Centrex Construction ~ P12212 4
o Contract#
CITY OF TIGARD,OREGON
PUBLIC IMPROVEMENT CONTRACT—PWR COVERED PROJECT
SKATE PARK RESTROOMS
THIS CONTRACT, made and entered into this 8th day of September, 2009, by and between the City of
Tigard, a municipal corporation of the State of Oregon, hereinafter called "City" and Centrex Construction
Incorporated, 8250 SW Hunziker Road,Tigard, OR 97223,hereinafter called "Contractor," duly authorized to
perform such services in Oregon.
RECITALS
WHEREAS, the City requires services which Contractor is capable of providing,under terms and conditions
hereinafter described;and
WHEREAS, time is of the essence in this contract and all work under this contract shall be completed within
the time period stated in the Bid Proposal;
THEREFORE,in consideration of the promises and covenants contained herein, the parties hereby agree
as follows:
TERMS OF AGREEMENT
1. Services
Contractor's services under this Agreement shall consist of the following:
Construction of Public Restrooms in accordance with the Scope of Work (Exhibit A), the
Construction Drawings (Exhibit B), and Contractor's Proposal Letter and email dated June 26, 2009
and May 21,2009 respectively (Exhibit C),attached hereto.
2. Prevailing Wage
While the City and Contractor enter into this Agreement with the understanding that the work to be
completed does not initially exceed $50,000 and therefore does not initially require the provisions of
ORS Chapters 279A and 279C or other Oregon and Federal provisions pertaining to minimum
salaries and wages, the said provisions are incorporated herein by reference as if fully set forth in the
event the contract is amended to exceed$50,000 at any point.
The Contractor agrees that,in the event the contract ever exceeds $50,000, the workmen in each trade
or occupation required for the work to be done pursuant to the contract, employed in the
performance of the Contract, either by the Contractor or Subcontractor or other person doing or
contracting to do any part of the work contemplated by the Contractor shall be paid not less than the
prevailing, minimum hourly rate of wage specified by the Commissioner of the Bureau of Labor and
attached hereto as Exhibit D. This includes any required back pay for work done while the contract
was under $50,000. Once the project exceeds the $50,000 threshold, all employees shall be entitled to
back pay equal to or greater than the waged required under BOLI laws.
If the contact reaches $50,000 or greater through change orders, the Contractor shall pay a fee equal to
one-tenth of one percent (.001) of the price of the contract to the Bureau of Labor and Industries.
The fee shall be paid on or before the first progress payment or 60 days from the date work first began
on the contract,whichever comes first. The fee is payable to the Bureau of Labor and Industries and
shall be mailed or otherwise delivered to the Bureau at the following address:
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 1
Template Revision—05/09/2008
Contract#
Bureau of Labor and Industries
Wage and Hours Division
Prevailing Wage Unit
800 NE Oregon Street, # 32
Portland, Oregon 97232
Also in the event the contract reaches $50,000 through change orders or amendments, the Contractor
shall provide proof to the City that the Contractor has filed a public works bond with a corporate
surety in the amount of$30,000 with the Construction Contractors Board as required under Oregon
PWR law.
3. Contract Documents
The Contractor is hereby bound to comply with all requirements of this agreement, the Contractor's
proposal, the detailed specifications and requirements, the drawings, and the special conditions and
modifications in conditions as set forth in the documents prepared by the City Engineer and the
performance pertaining to this contract, in the City of Tigard, Oregon, and by this reference made a
part hereof to the same legal force and effect as if set forth herein in full.
4. City's Representative
For purposes hereof, the City's authorized representative will be the Nick Nissen, 13125 SW Hall
Blvd.,Tigard, Oregon 97223;Telephone: 639-4171.
5. Contractor's Representative
For purpose hereof, the Contractor's authorized representative will be Russ Langbehn, Centrex
Construction, 8250 SW Hunziker Road,Tigard, OR 97223.
6. Contractor Identification
Contractor shall furnish to the City the Contractor's employer identification number, as designated by
the Internal Revenue Service, or Contractor's social security number,as City deems applicable.
7. Compensation
A. Progress Payments: City agrees to pay Contractor Forty-Nine thousand, five hundred and
Sixty-Two Dollars ($49,562.00) for performance of those services provided hereunder, which
payment shall be based upon the following applicable terms:
Payment shall be based upon the bid by the Contractor, as listed in attached proposal letter
dated June 26, 2009 (Exhibit C). Contractor shall prepare and submit each month to City
Representative Nick Nissen, City of Tigard, 13125 SW Hall Blvd., Tigard, Oregon 97223, a
statement of services rendered, (indicating the description of each service used in the proposal
and the dollar amount of each service completed through the stated date), together with a
request for payment duly verified by the Contractor's Representative.
Payment by the City shall release the City from any further obligation for payment to
Contractor for services performed or expenses incurred as of the date of the statement of
services. Payment of installments shall not be considered acceptance or approval of any work
or waiver of any defects therein. City certifies that sufficient funds are available and authorized
for expenditure to finance costs of this contract.
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 2
Template Revision—05/09/2008
Contract#
In the event the contract ever reaches $50,000, the Contractor shall include proof of payment
to any and all subcontractors and suppliers with each statement submitted to the City. The
initial statement at that junction must also contain proof of paid back wages. The City shall
retain the right to withhold payments if required proof of payment to subcontractor and
suppliers is not included with a statement in this event. Also, as required under State of
Oregon Prevailing Wage Rate (PWR) Law, the City shall withhold 25% of any progress
payment amounts owed to Contractor if Contractor has failed to file certified payrolls sheets
with the City in the event the contract reaches $50,000.
B. Timing of Payments: Progress payments, less a five percent retainage as authorized by ORS
279C.555, shall be made to the Contractor within twenty (20) days of the City's receipt of the
statement of services. The Contractor agrees to complete the work within 100 days of the
City's Notice to Proceed. The Contractor and City agree that the City will suffer damages each
day the work remains uncompleted after the 100-day period, and the amount of those damages
is difficult to calculate. Contractor and City agree that a reasonable amount of damages for
late completion is $ 100 per day and Contractor agrees to pay damages in that amount if the
work is not completed within the 100-day period.
C. Final Payment: The Contractor shall notify the City in writing when the Contractor considers
the project complete, and the City shall,within 15 days after receiving the written notice, either
accept the work or notify the Contractor of work yet to be performed on the contract.
Upon acceptance by the City, the entire balance due to the Contractor, including the retained
percentage, shall be paid to the Contractor, by the City within 30 days after the date of said
final acceptance.
The City shall pay to the Contractor interest at the rate of one and one-half percent per month
on the final payment due the Contractor, to commence 30 days after the work under the
Contract has been completed and accepted and to run until the date when final payment is
tendered to the Contractor. If the City does not, within 15 days after receiving written notice
of completion, notify the Contractor of work yet to be performed to fulfill contractual
obligations, the interest provided by this subsection shall commence to run 30 days after the
end of the 15-day period.
As a further conditions of final acceptance, the City may require the Contractor to submit
evidence, satisfactory to the City's Representative, that all payrolls, material bills, and other
indebtedness connected with the project have been paid, except that in case of any disputed
indebtedness or liens, the Contractor may submit in lieu of evidence of payment, a surety bond
satisfactory to the City guaranteeing payment of all such disputed amounts when adjudicated in
cases where such payment has not already been guaranteed by surety bond.
8. Status Of Contractor As Independent Contractor
Contractor certifies that:
A. Contractor acknowledges that for all purposes related to this Agreement, Contractor is and
shall be deemed to be an independent Contractor as defined by ORS 670.600 and not an
employee of City, shall not be entitled to benefits of any kind to which an employee of City is
entitled and shall be solely responsible for all payments and taxes required by law.
Furthermore, in the event that Contractor is found by a court of law or any administrative
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 3
Template Revision—05/09/2008
Contract#
agency to be an employee of City for any purpose, City shall be entitled to offset
compensation due, or to demand repayment of any amounts paid to Contractor under the
terms of this Agreement, to the full extent of any benefits or other remuneration Contractor
receives (from City or third party) as a result of said finding and to the full extent of any
payments that City is required to make (to Contractor or to a third party) as a result of said
finding.
B. The undersigned Contractor hereby represents that no employee of the City, or any
partnership or corporation in which a City employee has an interest, has or will receive any
remuneration of any description from Contractor, either directly or indirectly, in connection
with the letting or performance of this Agreement, except as specifically declared in writing.
C. If this payment is to be charged against Federal funds, Contractor certifies that he or she is not
currently employed by the Federal Government and the amount charged does not exceed his
or her normal charge for the type of service provided.
D. Contractor and its employees,if any, are not active members of the Oregon Public Employees
Retirement System and are not employed for a total of 600 hours or more in the calendar year
by any public employer participating in the Retirement System.
E. Contractor certifies that it currently has a City business license or will obtain one prior to
delivering services under this Agreement.
F. Contractor is not an officer, employee, or agent of the City as those terms are used in ORS
30.265.
9. Subcontracts -Assignment& Dele ag tion
Contractor shall submit a list of Subcontractors for approval by the City, and Contractor shall be fully
responsible for the acts or omissions of any Subcontractors and of all persons employed by them, and
neither the approval by City of any Subcontractor nor anything contained herein shall be deemed to
create any contractual relation between the Subcontractor and City.
This agreement, and all of the covenants and conditions hereof, shall inure to the benefit of and be
binding upon the City and the Contractor respectively and their legal representatives. Contractor shall
not assign any rights nor delegate any duties incurred by this contract, or any part hereof without the
written consent of City,and any assignment or delegation in violation hereof shall be void.
Any and all subcontracts issued by the contractor shall contain a provision that workers shall be paid
not less that the PWR Law specified minimum wage.
10. Contractor- Payment of Benefits - Hours of Work
A. The Contractor shall:
1) Make payment promptly, as due, to all persons supplying to such Contractor labor or
material for the prosecution of the work provided for in this contract;
2) Pay all contributions or amounts due the under the Industrial Accident Fund form the
Contractor or subcontractor incurred in the performance of this Agreement;
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 4
Template Revision—05/09/2008
Contract#
3) Pay to the Department of Revenue all sums withheld from employees pursuant to
ORS 316.167.
4) Not permit any lien or claim to be filed or prosecuted against the City of Tigard, on
account of any labor or material fiirnished;
B. The Contractor or the Contractor's Surety and every Subcontractor or the Subcontractor's
Surety shall file certified statements with the City in writing in form prescribed by the
Commissioner of the Bureau of Labor and Industries, certifying the hourly rate of wage paid
each worker which the Contractor or the Subcontractor has employed upon such public work,
and further certifying that no worker employed upon such public work has been paid less than
the applicable prevailing rate of wage, which certificate and statement shall be verified by the
oath of the Contractor or the Contractor's Surety or Subcontractor or the Subcontractor's
Surety that the Contractor or Subcontractor has read such statement and certificate and knows
the contents thereof and that the same is true to the Contractor's or Subcontractor's
knowledge.
1) The certified statements shall set out accurately and completely the payroll records for
the prior week, including the same and address of each worker, the worker's correct
classification, rate of pay, daily and weekly number of hours worked, deductions made
and actual wages paid.
2) Each certified statement required herein shall be delivered or mailed by the Contractor
or Subcontractor to the City. A true copy of the certified statements shall also be filed
at the same time with the Commissioner of the Bureau of Labor and Industries.
