixed to system. 11. Fill cavities of side wall in A -Unit garages adjacent to bath and laundry. 12. Insulate return air duct within attic of A -unit garage. 13. Insulate perimeter of down -draft furnace within garage. • 14. Insulate door headers of garage dwelling. 15. Thru hole penetrations missed at plates etc. MSTB745 Insulation Insp / / / / 02/06/98 1. Fill void over shower at B -6. PASS RB 02/06/98 J *H 2. Terminate range vent at B -6 at exterior. 3. Gyp plenum need open gaps sealed. MSTB750 Shear Wall Insp 01/28/98 / / 02/04/98 PASS RB 02/04/98 J *H MSTB751 Exterior Sheathing Insp 01/28/98 / / 01/28/98 01/28/98 J *H Page No. 10 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17,/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By MSTB755 Firewall Insp / / / / 12/31/97 Partial inspection prior to placement of PART RB 02/04/98 J *H firewall. 1. Above ceiling at firewalls - insulate between units. 2. Fully insulate and flame spread fireplace units, block as needed. 3. Make sure plumbing top -out gets approved prior to cover where needed. MSTB755 Firewall Insp 01/28/98 / / 02/04/97 Nailing okay 2nd layer, need to seal PART RB 02/04/98 J *H joints. MSTB760 Gyp Board Insp 01/28/98 / / / / 01/28/98 J *H MSTB791 «REINSPECTION» / / / / 05/28/98 Reinspection fee assessed - mechanical PAID DLH 05/28/98 DST correction not complete. MSTB796 Electrical Final 04/30/98 / / 04/30/98 Panel ace-Mules to be in permanent ink. PASS BRP 04/30/98 J *H All units approved. • MSTB797 Plumb Final 05/08/98 / / 05/08/98 1. Unable to verify sewer connection. FAIL WA 05/08/98 J *H EXTERIOR PLUMBING 2. Caulk around all hose bibbs • 3. Install 90- degree el on hot water • heater, all units, relief valve discharge line on outside of building all units. 4. Install flush type cleanouts or sanitary sewer cleanouts all units. 5. Install downspout from gutters to raindrain stub -up all units. INTERIOR PLUMBING Olt MSTB797 Plumb Final / / / / 05/18/98 Items or inspection report dated 050898 PASS WA 05/18/98 J *H have been corrected. MSTB797 Plumb Final 05/22/98 / / / / 05/22/98 J *H MSTB798 Mechanical Final / / / / 05/21/98 Secure vent from displacement. FAIL RC 05/26/98 J *H $15.00 fee for reinspection assessed. MSTB798 Mechanical Final 05/22/98 / / 05/20/98 1. Support gas line in garage. FAIL RC 05/22/98 J *H 2. Support vent from displacement. 3. Duct in garage must be insulated. MSTB798 Mechanical Final / / / / 06/18/98 As per RC report dtd. 5- 29 -98. PASS RB 06/19/98 RB Already approved by RC an 5- 29 -98. MSTB798 Mechanical Final / / / / 05/29/98 PASS RC 06/24/98 J *H Page No 11 CASE HISTORY FOR CASE NO.: MST96 -0116 BOWEN REAL ESTATE GROUP 13385 SW SUMMERWOOD DR 07/17/98 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - --- - -- - --- - --- - -- MSTB799 Building Final 05/22/98 / / 05/29/98 1. Cover rain drain. FAIL RC 05/31/98 J *H 2. Plug unused rain drain. 3. Seal holes in exterior. MSTB799 Building Final / / / / 06/18/98 As per RC report dtd. 5- 29 -98. PASS RB 06/19/98 RB MSTB800 Final inspection 05/22/98 / / 06/18/98 As per RC report dtd. 5 -29 -98 PASS RB 06/19/98 RB Rain Drain inspection not noted. By appearence, the rain drain system seems to be adequately installed and working properly. MSTD710 Post /Beam Structural / / / / 10/06/97 REPORT DATED 092397, CORRECTIONS NOT FAIL RB 10/07/97 J *H COMPLETED. 1. Anchor bolt needed at plates within 12 -inch of ends etc. 2. Notched beam support. 3. Lack of mechanical ventilation (or) foundation vents. 4. Support of mechanical ducts lacking at various locations, maintain dround clearances. 5. Seal holes in tears, of flex duct, support some at 4 -foot intervals. 6. Too much water retention. Where is l'ow -point drain and backwater valve? 7. If insulation for both • mechanical /flex duct continue to remain wet - replace. CALL FOR REINSPECTION. • • • 5 •- CITY OF TIGARD BUILDING INSPECTION DIVISION 24-Hour Inspection Line: 639-4175 Business Phone: 639-4171 Date Requested: 5 - c)-5- q 8 , k M. P.M. MST: ' — 0 I- Location: i 333 <3140 34,unti it a t t r 0 d . IA. BUP: Tenant: Suite: Bldg: 3 MEC: Contractor: CAP ITA L- HT Phone: PLM: Owner: egrief/1- j/2.Ar 9,,,,„,),,i Phone: 52 Li. - ( 23 ELC: ELR: SIT: BUILDING (13L,11%.(c/i't) PLUMBING MECHANICAL ELECTRICAL SITE Site Post/Beam Post/Beam Post/Beam Cover/Service Sewer/Storm Footing Roof UndFUSlab Rough-In Ceiling Water Line Slab Framing Top Out Gas Line Rough-In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear/Sheath Fire Spklr/Alm Crawl/Found Dr Heat Pump Low Volt Approved Approved Approved Approved Approved Appr/Sdwlk . 1. ',roved Not Approved Not Approved Not Approved Not Approved ----- FINAL FINAL FINAL FINAL 1r-1A1id 4 # I 4 / i 4 1 , L-.07 r / nuLY • /ki A / / / , (?..." LA .."1 ...t A../t (9 "...,,,„. ■arip ii to I r , ,e--le•-• ..- / ■-- ' - C.,-C, ( 1 ) /' El Call for reinspection El Reinspection fee of $ required before next inspection CI Unable to inspect Inspector: 'iZtt -- ' Date: -5 — e) 9 .... - 1 U Page of •