Permit t ' .
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
.. X _. p 3 J y
I
Date Requested: -5' / Z P.M. MST: pp
Location: _2-05 �W • BUP: q 7 - 0'7 23
Tenant: t G of u$ � sr'��s1��-_.; t/ Suite: Bldg: MEC:
Contractor: — 1 24.Il.e., 0A.. Phone: 7& / ` / 7 / 7 PLM:
Owner: �/��E�/1/Lc., C' L cu,,, Phone: — 8 /60 ELC:
/ ELR:
sla .0 - O
�r 2- V' &RO U ( S1T:
BUILDING : LDG on't) PLUMBING MECHANICAL ELECTRICAL SITE
Site `. I :eam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp ti A. = Storm Furnace Temp Service MISC.
Masonry ACIEW Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt •
p rotzd� Approved Approved Approved Approved
Appr /Sdwlk of Ap roved Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL
r
Cl Call for reins = OP Cl Reinspection fee of $ required before next inspection Cl Unable to inspect
Q
Inspector: ` /� Date: /' 2 C Page of