Certified statements shall be submitted as follows:
a) For any project 90 days or less from the date of the award of the contract to
the date of completion of work under the contract, the statements shall be
submitted once before the first payment is made, and once before final
payment is made of any sum due on account of the contract.
b) For any project exceeding 90 days from the date of the award of the contract
to the date of completion of work under contract, the statements shall be
submitted once before the first payment is made, at 90 day intervals thereafter,
and once before final payment is made of any sum due on account of the
contract.
C) Each Contractor or Subcontractor shall preserve certified statements for a
period of three years from the date of completion of the contract.
C. The Contractor agrees that if the Contractor fails, neglects or refuses to make prompt payment
of any claim for labor or services furnished to the Contractor or a Subcontractor by any
person in connection with this contract as such claim becomes due, the proper office of the
City of Tigard may pay such claim to the person furnishing the labor or services and charge the
amount of the payment against funds due or to become due to the Contractor by reason of
such contract. Payment of a claim in this manner shall not relieve the Contractor or the
Contractor's Surety from obligation with respect to any unpaid claims.
D. Contractor agrees that no person shall be employed for more than ten (10) hours in any one
day, or 40 hours in any one week, except in cases of necessity or emergency or when the City
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 5
Template Revision—05/09/2008
Contract#
deems it in the best interest of the public or policy absolutely requires it, in which event, the
person so employed for excessive hours shall receive at least time and a half pay for the
following:
1) For all overtime in excess of eight hours in any one day or 40 hours in any one week
when the work week is five consecutive days,Monday through Friday; or
2) For all overtime in excess of 10 hours in any one day or 40 hours in any one week
when the work week is four consecutive days,Monday through Friday; and
3) For all work performed on Saturday and on the legal holidays specified in ORS
279C.540.
E. No City employee shall be required to work overtime or on a Saturday, Sunday or holiday in
the fulfillment of this contract except where the Contractor agrees to reimburse the City in the
amount of money paid the employee for such work as determined by state law, the City's
personnel rules or union agreement. The Contractor shall require every Subcontractor to
comply with this requirement.
F. If Contractor or any first-tier subcontractor fails to pay a person furbishing labor or material
within 30 days after receipt of payment form the City or from the Contractor to a
subcontractor, the Contractor or first-tier subcontractor shall owe the person the amount due
plus interest commending at the end of the 10 day period that the payment is due under ORS
279C.580, unless payment is subject to a good-faith dispute. The interest rate shall be as
specified in ORS 279C.515(2). If the Contractor or any subcontractor fails, neglects, or refuses
to pay a person furnishing labor or material, the person may file a complaint with the
Construction Contractors Board, unless the payment is subject to a good faith dispute as
defined in ORS 279C.580.
G. Contractor shall include a clause in each contact with a subcontractor a requirement that the
contractor pay the subcontractor for satisfactory performance within 10 days of receipt of
payment from the City for the work. Contractor shall include in contracts with subcontractors
an interest provision for such payments in compliance with ORS 279C.580. Contractor shall
include a clause in each contract with a subcontractor requiring the subcontractor to meet the
same payment and interest standards as required by ORS 279C.580 (4).
11. Drug Testing Program
ORS 279C.505 requires that all public improvement contracts contain a provision requiring
contractors to demonstrate that an employee drug-testing program is in place. The Contractor
demonstrates that a drug-testing program is in place by signing of the contact. The drug testing
program will apply to all employees and will be maintained for the duration of the Contract awarded.
Failure to maintain a program shall constitute a material breach of contract.
12. Contractor's Employee Medical Payments
Contractor agrees to pay promptly as due, to any person, co-partnership, association or corporation
furnishing medical, surgical, and hospital care or other needed care and attention incident to sickness
or injury to the Contractor's employees,all sums which the Contractor agreed to pay for such services
and all money and sums which the Contractor collected or deducted from employee wages pursuant
to any law, contract or agreement for providing or paying for such service.
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 6
Template Revision—05/09/2008
Contract#
13. Early Termination
A. This agreement may be terminated without cause prior to the expiration of the agreed upon
term by mutual written consent of the parties and for the following reasons:
1) If work under the Contract is suspended by an order of a public agency for any reason
considered to be in the public interest other than by a labor dispute or by reason of
any third party judicial proceeding relating to the work other than a suit or action filed
in regard to a labor dispute; or
2) If the circumstances or conditions are such that it is impracticable within a reasonable
time to proceed with a substantial portion of the Contract.
B. Payment of Contractor shall be as provided by ORS 279C.660 and shall be prorated to and
include the day of termination and shall be in full satisfaction of all claims by Contractor
against City under this Agreement.
C. Termination under any provision of this paragraph shall not affect any right, obligation, or
liability of Contractor or City which accrued prior to such termination.
14. Cancellation with Cause
A. City may terminate this Agreement effective upon delivery of written notice to Contractor, or
at such later date as may be established by City,under any of the following conditions:
1) If City funding from federal, state, local, or other sources is not obtained and
continued at levels sufficient to allow for the purchase of the indicated quantity of
services. This Agreement may be modified to accommodate a reduction in funds,
2) If Federal or State regulations or guidelines are modified, changed, or interpreted in
such a way that the services are no longer allowable or appropriate for purchase under
this Agreement,
3) If any license or certificate required by law or regulation to be held by Contractor, its
subcontractors, agents, and employees to provide the services required by this
Agreement is for any reason denied,revoked, or not renewed, or
4) If Contractor becomes insolvent, if voluntary or involuntary petition in bankruptcy is
filed by or against Contractor, if a receiver or trustee is appointed for Contractor, or if
there is an assignment for the benefit of creditors of Contractor.
Any such termination of this agreement under paragraph (a) shall be without prejudice to any
obligations or liabilities of either party already accrued prior to such termination.
B. City, by written notice of default (including breach of contract) to Contractor, may terminate
the whole or any part of this Agreement:
1) If Contractor fails to provide services called for by this agreement within the time
specified herein or any extension thereof, or
2) If Contractor fails to perform any of the other provisions of this Agreement, or so fails
to pursue the work as to endanger performance of this agreement in accordance with
its terms, and after receipt of written notice from City, fails to correct such failures
within ten (10) days or such other period as City may authorize.
Skate Park Restrooms
Public Improvement agreement—PWR Covered Project Page 7
Template Revision—05/09/2008
Contract#
The rights and remedies of City provided in the above clause related to defaults (including
breach of contract) by Contractor shall not be exclusive and are in addition to any other rights
and remedies provided by law or under this Agreement.
If City terminates this Agreement under paragraph (b), Contractor shall be entitled to receive
as full payment for all services satisfactorily rendered and expenses incurred, an amount which
bears the same ratio to the total fees specified in this Agreement as the services satisfactorily
rendered by Contractor bear to the total services otherwise required to be performed for such
total fee; provided, that there shall be deducted from such amount the amount of damages, if
any, sustained by City due to breach of contract by Contractor. Damages for breach of
contract shall be those allowed by Oregon law, reasonable and necessary attorney fees, and
other costs of litigation at trial and upon appeal.
15. Access to Records
City shall have access to such book, documents, papers and records of Contractor as are directly
pertinent to this Agreement for the purpose of making audit,examination, excerpts,and transcripts.
16. Work is Property of City
All work performed by Contractor under this Agreement shall be the property of the City.
17. Adherence to Law
A. Contractor shall adhere to all applicable laws governing its relationship with its employees,
including but not limited to laws, rules, regulations, and policies concerning workers'
compensation, and minimum and prevailing wage requirements.
B. To the extent applicable, the Contractor represents that it will comply with Executive Order
11246 as amended, Executive Order 11141, Section 503 of the Vocational Rehabilitation Act
of 1973 as amended and the Age Discrimination Act of 1975, and all rules and regulations
issued pursuant to the Acts.
C. As provided by ORS 279C.525, all applicable provisions of federal, state or local statutes,
ordinances and regulations dealing with the prevention of environmental pollution and the
preservation of natural resources that affect the work under this contract are by reference
incorporated herein to the same force and affect as if set forth herein in full. If the Contractor
must undertake additional work due to the enactment of new or the amendment of existing
statutes, ordinances or regulations occurring after the submission of the successful bid, the
City shall issue a Change Order setting forth the additional work that must be undertaken.
The Change Order shall not invalidate the Contract and there shall be, in addition to a
reasonable extension,,if necessary, of the contract time, a reasonable adjustment in the contract
price,if necessary, to compensate the Contractor for all costs and expenses incurred, including
overhead and profits, as a result of the delay or additional work.
Pursuant to ORS 279C.525(1), the following list identifies Governmental Agencies of which
the City has knowledge that have enacted Environmental Laws which may affect the
performance of the work:
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 8
Template Revision—05/09/2008
Contract#
FEDERAL AGENCIES
➢ Agriculture
• Department of Forest Service
• Soil Conservation Service
➢ Defense
• Department of Army Corps of Engineers
➢ Energy
• Department of Federal Energy Regulatory Commission
➢ Environmental Protection Agency
➢ Department of Health and Human Services
➢ Housing and Urban Development
• Department of Solar Energy Conservation Bank
➢ Interior, Department of
• Bureau of Sports Fisheries and Wildlife
• Bureau of Outdoor Recreation
• Bureau of Land Management
• Bureau of Mines
• Bureau of Indian Affairs
• Bureau of Reclamation
• Geological Survey
• Minerals Management Service
➢ Labor, Department of
• Mine Safety and Health Administration
• Occupational Safety and Health Administration
➢ Transportation, Department of
• Coast Guard
• Federal Highway Administration
➢ Water Resources Council
STATE AGENCIES
➢ Administrative Services,Department of
➢ Agriculture, Department of
➢ Columbia River Gorge Commission
➢ Consumer&Business Services,Department of Oregon Occupational Safety& Health
➢ Division
➢ Energy, Department of
➢ Environmental Quality,Department of
➢ Fish and Wildlife, Department of
➢ Forestry, Department of
➢ Geology and Mineral Industries, Department of
➢ Human Resources, Department of
➢ Land Conservation and Development Commission
➢ Parks and Recreation, Department of
➢ Soil and Water Conservation Commission
➢ State Engineer
➢ State Land Board
➢ Water Resources Board
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 9
Template Revision—05/09/2008
Contract#
LOCAL AGENCIES
➢ City Council
➢ County Court
➢ County Commissioners,Board of
➢ Port Districts
➢ Metropolitan Services Districts
➢ County Service Districts
➢ Sanitary Districts
➢ Water Districts
➢ Fire Protection Districts
18. Changes
City may at any time, and without notice, issue a written Change Order requiring additional work
within the general scope of this Contract, or any amendment thereto, or directing the omission of or
variation in work. If such Change Order results in a material change in the amount or character of the
work, an equitable adjustment in the Contract price and other provisions of this Contract as may be
affected may be made. Any claim by Contractor for and adjustment under this section shall be
asserted in writing within thirty (30) days from the date of receipt by Contractor of the notification of
change or the claim will not be allowed. Whether made pursuant to this section or by mutual
agreement, no change shall be binding upon City until a Change Order is executed by the Authorized
Representative of City,which expressly states that it constitutes a Change Order to this Contract. The
issuance of information, advice, approvals, or instructions by City's Representative or other City
personnel shall not constitute an authorized change pursuant to this section. Nothing contained in
this section shall excuse the Contractor from proceeding with the prosecution of the work in
accordance with the Contract, as changed.
