Loading...
Report - - 0 - 0 9 - ‘ 7 1 • GEOTECHNICAL RESOURCES, INC. SITE VISIT REPORT Consulting Engineers and Geologists • 9725 SW Beaverton - Hillsdale Hwy, Ste 140 Pg 1 of Beaverton, Oregon 97005 (503) 641 -3478 (FAX) 644 -8034 Project: Lot 2 / ran Subdivisio Date: February 22, 1999 Feature: Su surface • e Weather: Rain and Cool Contractor: Cliff Waibel Time: 3 P.M. Owner: Cliff Waibel ✓ Job No.: 2041 Submitted by Robin Warren • GRI completed a site visit to observe groundwater in the utility trench in front of lot 2 and between lots 1 and 2. At the time of the site visit, Cliff was pumping approximately In gpm from the gas/electric utility trench at the southwest corner of the lot. Based on our discussions with Cliff f we understand water was previously observed flowing from the slope below the emergency turn-around between lots 1 and 2. The seepage was not observed after Cliff started pumping water from the utility trench. In our opinion, there is some risk of slope instability due to the groundwater seepage observed below the turn-around. To reduce the risk, we recommend a minimum 15 -ft -long section of perforated drain pipe be placed in the utility trench to collect the seepage. The collected water should be hard -piped to either the creek below the lot or the storm water sewer. Our observations and recommendations were discussed with Cliff during the site visit. 4604,, PC. Reviewed by. ✓ Date: Comments Copies to: .nFEB22.-2.041