Inspection • CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: Ca — q q 0 A.M. P.M. MST: C i 7— 0 Q3Q
Location: 1.3 I I ) 1..unrYurvi .0/)/77 d BUP:
Tenant: Suite: Bldg: 4 MEC:
Contractor: r Phone: i ��yti�Yl 45_ PLM:
Owner: Phone: r' Li-- 6p K a..3 ELC:
to K') 6 n /VI. g I N & / I.JS >. ELR:
SIT:
BUILDING A 'P6�1Scam G on'tP - r
PLUMBING t •b • . ELECTRICAL SITE
Site Post/Beam Pos r : y1 Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath F , 6 r. A Crawl/Found Dr Heat Pun s Low Volt
A 1 . o - : Approved • pproved Approved Approved
Appr /Sdwlk Not A roved Not Approved ` . • oved Not Approved Not Approved
FINAL FETAL' FINAL FINAL
4 e \;...4., / i
k ,
,,,
,,,,,,N)
D Call for reinspectio /1 O Reinspection fee of $ required before next • tion 0 Unable to inspect
Inspector: A Date: (Q,/ „75 Page of