19. Force Majeure
Neither City nor Contractor shall be considered in default because of any delays in completion of
responsibilities hereunder due to causes beyond the control and without fault or negligence on the part
of the party so disenabled, including, but not restricted to, an act of God or of a public enemy,
volcano, earthquake, fire, flood, epidemic, quarantine, restriction, area-wide strike, freight embargo,
unusually severe weather or delay of Subcontractor or suppliers due to such cause; provided that the
party so disenabled shall within ten (10) days from the beginning of such delay, notify the other party
in writing of the causes of delay and its probable extent. Such notification shall not be the basis for a
claim for additional compensation. Each party shall, however, make all reasonable efforts to remove
or eliminate such a cause of delay or default and shall, upon cessation of the cause, diligently pursue
performance of its obligation under Contract.
20. Nonwaiver
The failure of the City to insist upon or enforce strict performance by Contractor of any of the terms
of this contract or to exercise any rights hereunder shall not be construed as a waiver or
relinquishment to any extent of its right to assert or rely upon such terms or rights on any future
occasion.
21. Warranties
All work shall be guaranteed by the Contractor for a period of one year after the date of final
acceptance of the work by the Owner. Contractor warrants that all practices and procedures,
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 10
Template Revision—05/09/2008
Contract#
workmanship, and materials shall be the best available unless otherwise specified in the profession.
Neither acceptance of the work nor payment therefore shall relieve Contractor from liability under
warranties contained in or implied by this contract.
22. Attorney's Fees
In case suit or action is instituted to enforce the provisions of this contract, the parties agree that the
losing party shall pay such sum as the Court may adjudge reasonable attorney's fees and court costs
including attorney's fees and court costs on appeal.
23. Governing Law
The provisions of this Agreement shall be construed in accordance with the provisions of the laws of
the State of Oregon. Any action or suits involving any questions arising under this Agreement must be
brought in the appropriate court of the State of Oregon.
24. Conflict Between Terms
It is further expressly agreed by and between the parties hereto that should there be any conflict
between the terms of this instrument and the proposal of the Contractor, this instrument shall control
and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting
herewith.
25. Indemnification
Contractor warrants that all its work will be performed in accordance with generally accepted
professional practices and standards as well as the requirements of applicable federal, state and local
laws, it being understood that acceptance of a contractor's work by City shall not operate as a waiver
or release.
Contractor agrees to indemnify and defend the City, its officers, agents and employees and hold them
harmless from any and all liability, causes of action, claims, losses, damages, judgments or other costs
or expenses including attorney's fees and witness costs and (at both trial and appeal level, whether or
not a trial or appeal ever takes place) that may be asserted by any person or entity which in any way
arise from, during or in connection with the performance of the work described in this contract,
except liability arising out of the negligence of the City and its employees. If any aspect of this
indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or invalidity
shall not affect the validity of the remainder of this indemnification.
26. Insurance
Contractor and its subcontractors shall maintain insurance acceptable to City in full force and effect
throughout the term of this contract. Such insurance shall cover all risks arising directly or indirectly
out of Contractor's activities or work hereunder, including the operations of its subcontractors of any
tier. Such insurance shall include provisions that such insurance is primary insurance with respect to
the interests of City and that any other insurance maintained by City is excess and not contributory
insurance with the insurance required hereunder.
The policy or policies of insurance maintained by the Contractor and its subcontractor shall provide at
least the following limits and coverages:
A. Commercial General Liability Insurance: Contractor shall obtain, at contractor's expense, and
keep in effect during the term of this contract, Comprehensive General Liability Insurance
covering Bodily Injury and Property Damage on an "occurrence" form (1996 ISO or
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 11
Template Revision—05/09/2008
Contract#
equivalent). This coverage shall include Contractual Liability insurance for the indemnity
provided under this contract. The following insurance will be carried:
Coverage Limit
General Aggregate $2,000,000
Products-Completed Operations Aggregate $1,000,000
Personal&Advertising Injury $1,000,000
Each Occurrence $1,000,000
Fire Damage (Any one fire) $50,000
Medical Expense (Any one person) $5,000
B. Commercial Automobile Insurance: Contractor shall also obtain, at contractor's expense, and
keep in effect during the term of the contract, "Symbol 1" Commercial Automobile Liability
coverage including coverage for all owned, hired, and non-owned vehicles. The Combined
Single Limit per occurrence shall not be less than$1,000,000.
C. Workers' Compensation Insurance: The Contractor, its subcontractors, if any, and all
employers providing work, labor or materials under this Contract are subject employers under
the Oregon Workers' Compensation Law and shall comply with ORS 656.017,which requires
them to provide workers' compensation coverage that satisfies Oregon law for all their subject
workers. Out-of-state employers must provide Oregon workers' compensation coverage for
their workers who work at a single location within Oregon for more than 30 days in a calendar
year. Contractors who perform work without the assistance or labor of any employee need
not to obtain such coverage." This shall include Employer's Liability Insurance with coverage
limits of not less than $100,000 each accident.
D. Additional Insured Provision: The City of Tigard, Oregon, its officers, directors, and
employees shall be added as additional insureds with respect to this contract. All Liability
Insurance policies will be endorsed to show this additional coverage.
E. Notice of Cancellation: There shall be no cancellation, material change, exhaustion of
aggregate limits or intent not to renew insurance coverage without 30 days written notice to
the City. Any failure to comply with this provision will not affect the insurance coverage
provided to the City. The 30 days notice of cancellation provision shall be physically endorsed
on to the policy.
F. Insurance Carrier Rating: Coverage provided by the Contractor must be underwritten by an
insurance company deemed acceptable by the City. The City reserves the right to reject all or
any insurance carrier(s) with an unacceptable financial rating.
G. Certificates of Insurance: As evidence of the insurance coverage required by the contract, the
contractor shall furnish a Certificate of Insurance to the City. No contract shall be effected
until the required certificates have been received and approved by the City. The certificate will
specify and document all provisions within this contract. A renewal certificate will be sent to
the above address 10 days prior to coverage expiration.
H. Independent Contractor Status: The service or services to be rendered under this contract are
those of an independent contractor. Contractor is not an officer, employee or agent of the
City as those terms are used in ORS 30.265.
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 12
Template Revision—05/09/2008
Contract#
I. Primary Coverage Clarification: All parties to this contract hereby agree that the contractor's
coverage will be primary in the event of a loss.
J. Cross-Liability Clause: A cross-liability clause or separation of insureds clause will be included
in all general liability, professional liability, pollution and errors and omissions policies required
by this contract.
Contractor's insurance policy shall contain provisions that such policies shall not be canceled or their
limits of liability reduced without thirty (30) days prior notice to City. A copy of each insurance policy,
certified as a true copy by an authorized representative of the issuing insurance company, or at the
discretion of City, in lieu thereof, a certificate in form satisfactory to City certifying to the issuance of
such insurance shall be forwarded to:
City of Tigard
Attn: Management Analyst Greer Gaston
13125 SW Hall Blvd
Tigard, Oregon 97223
Such policies or certificates must be delivered prior to commencement of the work. Ten days
cancellation notice shall be provided City by certified mail to the name at the address listed above in
event of cancellation or non-renewal of the insurance. The procuring of such required insurance
shall not be construed to limit contractor's liability hereunder. Notwithstanding said insurance,
Contractor shall be obligated for the total amount of any damage, injury, or loss caused by
negligence or neglect connected with this contract.
27. Method and Place of Giving Notice, Submitting Bills and Making Payments
All notices, bills and payments shall be made in writing and may be given by personal delivery or by
mail. Notices,bills and payments sent by mail should be addressed as follows:
CITY OF TIGARD (CONTRACTOR)
Attn: Management Analyst Greer Gaston Attn: Russ Langbehn
Address: 13125 SW Hall Blvd Address: 8250 SW Hunziker Road
Tigard, Oregon 97223 Tigard OR 97223
Phone: (503) 718-2595 Phone: (503) 684-0443
Fax: (503) 684-8840 Fax: (503) 620-6692
Email: greer@tigard-or.gov Email: russ@centrexconstruction.net
and when so addressed, shall be deemed given upon deposit in the United States mail,postage prepaid.
In all other instances, notices, bills and payments shall be deemed given at the time of actual delivery.
Changes may be made in the names and addresses of the person to whom notices, bills and payments
are to be given by giving written notice pursuant to this paragraph.
28. Hazardous Materials
Contractor shall supply City with a list of any and all hazardous substances used in performance of this
Agreement. That list shall identify the location of storage and use of all such hazardous substances
and identify the amounts stored and used at each location. Contractor shall provide City with material
safety data sheets for all hazardous substances brought onto City property, created on City property or
Skate Park Restrooms
Public Improvement Agreement—PWR Covered Project Page 13
Template Revision—05/09/2008
Contract#
delivered to City pursuant to this Agreement. For the purpose of this section, "hazardous substance"
means hazardous substance as defined by ORS 453.307(5). Contractor shall complete the State Fire
Marshall's hazardous substance survey as required by ORS 453.317 and shall assist City to complete
any such survey that it may be required to complete because of substances used in the performance of
this Agreement.
29. Hazardous Waste
If, as a result of performance of this Agreement, Contractor generates any hazardous wastes,
Contractor shall be responsible for disposal of any such hazardous wastes in compliance with all
applicable federal and state requirements. Contractors shall provide City with documentation,
including all required manifests, demonstrating proper transportation and disposal of any such
hazardous wastes. Contractor shall defend, indemnify, and hold harmless City for any disposal or
storage of hazardous wastes generated pursuant to this Contract and any releases or discharges of
hazardous materials.
30. Severability
In the event any provision or portion of this Agreement is held to be unenforceable or invalid by any
court of competent jurisdiction, the remainder of this Agreement shall remain in full force and effect
and shall in no way be affected or invalidated thereby.
31. Demolition—Salvage and Recycling
As required by ORS 279C.510, Contractor shall salvage or recycle any construction and demolition
debris if feasible and cost-effective.
32. Complete Agreement
This Agreement and attached exhibits constitutes the entire Agreement between the parties. No
waiver, consent, modification, or change of terms of this Agreement shall bind either party unless in
writing and signed by both parties. Such waiver, consent, modification, or change if made, shall be
effective only in specific instances and for the specific purpose given. There are no understandings,
agreements, or representations, oral or written, not specified herein regarding this Agreement.
Contractor,by the signature of its authorized representative,hereby acknowledges that he has read this
Agreement,understands it and agrees to be bound by its terms and conditions.
IN WITNESS WHEREOF, City has caused this Agreement to be executed by its duly authorized
undersigned officer and Architect has executed this Agreement on the date hereinabove first written.
Approved by Tigard's Local Contract Review Board: A/D l A PPLI(-AB LE'
CITY OF G CONTRAC
da
Signa Signa e
dip 1AA,��v�a A
Printed 6ame &Title U Printed Name Title
9�a�/o 9 �9,7
�
Date Dat
Skate Park Restrooms
Public Improvement agreement—PWR Covered Project Page 14
Template Revision—05/09/2008
City of Tigard
_ S
Exhibit A
Memorandum
To: All Contractor
From: Nicklas Nissen
Re: Skate Park Restroom
Date: 6/30/09
Scope of Work:
Supply all necessary labor and material to complete the following items:
1. Excavate as needed for new restroom.
2. Mono Pour new concrete slab for restroom.
3. Install new utilities as shown on plans except use ABS instead of cast iron for waste and vent.
4. Construct two restrooms as per plans.
5. Supply and install new board and bat siding to match existing.
6. Supply and install new roofing and flashing as per plans.
7. Supply and install new 5/8" drywall per plans on walls and ceiling.
8. Supply and install door, frame and hardware per door schedule.
9. Supply and install new white FRP per plans.
10. Supply and install new surfaces to match existing.
11. Supply and install all electrical per plans.
12. Supply and install all electrical per plans.
13. Supply and install two new countertops per plans.
14. Supply and install all plumbing per plans, except using Wrisbo and some copper for rough-in.
15. Floor finish to be hard troweled concrete.
16. Clean up and remove all construction debris from site.
Dotes: 1. Owner to supply building permit.
2. No landscaping figured.
3. All work to be done during normal business hours.
I have value engineered the plumbing materials and fixtures to keep the price down.
I would like if you could do your your bid with these fixture and materials.
Materials and fixtures
Acorn stainless steel water closet model 2115-W-2-1.6-FVN-ADA-HS
Acorn stainless steel lavatory model 1652FA-1-LF-3
Elkay stainless steel drinking fountain model EDFP214RPK
Use ABS pipe for waste lines and venting,
Use PEX pipe for water lines and common floor drains
Please call if you have any questions
Nick Nissen
Facilities Supervisor
Office 503-718-2605
Cell 503-327-5471
Q E.mi
LL
3 m
`- 26 u
�PORT"N0.
CITY OF TIGARD __
U UNFJ 6
0
Clien[
FI—t_ _TI ST Cm'of TICAM
S_K_A_TEPA1R'Aw'%._
RESTROOMS - M� , PAracs�,
�° I PROJECT
LOCATION
8720 SW BURNHAM STREET pROJ��T � , SW ST
N
TIGARD, OREGON LOCA„oN —
' SITE MAP
TrAm
SKATE PARK
RESTROOM
VICINITY MAP ADMON
®lvN.T.S
SITE INFORMATION
LEGA_De9gYpbN
2DAMecnOnlcDl/Eleat CONS
I-TAN9
TAX LOT: 2S 10 CEN 00200 SYST1515 S DESM AVE" TANTS
ZONING: MD-CENTRAL BUSINESS DISTRICT 1515 SE WATER AVE.,
SUITE 400
PORTLAND,OR 97214
Phone: (503)248-0227
FAX: (503)248-0240
ABBREVIATIONS SYMBOLS AND REFERENCES DRAWING INDEX
ACCENT PALM GR EXTFRTW WSUUnaF WFaauAnw RADNS —
Ae ARGIDR BOLT Fee.SYSTEY Wwl WSUUnON RAD RAOUL T7.1 TITLE SHEET AND INDEX OF DRAWINGS
AC ACRAL_CONCRETE E1EV ELEVA— WT ip110R RBE ROK BAY G-AnOH OETAI
ACT Aammut CULND TIKE ELECT aTEemleu Rrs REF1EeiED CEILWc PLAN
A. AD ADw1/"°"6'B w C-NAa NT RRDK DRAW CIVIL DRAWINGS
AYERIGNS MTX OISABtu11E3 ACT wat wCINEER ZT aaST EFETRNLE/AEFRIcwATaR BUILDING SECTION KEY MARKS SHEET OEINL REFERENCE W. SHEET
ADO'L ADO OVAL EEPOP EIX£K PANEL REWF gERa7%GNC $UB-CATEGORY
A., AW Tem.GRLLaE Du ETHnENE PRDPttENE AN4E REOD SU?-'ATELORY
AFT ABOVE FlM9i FiacR 0—YDRaNw LA ATE pEV R�gyp„ CATEGORY GTEroe+" C2.0 CIVIL SITE.DEMOLITION,GRADING,EROSION CONTROL AND UTILITY PLAN
AppROk EW"A
A_.AE IT. c NATWc/ UO"BOLT "�I'p"=iLW"WG SECTION
LA,, RF ROOM NAME
ARCx ARCHIn:Gi(URAL) Uw
m. - y"� LLV LONG__—TICAL Row IT CRT K FO eW O Rd 2 ROOM/SPACE IOEMIFlCATION mE It FlNSH GROUP
.//-ST Fwcrwc tawxr aaAD11m1NAL WAY SECTION KEY MARKS
A 3 $HEFT/
EWA„vdl dOWT IP LDw POINT $UB--CATEGORY POOR SYMBOL NUMBER fLm�y\ ROOM ARCHITECTURAL DRAWINGS
BTT BATIpF WSWATTON SwED SGImAE
N BOARD FXi IXTWOR I. ULHTNEIaIi CONCRETE _G. GTE';VRY
BItt BET K uaaioN SP s I CLAY YA-ley bEfAll/ O A2.1 FLOOR PLANS,EXTERIOR ELEVATIONS AND WALL SECTIONSAR
CR,,, .A
m M/E/P MEWARIGL MICAL/ WINDOW TPE
BLXc BLOCNWG FO FA¢K GIRe PWYBWG Ra£SS sFTc vFumnm ELEVATION KEY MARKS C;•'� A'i?3a ”4
A8.1 DETAILS
m 0.DOR aWx As YASOxRv sW vuuAR HEt�F REVISION MARK
Bu Bwa uARK/BUY FDC FUE aPMnuwr cwNErna« An wTwu1 nEc sLF LE�SlINc w9XY Cunxc sue-uTECDRr c�Jyi fGT6 P=�IGrio�ly'
ocTTTOM""«AL E Fw`EX WNSxER "` SAAR �_ ��'LL`ten`" G E°g' "`"y"°ter" MECHANICAL/ELECTRICAL/PLUMBING DRAWINGS
FSE Flm�n9a+EuvAnoN w DIE BOLT sNaT uEru su+Ew 9
5� BEMWE pUIE FlN fW (m) umNY pFN51tt FreERaOMU SPE SP 00D)(s) ti' �R
9iwrF T NI91 YEO YmIW OE1Fytt DY]Gv 50 c(s) SWAB TIN(s) ME 2.1 MECHANICAL FLOOR PLAN,ELECTRICAL FLOOR PLAN AND PLUMBING PLAN / ,%" Ct�d
FIR 0.008 w MEwANICAL
F."`°°� G Y UACTURTNG DRAWING CRITERIA OWNER OF0'�v
MmLFAGNRFD S� STEEL
W I.eA51N Flm N �µ _.AC— STA PT SrAnM POMr —
wmNrRa I.aNT ZDC FGRroAnov u,wA¢R sro� �y 8 cRwP uAcxExnE rmc
FAK OF CO„GKIE MAN ka[ ALL DRAMNGS ARE IDENTIFIED W TWO ALL
��IRIE FK FACE K fImSR MINIWM STfff STIiiENw OF TKLMD
DIGITS AS FOLLOWS: 8777 SW BURNHAM STREET RIONT$REEwKO
m[X ORAMNCS ARE INE PROPERTY a
�G NNO FDIC gVsTAim"i Br m„TRACTK Ttt �SKLANENS srnlmFc SSIMcNRAL A CATEGORY LETTER REFERRING TO THE OISCIPLINC OR MAIOR TICARp,OREGON 97223
(}W Ca/OFElE YASEWFY LwIT iW FACE K MASONRY YLP KETAL LWUR PA„EL T W� DMSION. CONTACT: NECK NISSEN DgOUP YALPRWRE AND AAE NOT 10 BE
MW REPRCNGD v Y uAUNw.
!AC£K 5110 0 YASOXRY O^wWG T. TITLE SHEEP M 1 IOP wR ERNISSIDx
�� F� FADE K wAu P METAL P.. C. CML-SITE OEVELOPIAENT PHONE:(503)718-2605
REVISIONS:
CO. COWu1aFT FSw F,w SmE un PETAL TAB TOP ANO BOnOw L LANDSCAPE FAX: (503)684-8840
cONCiRTE i�rlT'ODT/FIRE iPEATED NEPA rrwP K cEAMW PatARY A. ARCHITECTURAL ngnOligard-or.9oV �i aVmoa�wON DD.iA
rwc molau FIRE /TEY s, srRucruPAL 5 DAre
CCrF CPVFmwCE FABRIC WALL MWAIHc TECnav AaNCY THTC rMlw(NFST) P. PLUMBING Seo 9R£T
Ca1N[CnW Fwc AIIC -ACT TL TOTAL UM M. MECHANICAL
La15T COxSTRUCTIW
CA CAUK xO..// muWaM TN TOE RAIL E. ELECTPoGL
�nmNU0uK5 Ly wAB DAR R.- To Top K B. SUB CATEGORY NUMBER REFERRING TO TYPE OF DRAWING OR ARCH/STRUCT/CIVIL/LANDSCAPE
CWTR �wVAu13D NON-RATm TK TK 0,fWiWc
CaiRUWTEO(IM) FRN s ART 9DE(0) TOS TOP K STER GROUPING.
WORD CODRDWAlE Ce 1311-1Au BEAM NlE T TO FXCEID TOM TOP K WALL 1. GENERAL
CO„CREIE SEMA pa'E � DRAW Nr5 NOT TO SCAT£ TRMSV TRANSI9tsE 2. PLANS Ci10UP 1AACKB'dg
wiq aDFiFA GPO cNty is LUBE STFR 3. EXTERIOR ELEVATIONS/BUILDING SECTTONC 1515 SE WATER AVENUE.SUITE 100 --
cNFMICAa RESIarANT WA— DqA wmDfNFRAL sERVICEs 0/A oMXALL Tu TILT-uP 4. WALL SECTIONS PORTLANp,OREGON 97214
C9t CgWTERSWN iUu1NI5mAnw OC ON CwiFR M TTPILAL 5. INTERIOR ELEVATIONS
csP NFFC.RErt YMR PRS CTP Bp cfvww BOARD N aurvDE C- 6. REFLECTED CEILING PUNS CONTACT: JACK CLAROS
--
IT. COVNIERTOP W mposrE HAND V UNDERsmE 7. STAIR SECTIONS,PIANS,AND DETAILS
nV CO„aEIE WALL He ImsE Brea G OHRREAD DOOR =—M PHONE: (503)224-9560
8. SCHEDULES
5
NC RaLow cat/HANomAp a+m a+wWc uxDE .-LAeDXATDR¢s 9. SCHEDVLES FAX 50J
PEXNY(«AILS) HOPE Hlal DwaTY PaYETIB3FNE WP OPPOAIE LNII£4 NOim OTXmMSF ( )228-1285 SHEET TITLE:
oe oEFaqum B R x NaR xDR «EADm OA
ou 6mE Du Du -I.arATm cmw„ uDFDBa9mmDu.DRm 51RUTITLE
OON
DOUBLE WR « WARE OSF/07TACE W7-W7FACE U/S UNDERSmE SHEET
DEryn DET.Va rn „ oac ECTIMAL
K PRINKING iCUHTAW/ A HOLLOW PETAL KNOCNDOWuCIALTY
HaCODE vmi M.RnCK
DNaA6 R ND LOW PET RaDED OTS KFN TO STRDCTDRE Fa E6 reD E MECH/ELEC/PLUMBING AND
�I"YETER Rrz HaRaa+ru NEr xwx O H Cm TRE
e-H /AMA- ITB PM+nCLE I—
Dw DruEnslLw "(e) NaM(S) PDA powDw DRI.w A„oars V SYSTEM DESIM 00NSL LTANTS INDEX
a _G LOAD xwcrN Bar PJ P'Wa'wN= w/CRC NAn„c w/Eulcu RcvsTANCE 1515 SE WATER.SUITE,400 OF
DEEP Rr�c xUnuO ppuARAWM /o =.T— PORTLAND.OREGON 97214
DR DLOR HVAC .u"CAR mvDlnwmcrlcw AND �Plnq PWVA000 we wATm aosrr CONTACT: DAVID NICHOLS �
xF /WALL COYERI"C
HM HEADED MZII SIW PNL PANEL WON
maunWAa euDpwc NDE
Prt PAM MK FLARCE BEAU PHONE: (503)248-0227
05 DOWSPauT mt "I Ps POVq sTNP w'ATw"EAroR FAX (503)248-D240
IFC WTFRNAnCNAL FIRE CODE wATw PRODF/MNp PANELDIO
DM; WRAWUlG PSF POUNDS Pw SWARE FEET 'AM PESISTANi dONd®sdcpdX.e m
WC INTERNATIONAL MECHANICAL NDE PG
DMS OOMlS NC WTF 'TCHAL pWYBDIO CNF PaIN05 pw SaIAPE Ixb1 WS wATEA STDP/MLDFD SND
fA/ Ix5 DWwSIW ITT m T '/ w/F M]DED WINE—R. DRAWN BY:JEC/NMB
INVc-NT ELEVATION WAR wflDm MRE ME91
FT EAw FA2 IF INSIDE FACE PANT PAWINri CHLORIDE
P E N
CHECKED BY: BKA
SHEET
TV
-�� 102A 1 3'-0•x7'-0' 1 3/4' HM HM P I I HM p 1/A8.1 I3/AB.1 2/AB.fI H1 -- 102A 225
LL
DOOR SCHEDULE NOTES DOOR HARDWARE GROUP
3m
O HM HOLLOW METAL Hf: 93K BEST LOCKS: (7 PIN COURSE HOUSING.TYPE N.LEVER STYLE 15 n
' I 2 2 ' MFR MANUFACTURER SATIN CHROME PLATED)
�- P PAINT(MATCH EXISTING BUILIDING COLOR) BUTTS _m o
_ 1 SURFACE MOUNTED DOOR CLOSER
j= DOOR STOP,AND DOOR DEADBOLT 0 z
KICK PLATE n
/• 3 3/ \• I �I WHETHERSTIPPING m W mG ¢
/ THESHOLD e m m 0
6 I/ DOM DRIP
10 A 1 P
1 2 A 11� I e MAG LOCKS W/TIMER AND RELEASE SWITCH BY CAMDEN DOOR CONTROLS-- W m
'i L 3 A2,1 (INSTALLER TO VERIFY COMPONENT CONFIGURATION FOR PROPER FUNCTION)
A5,1 I I I 1, A5.1 6 A2.1 NOTE:ALL ITEMS TO BE SATIN ALUMINUM FINISH UNO t7 U of f c
EL �� STROOM UNISEX UNISEX RE % I I RESTROOM
tot j \ 102 / gknt
I I I I FINISH SCHEDULE crry or AM
PAWS DrPAFn)AEW
L L 9 - J FLOOR BASE N.WALL E.WALL S.WALL W.WALL CEILING
ROOM ROOM NAME MAT'L MATY. MAT'L MAT'L MAT'L MAT'L MAT'L GELLING COMMENTS
_ /e�\ NO FINISH FINISH FINISH FINISH FINISH FINISH FINISH HEIGHT
\Vc/ IO,A MEN'S RESTROOM SC RB GB/P/FP GB/P/FP G8//Pu/FP GB/P/FP GB/P 8'-6'3
21 ,OTA 0f2 \ 102A WO.MEN'S RESTRDOM SC RB GR/'P/FP GB/P/FP GB/P/FP GB/P/FP GB/P I8'-6•t
----- - - N!j FINISH SCHEDULE NOTES
B FP FIBERGLASS REINFORCED PANEL(WHITE) P PAINT(NEUTRAL GROUND SW7568,SHERWIN WILLIAMS) SC SEALED CONCRETE
GB GYPSUM BOARD RB RUBBER BASE
2'-6' 11" 3'-4' S'-9' 3'-4' Il"
R.D. R.D. FINISH SCHEDULE COMMENTS
TYP 1 1. SEE PLAN AND ELEVATIONS FOR LOCATION
14'-3" AND CLARIFICATION OFF WALL TREATMENTS
Prapct
2 B A GENERAL NOTES TrIa O
2 A. ELEVATION 100'-0'EQUALS FINISH FLOOR ELEVATION OF 157'-0'AS SATE PAW
A2.1
INDICATED ON CIVIL DRAWINGS RESTAODM
1-6112) FLOOR PLAN B. SEE S/A1.1 FOR INTERIOR SIGNAGE AMMON
C. DIMENSIONS REFLECT FACE OF FINISH TO FACE OF FINISH UNG
D. WA L THICKNESSES ARE NOMINAL UNO
112'-6'1 E SEE INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION
1 2 ALIGNALIGN W%EXISTING4 F. ALL PARTITIONS ARE WALL TYPE P1 UNO
PARAPET G. SEE SHEET ABA FOR WALL TYPE DEFINITION AND BOTH EXTERIOR AND INTERIOR DETAILS
NOTE: 27 H. CONTRACTOR IS RESPONSIBLE TO ENSURE CLEANUP OF AREA UPON COMPLETION OF CONSTRUCTION
NORTH ELEVATION SIMILAR 1. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGED WORK TO EXISTING BUILDING
OPPOSITE VIEW WITHOUT DOORS 1-0•
14 ffil �l I I I�11 I I�11 I I I I�11
,5 CAUSED BY CONSTRUCTION WORK ON THE NEW ADDITION OF RESTRCOMS. Nechonkol/Electricd/Plumbing
J. ALUMINUM SHOULD MEET ASTM B 209(ASTM B 209M).0.032 INCH THICK;MILL FINISH. SIMM DESM 91TAN,9
108'-6'x STAINLESS STEEL SHOULD MEET ASTM A 666 TYPE 304 SOFT TEMPER,0.015 INCH THICK; 1515 SE WATER AVE.,
112 BOTTOM EA�VE SMOOTH j9 FlN. SUITE 400
ALIGN
WITH
EXISTING PARAPET ALIGN WITH ACCESSORIES: FASTNERS SHOULD BE GALVINIZED STEEL W/SOFT NEOPRENE WASHERS PORTLAND,OR 97214
•j one:
EXISTING _1- PLASTIC CEMENT SHOULD MEET ASTM D 4585 TYPE 1 Ph (503)248-0227
P
2. RIMER SHOULD BE ZINC CHROMATE TYPE FA%: (503)248-0240
MATCH PROTECTIVE BACKING PAINT SHOULD BE ZINC MOLYBDATE ALKYD.
EXISTING K. CONTRACTOR TO VERIFY AND CONFIRM ALL DIMENSIONS AND LAYOUT INFORMATION.
NOTIFY OWNER FOLLOWED BY ARCHITECT OF ANY DISCREPANCIES PRIOR
108'-6'1_ 29 TO CONSTRUCTION.DO NOT SCALE DRAWINGS
BOTTOM EAYE�
ALIGN WITH ,'-4' I'-4' 6" 6' 1'-4' i'-4' TYP KEYNOTES
EXISTING 2'-1' 1. ADA ACCESSIBLE WALL MOUNTED WATER CLOSET AND GRAB BARS--SEE E/13/AB.1
MATCH 2. GRAB BARS--SEE B/13/AB.1
2, 7 / \
EXISTING 3. 3 ROLL TOILET PAPER HOLDER DISPENSER NO.R-2601,ACQUIRE THROUGH
RESTROOM WORLD--SEE C/13/AB.1
4. SINK WITH INTEGRATED SOAP DISPENSER--SEE PLUMBING
S. 3'12'XT SERIES ACCESS PANEL BY NYSTROM,PROVIDE AT LAVATORY AND TOLIET--
- 11 TYP ENSURE ACCESS PANEL COMES WITH LOCKING CAPABILITIES AND PAINTED TO MATCH SIDING
6. ELECTRIC HAND BLOWER MOUNTED 3'-0'FROM CORNER--SEE A/13/ALTA AND ELECTRICAL
30 7. PROVIDE FLASHING CAP AT TOP OF WALL SIMILAR TO DETAIL 10/A8.1
100'-0'A B. DRINKING FOUNTAIN i0 BE INSTALLED SO BATTEN PASSES BY--SEE F/13/ABA AND PLUMBING
12 iYP
FINISOE FLH WR 9. 2'X2'M SERIES ACCESS PANEL BY NYSTROM TO ACCESS DRINKING FOUNTAIN d
\ O / EO 1'-4" EO )OFLOORRAIN S UMBIN
HOLLOW METAL DOOR
-9} 13.2 2''BATTENS E DOOR SCHEDULE t'
_ 12. CORNER TRIM {�
' 4 cC` + a
B i a EAST ELEVATION 4.EXISTING BUILDING
131/2 15.CERTAIN TEED PRESIDENTIAL SHAKE LUXURY SHINGLES IN AGED BARK
100'-0•x T'Y.P 76.2%6 DFL/2 WOOD STUDS 12"OC W/BATT INSULATION112,6, 7.ETER / �',O��Q
OR PLOOD
FINISH 1'-6}' 4'-3• 14 22 T/PARAPET 18.WOOD 1CEI LING JOIST SHEATHING PAINTED TO MATCH EXISTING BUILDING /
ALIGN A8.1 23 24 FIELD VERIFY 19.PLYAOO7 SOFFIT WITH VENT--PAINT TO MATCH EXISTING BUILDING
20.4'CONCRETE SUB ON GRADE W//4 AT 24.OC EA WAY
21.CLOSURE WALL FOR CAP BETWEEN EXISTING AND NEW BUILDING O ° gTu nE�g7vF°On9
2 SOUTH ELEVATION 22,SNACNA RECTANGULAR PROFILED 6'GUTTER.PRE ELECTRO GALVANIZED 0.02 INCH THICK �HE6E NAM-ME 741 P ERTY V
/2'=Y-D' I ; u 0°'°R a amus n u"r°.
P
23.3"
rt
BASE METAL AND SHOP PRE-PRIMED.-- PAINT TO MATCH BUILDING COLORTV
•j VERIFY W/OWNER BEFORE INSTALLATION AND AWIRING If STANDARD COLOR IS PREFERRED w�0iinal P6 rmrt1T
L 23.3•DOWNSPOUT
24.SCUPPER LEADING TO DOWNSPOUT REVISIONS:
B 2 I I A 25.CRICKET $
26.ROOF SOFFIT EDGE
o :aa m A
27.NEW ACCENT PIECES ADDED TO EXISTING BUILDING
25 27.REMOVE EXISTING SHINGLES AROUND AREA AS REQUIRED
2'-6"
/--- -----\ 112'-6" /"--- _----\ 0 27.TO ADD NEW PIECES AND FLASH APPROPRIATELY
T PARAPET I I T PARAPET I I -I 28.HIDE PLYWOOD SIDING JOINTS BEHIND BATTEN
29.SOLAR TUBES 1600S WITH OPTMEW DIFFUSER AND 26 WATT LIGHT,MFR IS SOLATUBE
I I 1 I 4 Ef�1 _-SEE ELECTRICAL
J1 32 I 1 3i 32 I I 25 v \ p 15 J0.6•x8"RESTROOM SIGNAGE WITH BOTH MALE/FEMALE SYMBOLS/HANDICAP SYMBOL
1 4'-0- _ 1 VI' AND BRAILLE TEXT--MOUNT SIGN CENTER AT 60•AFF.
1 I 31.)¢•PLYWOOD W/80 O 6-D.C.AND PANEL EDGES AND 12.O.0*INTERIOR SUPPORTS
/ 32./1 '
I I I I \ TJI O 24'0'C W/SIMPSON H2.5 EA END
108-6' I 108-6' I ,I '1
1 29 33.EDDYING PER 2/A8.1.7YP ENTIRE PERIMETER
T/PLAT� \- ---- T/PLATE \- ----� �F,�( / SHEET TITLE:
7 LEGEND FLOOR PLAN
19\ 9 M a-D• EXTERIOR
ELEVATIONS
Ash EXTERIOR WALL
21 p5 1 EXTERIOR WALL
10 SECTIONS
B
AB.I
i6 PARTITION TYPE TYPICAL
j (SEE SHEET AST FOR WALL TYPES)
s
J7 ,i NON-RATED INTERIOR FULL HEIGHT PARTITION
,j WALL UNLESS NOTED OTHERWISE
_4 FIBERGLASS PANELING AND RUBBER BASE DRAWN BY:
2 A8.1
ZO A8.1 20 v ALIGN J _--` CHECKED BY:
100'-0" - I00'-0' t 14'-3' 2'-1" -- - SHEET
FINISH-FLOOR .'. F�'. FINISH FLOOR ADA ACCESSIBLE TURNING
..''..,:
27 14 RADIUS AND CLEAR FLOOR
SPACE
m
I •.
2
A21
10•
33 33
Tl-It
PAINT TYPES PAINT PL WOOD
PARTITION TYPES ARE REFERENCED ON PLANS AND EXISTING BUILDING
LL
�n
IN DETAILS 6"
1.2 BATTEN WOOD STUD W/R21 m
PARTITION TYPES ARE IDENTIFIED USING A NOTATION BEYOND BATT INSULATION u
SYSTEM AS FOLLOWS: P3 -j§"GYP BD P2 -34"GYP BD PJ -3E"GYP SO WEATHER RESISTANT W/VAPOR BARRIER c c m
2 X 6 STUDS A7 16"OC -2 X 6 STUDS AT 16'OC -10 SOUND ATTENUATION
A.PARTITION CONSTRUCTION BARRIER OVER 3f"GYP BD m m m
-5)f"SOUND ATTENUATION BATT INSULATION -5YK"SOUND ATTENUATION-
A. BATT INSULATION c LL
Pl,P2,P3,...GENERAL DESCRIPTION AND �T PLYWOOD SHEATHING SHIM AS REO'D
OVERALL DIMENSIONS -)1['PLYWOOD SHEATHING BATT INSULATION -2%12 STUDS AT 16"OC O
TYVEK MOISTURE BARRIER - GYP BD -�2"PLYWOOD SHEATHING p W < m
B.PARTITION CONDITION - FINISHED i1-11 PLYWOOD -TYVEK MOISTURE BARRIER r p q
A, FINISHED T/-11 PLYWOOD
B.C.. DETAILED DESCRIPTION OF - V'm
COMPONENTS AND PERMUTATIONS,IF ANY I.
PLYWOOD SHEATHING
METAL FLASHING METAL FLASHINGPIA C =
.I I: DRIP DOOR JAMB MULLION 1D 0.It n b
PARTITION CONSTRUCTION CONT.BAKER ROD
AND SEALANT glent
PARTITION CONDI71
CITY OF MAW
iPARKS DHPARTA@tT
n SHEAR WALL PLAN P2 CENTRAL WALL PLAN P3 PLUMBING WALL , ( I 1 DOOR HEAD
AE.1 1 1/2"=1.-0.o
6'WOOD STUD W/R-21 GYPSUM WALL BOARD
5/8•GYP BO BATT INSULATION
W/VA'BARRIER 6'STUDS
%.GYP SO 5/8"GYPSUM BOARD
FIBERGLASS REI NFORCED PLYWOOD SHEATHING BATT INSULATION PrO)eCI
2x6 FRAMING PLASTIC PANEL
2x6 WOOD SRL PLATE PLYWOOD SHEATHING
DOOR FRAME ANGFHOR W/%.o ANCHOR BOLTS -- - :. SKATE PA
O 2'-0"O.C. BLDG PAPER OVER
EXTERIOR INTERIOR OM
MTL DOOR FRAME (2)14 AT TOP PLYWOOD SHEATHING PLYWOOD SHEATHING AMMON
MTL DOOR
GRACE WCOR PLUS 1x2 BATTEN BEYOND WEATHER RESISTANT BARRIER
APPLIED FREE OF WRINKLES, 14 AT 24.OC 1 EXTERIOR FINISH
EXTENDING FROM PLYWOOD T1-11 PLYWOOD
BOTTOM RAIL TO BOTTOM OF BASE PAINT TO MATCH
WEATHERSTRIPPING DO NOT ATTACH GYP BD EXISTING BUILDING
ry
TO CONCRETE FINISH GRADE
THRESHOLD--SET IN CONCRETE SUB WEATHER SHEATHING Mechanl<cl/Electrical/Plumbing
CAULKING __ 81,81BA DE"CONSULTANTS
FULL MASTIC BED "MAX RUBBER BASE __ _ __ WEATHER RESISTIVE BARRIER
EXTERIROR SHEATHING CONCRETE SUB 1515 SE WATER AVE.,
'�MIN
FINISHED T1-I1 EXISTING
SUITE 400
WEATHER RESISTANT BARRIER PAINT TO MATCH EXISTING PORTLAND,OR 97214
e
FLEXIBLE FLASHING WITH 3'LAP J74' 1'x3)¢"SMOOTH SEALANT AT EACH Phone.(503)248-0227
SII. ILII I EXTERIOR FINISHED TRIM BOARD SIDE OF BATTEN FAX: (503)248-0240
EXTERIOR SLAB T1-11 PLYWOD NOTE: CONT.CAULK
PAINT TO MATCH USE DOW CORNING SEALANT THAT MEETS 1x2 BATTEN
EXISTING BUILDING w ASTM C920 GRADE NS CLASS 25.USES M.G, FASTEN AS REWIRED
DO AND A-SINGLE COMP014ENT
2 DOOR SILL 3 EXTERIOR DOOR JAMB 4 WALL AT BOTTOM ��CORNER TRANSITION g K o VERTICAL BATTEN
Aai1 1/2'=r-D' Aa.i J 1'-0 w J"=1'-p`; A&1 TYPICAL J=1'-0'>
RI FLASHING
FLASHING CAP4 CONT SEALANT UNDER FLASHING LAP V FIELD VERIFY
6"OVERLAP
r I I
BITUMINOUS WALL X-PLYWOOD SHEATHING _*
STRUCTURE ABOVE
BASE FLASHING 2X6 O 12"OC FLASHING CAP
FIBER CANT SIMPSON CSIB STRAP W/ WEATHER BARRIER OVER
PER MFR 12"END LENGTH O 4'-0.O.C.
)<e"PLYWOOD SHEATHING
RECOMMENDATION
SINGLE PLY ROOF FLASHING LIP Q
PLYNOOD OVER 2X8 FASCIA I L��'3 �✓j
TRIM
SHEATHING WOOD STUDS ROOF SHINGLES -
3"RIOD (J)16d _ �y
INSULATION •i BUILDING OVERHANG ROOF BASE FIBERGLASS REINFORCED ar,+ 1F;;3i7"p$n
PANELING
WOW TRUSS BOTTOM CHER I, p t�
ND ATTENUATION INSULATION FLASHING O
WL
COR A VENT
5-400 STRIP 2.BLOCKIN w CRICKET BOTTOM PLATE i0 FINISH
PAINT TO MATCH AS REO'D MADE OF GYP BD EA SIDE FLOOR WITH POWDER DRIVEN
EXISTING BUILDING SHEET ANCHORS AT 4'-0"OC �'Au RiaAR N.1 E0o
'7. METAL WOOD STUDS
DEE DRAMNcs ARE ME PRp?EFiY OF
JN P NATAENIJE AND ARE NOT 10 OE
2'_�• t GRACE WCOR PLUS 1 FED w ANr .NER.
mTMdll PRIOR wR PEm�I5510N
Ae.t
IN CONCRETE SUB RENSIONS:
OTE: 6" < aNDpAEyrErA
1X2 TRIM ` PROVIDE GRACE MOR PUSHING ROOF SHINGLES sW
SIMPSON A34 ROOF JOIST j6"CW BO SEE 1 Wi TAPER OFF GW BD
O 2'-0"OC WOOD STUD W/R21 BATT REFLECTED CEILING `/ BETWEEN WOOD MEMBER AND MASONRY 0. AT WALLS NfHILTH RECEIVE nosENO
INSULATION W/VAPOR BARRIER PLANS FOR HEIGHTS OR CONCRETE .
%"GYP BD AFF EXTEND FLASHING 6'MIN ° d c FLAT BASE
WALL AT ROOF EAVE a CEILING JOIST FRAMING s WALL TO STRUCTURE 10 TRIM WALL PIECE 3 n NON-BEARING WALL aAT FLOOR
Aa.t 1 1/2'-1'-0"y As.1 WOOD TRUSS WITH BLOCKING NO SCALE qg,1 J/4"=1-0'o A81 AT EX STING BUI DING ROOF 1 1/2"=/-0 3 Ab.1 3"=1'-0 0
3
A EXTEND ROOFING
- ® FIBERGLASS PANELING INTO SCUPPER
WALL TYPE AS SCHEDULED z rrtioOs �' �O'c N�rFniNmE a sm 1.re
ROOF ASSEMBLYAND
��� •n / ® 2•_0. STAINLESS STEEL COUNTERTOP r// Ar srm s ®vAv vx nc Frrwc rxwmx Aim Imo m Auaw4 a
-%�INSTALL PER MFR'S I F+* \� SHEET TITLE
n RECOMMENDATIONS
ACI ONfR/ORYPR F B yJiAfl BAR SFCTION ACCESSORY I `� _ rm DETAILS
CESSIBLE NTS 5 O 7 ROLL TISSUE HOLDER BULLNOSED EDGE '- r�cnx nc cvm. 'Y°�rV'r 6 Au aac su+�c AND vawv�mwm
DISPENSER
14 1-0, J-6- - / • r m anAO
rauws
OUTLETS J'-p" PROVIDE STAINIES
AB.1 6'J'-0"
STEEL FLASHING WITH
p 2x4 FASCIA FULLY WELDED SEAMS w oa°nvlrs a A•FNe1m er.K sAv�mwxp�'�'1x>m w �
j o w
FRP TRANSITION -6" m ie 6" 6' 2" 2x4 AT EACH nmcnvu vo
TRIM AT TERMINATION 0 MT BAR SUPPORT 6"GUTTER
•I 1 / mmw znOt
m F.B.N'x 2•WITH(J)
* AND CORNERS som.c auu mWw�A.aee �x.umaPaulm
M ® (J)N e x tYt'UG SCREW A
TO 2x4 AT COUNTER AND -- n.Ac oA OEvu
D�Si1LTGt1E5.-6tlQ-QUTI FT5 E " MB THRU STUDS z m�ianc�a w�vwrMe°3Rowcm�r ml rwaru mr Tam
o--�® LENDo Z LOCATE FB SUPPORTS
® AT J'-0"OC MAX �on�w Fwx; onua1e vo¢1 urs DRAWN BY:NMB
4•RUBBER BASE 19"
CHECKED BY: BKA
T +
2-9• R PROVID2 BLOCKING EBLONG M�*A wA SHEET
c� 6" INSULATION
STUDS- '(j 3"DOWNSPOUT
l3P/AIpNA .@ N B" SHONE!FOR NCLARITY 7Q, A8.1
P DRINKING FOUNTAIN OF DRAWING Q
MEN RESTROOM_ELEVATION K TOILET FIXTURES FIXTURES o n LAVATORY SECTION SCUPPER TO DOWNSPOUT
Q_J
LANDSCAPE AREAPAVED AREA ILL ;w
OR
PLAN I .
•�-y�4° v$-- I ?
SAWCU7 CURB TO PAVING SECTION,CRUSHED °oc u w
CLEAN EDGE.PATCH ROCK BASE OR LANDSCAPING
r-_A
To SMOOTH SURFACE
CONCRETE FRAME CASING
6' CONCRETE CURB CLE NWT FRAME AND COVER ���/, ��• d
//f\/r✓r i��/j 4o j�/i ®ME®6 0
///---SAWCU7 CURB TO "'/�`Jj. /�\//,r (1('-0'GRANULAR BACKFILL ®®a a y
5 / CLEAN EDGE.PATCH �i \ o COMPA TION CIFICEQUREATIONS MENTS) Ix w m c
/ TO SMOOTH SURFACE PAVING SECTION
A 45'ELBOW %�°
�ow0�° (31 U W F J
CONCRETE CURB
°o°p'O.oI'"°G=d'9 0. 1'-0'GRANULAR BACKFILL CITY
-APPROVED SEWER LINE 0 c
WHEEL BLOCKS. 45 WYE �o°:�`O,�o`C0. (SEE SPECIFICATIONS FOR CITY OF
SEE DETAIL COMPACTION REQUIREMENTS)
BE4EL PIPE PAfi:8 D�AF{IMENf
\\/ ewe.
ASPHALT PAVING SECTION END FLUSH
W/CURB /j\// �jY\i//�' / \/i/�i/\//f a a 9�°°000 °d••
e4 REBAR,18'LONG �'�, `on A_A \ ~ Y \' \\ 'moo°`A°.lvao'o°O j0 SIZE AND TYPTY PE(MAIN PIPE)
(2)PER WHEEL BLOCK. ELEVATION °'0�•D0 c0
A PRECAST CURB STOP a CURB BREAK c K FOR DOWNSPOUT CLEANOUT (&UTILITY TRENCH BEDDING AND BACKFILL
\p2_0/N.T.S wrvz.m C20 N.T.S. v, C20 N.T.S. C20 N.T. oz.xa� C20 N.T.S.
KEYNOTES
AS N N P A J GENERAL NOTES
BRA�`,lyl 1. ALIGN BUILDING W EXISTING STRUCTURE
2i CROSS SLryF 7OOIID ED(i EACH SIDE O EXISTING BATT ,SEE ARCHITECTURAL PLANS 1, ALL WORK SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND THE
_ 2. 4'PVC SANITARY SEWER STUB TO BUILDING REQUIREMENTS OF THE CITY OF TIGARD,CLEAN WATFR BERVICES(CNS),
'• _ SEE PLUMBING PLANS FOR INTERNAL PLUMBING AND THE CURRENT AMERICAN PUBLIC WORKS WATER STANDARDS FOR PUBLIC Propct
_ ''•'�' WORKS CONSTRUCTION. ��
-� 3. LOCATE EXISTING UTILITIES AND SANITARY
-I ' I_ 2. THE WORKING DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY GO NOT SHOW SKA71=pq
ECONNECTION PRIOR TO NGINEER OF POTENTIAL CONVICTS N.NOTIFY EVERY OFFSET,BEND OR ELBOW REWIRED FOR INSTALLATION IN THE SPACE
II° PROVIDED. THEY DO NOT SHOW EVERY DIMENSION,COMPONENT PIECE.SECTION, 1'E,4TflOOM
COMPACT SU El AIA AGGREGATE 4'CONCRETE 3,000 PSI 4MIN)3�'S.DYP 4. WHEELSTOP.SEE DETAIL A C2.0 JOINT.OR FITTING REQUIRED TO COMPLETE THE PROJECT.ALL LOCATIONS FOR �pR
TO 95S CE MAXIMUM DRY DENSITY ((MAA CONTROL JOINTS A 5-0 0/C ANO / WORK SHALL BE CHECKED AND COORDINATED WITH EXISTING CONDITIONS IN THE
(3-YIN) FJPA ON JOINTS AT 20'-0'0/C OR FIELD BEFORE BEGINNING CONSTRUCTION.EXISTING UNDERGROUND UTILITIES
AS SHOW ON PSS 5. MATCH EXISTING AT EXPANSION JOINT OR LAYING WITHIN THE LIMITS OF EXCAVATION SHALL BE VERIFIED AS TO
2'MIN.DEPTH.OF SAWCU7 CLEAN EDGE AS NECESSARY
CONDITION,SIZE AND LOCATION BY UNCOVERING,PROVIDING SUCH IS
AGGREGATE){-0 PERMITTED BY LOCAL PUBLIC AUTHORITIES WITH
JURISDICTION.BEFORE
F CONCRETE SIDEWALK 6. SAWCU7 CURB BREAK,SEE DETAIL B/C20 BEGINNING CONSTRUCTION. CONTRACTOR TO NOTIFY ENGINEER IF THERE ARE
]. SAWCU7 CURB BREAK FOR DOWNSPOUT, ANY DISCREPANCIES.
L.20 N.T.S, `""" SEE DETAIL C/C2.0 3. REQUEST BY THE CONTRACTOR FOR CHANGES TO THE PLANS MUST BE
B. MATCH TO EXISTING FENCE APPROVED BY THE PROJECT ARCHITECT.
4. PROVIDE GATE.POSTS.MESH.AND HARDWARE TO MATCH ADJACENT FENCING. Mechanieal/EI tricel/PIe bh9
9, 3'WIDE MANGATE W/LOCKING HARDWARE PROVIDE ADDITIONAL FENCING AND TERMINAL POSTS TO SPAN REMAINING GAPS BYSIBA C7�10l1 CONBlLTANIB
SEE GENERAL NOTE 4. EITHER SIDE OF GATE.COORDINATE SELECTION OF LOCKING HARDWARE WITH OWNER. 1515 SE WATER AVE.,
SUITE 400
PORTLAND,OR 97214
GRADING NOTES FAX: (03)2 240-0227
LEGEND
F%: (503)248-0240
';yam 4.0 SANITARY LINE O 2,OAAIN
SANITARY CLEANOUT 4'PVC SANITARY LINE NDICATEDAOitffiL N41ERE GRADES ARE NOT OBRING ALL FINISH ADES TO ERWISE APPROXIMATE
LS
METAL FRAME AND COVER/ OTHERWISE OBVIOUS
MATCH RIM TO EXISTING E,RADE 4'PVC SANITARY CLEANOUT ARE TO BE THE SAME AS STRUCTURE.
SIDEWALKS,CURBS, V THESLOP
GRADE OF ADJACENT STRUCTURE. GRADE TO UNIFORM LEVELS OR SLOPES
B 9 BETWEEN POINTS WHERE GRADES ARE GIVEN. ROUND OFF SURFACES,AVOID
- CONCRETE SIDEWAIX W/SCORINO ABRUPT CHANGES IN LEVELS. ROUGH GRADE TO ALLOW FOR DEPTH E
'1 - CONCRETE SUBS.WALKS,AND THEIR BASE COURSES. GRADE FOR PAVED
�_Tu - 111`x°. - ___ ,ey: 1 3'CONCRETE OVER 4'CRUSHED
'I° '1, I DRIVES AND PAVED PARKING AREAS AS INDICATED AND SPECIFIED HEREIN,
AND
DPROVIDDE FOR
MATERIAL.
RSURFFACE DRAINAGEAS SHOWN,ALLOWING FOR THICKNESS
OF
I T i CONCRETE SIDEWALK FINISH C.AOING AT COMPLETION OF JOB AND AFTER BACKFILLING BY
f - - OTHER CRAFTS HAS BEEN WMPLETED,REFILL AND COMPACT AREAS MHICH
4 TO BE REMOVED HAVE SETTLED OR ERODED TO BRING To FINAL GRADES.
EKa091RE J _ GRADING TOLERANCES:
I RWGH GRADE AT PAVED OR LANDSCAPED AREAS; 30.1 FT.
CMDE r .' 2 ' g t IE 7 FINISH GRADE PRIOR TO PLACING FINAL SURFACING: 30.03 FT.
_ 2- EXCAVATION: EXCAVATE FOR SLABS,PAVING,AND OTHER IMPROVEMENTS TO
OAIpNG 'R11m T .,. XCSIZES AND LEVELS SHOWN OR REWIRED. ALLOW FOR FORM CLEARANCE AND
GVE1MAvc I �� '®° % 1 'te��' / SURVEY LEGEND FOR AND
COMPACTION OF REQUIRED BACKFlWNG MATERIAL
EXCAVATOR 5 MUST COMPLY WITH O.R.S.757.541 THROUGH 757.571;
E%CAVATOR((S)SHALL NOTIFY ALL UTILITY COMPANIES FOR LINE LOCATIONS
72 HOURS(MINIMUM)PRIOR TO START OF WORK. DAMAGE TO
I"" TAX LOT 200 I TAX LOT 200 DEODUOLS IEEE UTILITIES SHALL BE CORRECTED AT THE CONTRACTDR'S EXPENSE
MAP 25-1-02DA MAP 25-i-020A R"
10.5'FACE OF WALL T I YAIER YEfEA 3. EFFECTIVE EROSION CONTROL IS REQUIRED. EROSION CONTROL DEVICES in EDGEOFEXISTING D . •I SUTIARY SEMW(]F/N Wi MUST BE INSTALLED AND MAINTAINED MEETING THE CITY OF TIGARDIREQUIREMENTS.THE GOVERNING JURISDICTION MAY,AT ANY TIME,ORDER
TWO STORY _ 1 w_i'r:o.lw `1 �f l 9p1 -- CORRECTIVE ACTION AND STOPPAGE OF WORK TO ACCOMPLISH EFFECTIVE
WOOD BU !G ®� "' "` �� STREET UO0 EROSION CONTROL. E%PIES: 12 109
FF=157.0 'I POWER SPA 4.4. EFFECTIVE DRAINAGE CONTROL IS REQUIRED. DRAINAGE SHALL BE
F s � j 5 CONTROLLED WITHIN THE WORK SITE AND SHALL BE SO ROUTED THAT ® vcNrs�cl�o
FIGHT-OF-WAY UNE ADJACENT PRIVATEADVERSELY IMPACTED.PROPERTY.PUBLIC PROPERTY,AND THE RECEIVING--�- -----� ALBANY TRMENOR ER CORRECTIVE ACTION TANDGS STOPPAGE OFRIWIXiKn�O MAY, ESE oxAx1P¢ARE DNA E K.1 TO BOr
E
pEW MAAHM AND ARE NOM TO BE
PEPPWUL'E➢IN.1 uANPEP
PROPERTY LINE ACCOMPLISH EFFECTIVE DRAINAGE CONTROL
vgiliPWT PRiwt eftiT1TN�EPu1ssLOP
I ^• - - CENTERUNE
--' '- -"-- 5. SITE
IL SHALL BE STOCKPILED DURING CONSTRUCTION AND USED REVISIONS.
CURB FOR LANDSCAPING.
FENCE LINE ..__.
_ E VEY INFORMATION SHOWN AS A BACKGROUND SCREEN ON THIS SHEET S sftr ROARtrA
6. THSUR
ROMBL LINE IS BASED ON A SURVEY BY NW SURVEYING INC,AND IS SHOWN FOUR °T
REFERENCE ONLY.CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS
/ - TEEPHDNE LINE --= '--*-' WITH HIS OWN RESOURCES PRIOR TO START OF ANY CONSTRUCTION,
SANITARY SEVER LINE ]. CONTRACTOR TO COORDINATE GRADES AT ENTRANCE WITH ARCHITECTURAL
PUNS PRIOR TO CONSTRUCTION.
- _ _ !__ WATER ZINE
UTILITY NOTES
NOTICE TO ATRS-
TENTION E RAE VANDUW QUIR YOU 1.ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF CITY OF TIGARD.
1 .G _ f PCLEAN WATER LUMBING CODEEANOC TM AND THE MR INT NAT IONALNBl1TLDDI;ION OF THE UNIFORM
__ 0 GO RE ES
- _g �. - -_ _. TO FOLLOW RULES ADOPTED BY THEE NG CODE SHEET TITLE:
mJF;py�'b6- -...yi/ .a - •�__: --__ ---.�. -"`--"' ^"`-^'-'a'" - --=-' _--'- OREGON UTILITY NOTIFICATION CENTER,
THOSE RULES ARE SET FORTH IN OAR 2.PROVIDE CLEANOUTS AS REQUIRED IN THE CURRENT UNIFORM PLUMBING CODE CML SITE,
952-001-0010 THROUGH OAR CHAPTER],SECTIONS 707 AND 719,AND CHAPTER 11,SECTION 1103.04.
952-001-0090.70U MAY.OBTAIN NOTE: NOT ALL REQUIRED CLEANOUTS ARE SHOWN ON THE PUNS. ^DEMOLICT'�IONr
COPIES OF THE RULES BY CALLING THE 3.VERIFY LOCATION,SIZE AND DEPTH OF EXISTING UTILITIES BY POTHOLING GRADINµ
CENTER. PRIOR TO CONSTRUCTION.NOTIFY ENGINEER OF DISCREPANCIES. EROSION
TAX LOT 4O0 (NOTE:THE TELEPHONE NUMBER FOR 4.SEE QUIIDING PLUMBING DRAWINGS FOR PIPING WITHIN THE BUILDING AND UP EROSION
TAX LOT 400 THE OREGON UTILITY NOTIFICATION TO 5 OUTSIDE THE BUILDING,INCLUDING ANY FOUNDATION DRAINAGE PIPING,
CONTROL,AND
MAP 2S-1-02DA MAP 2$-1-02DA CENTER Is (503)232-1987. UTILITY PLAN
- POTENTIAL UNDERGROUND FACILITY OWNERS
SiTE,GRADING,EROSION Dig;Safely.
1 SITE DEMOL1fION PLAN2 CONTROL AND U711-MY PLAN Call the Oregon one-Can Center
'o N A
SCALE:' "'° 1-800-332-2344 DRAWN BY:MJS/®®` CHECKED BY:.MWB
D
SHEET
RI FT.tR) (W iTiEr)
1-h-IR IL 1 ivch 0 IL
^/
l^_
V`e0
3�
>Yi
I
-- - -
� N m
0.
n 9 s:
i ry
I. 7 CON EC1 To SNBDU7',,
. 1 _ FROM CMc SEE OVLL N Cl W h J n n
GW OBDW$TN ONNTRACTOR t0 FIE
LLD
UY GR� I IDEATE f-f/2'OR OR WINDS:,
y ly,N LARGER Cw IN BUILDING picot
�f f I EIOSiMG BLDG P.WFL AND CpINECi CTG Wim!' I W.NCO'
1 T 'P AM ,I �t XAND
SPAL£W.7� DRU,1 RAAID�� 1 (T 1-1/2"CW,BELOW-GRADE _ -1 PATER HAMMER ARRESTOR'PD1
-1/2 L I EDJ �S1ZE B'WITH ACCESS PANEL
m
31CW
I
I wC0 ts:.
TIGARD
SKATE PARK
RESTROOM
ADDITION
i,
I
I r
MecNonicPl/ElecViwl/Plum
SYSTEM DESIGNCONOA9 StNTS0INC.
1515 SE Water Ave Sle.600
_ Patlmtl.Oregon 97214
PNPne: (503)248-0227
FAX:(503)248-0240
ME_ CHANICAL PLAN ELECTRICAL PLAN ^►�PLUMBING PLAN
�' ,/s , O — E2 1/8•=r—D' ' E2. ,/e. L_D.
D:N
c�5�4PENGIN@F s o SlEQENGINf[//�Y._
Q' 1819 �
MECHANICAL EOUIPMENT SCHEDULE FIXTURE SCHEDULE PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION ELECTRICAL MRRK FIXTURE Cl HV V BASIS OF DESIGN rBiEGON OREGON
EU CEILING EXHAUST FAN:100 Cl.AT On INCHES STATIC PRESSURE. 60 WATTS A KENALL H612EDPPDB42PI120BPC !J_[_l wATFR a—T. 1' - 2' ACORN,'MERIDIAN'MODEL 2140-T-1-E'M-1.6GPM-FLY-ADA-HS-NG,HEAVY GAUGE TYPE 304 STAINLESS STEEL SATIN FINISH, oy FRANK9 'NQS RY 1!T9Ey
WALL HTO, MINIMUM}.1/2-TRAP SEAL TOP SUPPLY,WALL MOUNTED WI TN BACK OUTLET.FRONT MOUNTED.1.6 GPF.RUSH WAIVE WITH C.BARW
GAL VANI2E0 FAN AND LASING WITH PRINTED STEEL CEILING GRILLE. 120 V,I PH 1.6 CPF LEVER HANDLE.OPEN FRONT HINGED SEAT,FLOUR MOUNTED CARRIER,ADA COMPLIANT MOUNT SEAT HEIGHT LU f8-ABOVE EIfPRES 12/31/10 E%PWES 12/]1/09
PROVIDE WITH SHORT CAVE DISCHARGE ELBOW AND EAVE DISCHARGE GRILLE. FINISHED FLOOR.
EXHAUST FRN i0 BE WIRED TO OPERATE WITH LIGHTS, ELEC�!�TRICAL NOTES
BASIS OF DESIGN LOREN COOK LITTLE GEM-11. U LAVAIORT.,WALL 1/2' - 1-1/4' 1-t/2' ACORN,'MERIDIAN'MODEL 3701-1-H-PDM-ST,WALL MOUNTED,ADA COMPLIANT,INCLUDES BASIN COUNTER BACKSPLASM, QOW uAtYENBE 1W9
�, Cmw W-TOWEL DOOR RUEASE MTD. APRON AND TRAP ENCLOSURE OF HEAVY GASATIN FINISHED.TYPE 304 STAINLESS STEEL.AIR CONTROL PUSH BUTTON M1 PoWTS RE6FAWD
0.5 D. METER'
FF,NG VALS£,STAINLESS STEEL TUBULAR SPOUT,METERING LIOUID SOAP DISPENSER.SINGLE TEMPERATURE SUPPLY. THEY ORARRIS ARE TIE PROPERTY OF
Lfi:l ELECTRIC COVE NEATER, 7511 WATTS, 59 INCHES LONG 75D WATTS A FLOOR MOUNTED WALL CARRIER. MD.A1%EPIDE AA•ARE TOT 10 BE
WALL MOUNT COVE HEATER WITH VITREOUS ENAMEL COATED EXTRUDED ALUMINUM FACE. 120 V,1 PN POWER ANRY NST LYWIROL AT A4L ASIN ➢F-f DRlN✓.lNC 1/2' 1'1/4' 1'1/2' HAWS.MODEL IAINLESST09FRBTEEI.P,FREEZE RESISTANT,WALL MOUNTED BARRIER FREE,18 GAUGE TYPE 0N.—I P�PoORWWaTRN PD—ONN
HIGH RESISTANCE NICKEL CHROME ALLOY VIRE BRASS BUR&ER HEAD.
EMBEDED IN HIGH PURITY MAGNESIUM ➢BFCIED BY OWFR N FA6TMG BULDPIG. WNYECI LOCI( FOUNTAIN WASTE] TSTRnINERs BACK PPANEL 8USH 0011 PLATE,WI NRCANE 5%IROME �AND FLOOR 4OUNTE0 WALL REYI90N5:
OXIDE AND ENCASED IN ALUMINUM SHEATH. PROVIDE MODEL M7A THERMOSTAT. DOQR pOfAY BRTM ARD WNIROL—lfTL I CARRIER.
IN MOSAT TO HAVE METAL BASE AND COVER WITH NO VISIBLE ADJUSTMENTS. $e PARAGON DTWOF TMER �<aWRas A[
SET AT AO DEGREES. I FD_1 FLUOR OR— - 1-1/2' 2' JAY R SMITH MODEL 20115-A-NB-U-PO50-02,DUCO CAST IRON BODY,5*DIAMETER NICKEL BRONZE ADJUSTABLE STRAINER
MOUNT HEATER OR VALL WITH TOP AT 4 INCHES BELOW CEILING. MOUNT THERMOSTAT CONNED TO SOVAV.SIER UFJD fIX1UM AB PARI 6 HEAD,2'OUTLET,VANDAL PROOF SCREWS AND TRAP PRIMER L NECTION. PROVIDE PRECISION PLUMBING PRODUCTS MODEL
WHERE SHOWN AT I FT BELOW CEILING. A COMREIE SMAWSIER NSTAOAMW PRDADE All P-1 OR P-2 TRAP PRIMER TO PRIME TRAP AND INSTALLED BEHIND VANDAL RESISTANT PANEL
UAVPS,
BASIS OF DESIGN,BERKO CHC SERIES,NDDEL C-7512. C
PINADE I-ATS FOR NL EOUI KT FROM EKSTNG PLUMBING LEGEND
ALL LONG DID MEW"EY6ING w NE WNL'' PIPE AND FITTINGS MATERIAL SCHEDULE
N1 A AMD PIOAOE ALL EOWYFM NECE4eln'
(Dt A COYPLLTE NS1IL1.11DN. - CV COLD WATER SYSTEM PIPE MATERIAL DESCRIPTION
• PIPE BELDV FLOOR OR GRADE
DOMESTIC VATER COPPER PIPE- PIPE:HARD DRAWN COPPER TYPE•L•ABOVE GRADE AND HARP DRAWN COPPER
---------- V VENT SYSTEMS PLUMBING TYPE•K•BELOW GRADE.CONFORMING TO ASTM B88. FITTINGS:WROUGHT COPPER
V SANITARY WASTE BELOW FLOOR OR GRADE SOLDER TYPE. SOLDER:ALLSTATE NO 4JD SOLDER AND FLUX
CTG CLEANOUT TO GRADE WASTE
STEMSND VENT CAST IRON PIPE PIPE:SERVICE WEIGHT CAST IRON PIPE CONFORMING TO ASTM A74. FITTINGS: SHEET TITLE:
FCO FLOOR CLEANOUT SERVICE WEIGHT CASs IRON CONFORMING TO ASTM A74NO HUB PIPING SYSTEM
WILL CONFORM TO CASs IRON SOIL AND WASTE INSTITUU TE STANDARD
VCO ICO VCO,CD WALL CLEANDUT,CLEANOUT SPECIFICATION JOT AND BE MARKED WITH THE CISPI TRADE MARK, ELECTRICAL
FLOOR PLAN
SHUTOFF VALVE,BALL VALVE VENT SYSTEMS LAST IRON OR GALN(IEp SEE CAST IRON PIPE AND FITTINGS DESCRIPTION ABO . GALVANIZED PIPE:
I VABiEEL PIPE SCHEDULE 40 CONFORMING TO ASTM A120A120 OOR VEA5J-96. FITTINGS:150 P51
PIPE UP SCREWED GALVANIZED MALLEABLE IRON. MECHANICAL
PIPE DO VN MISE.PIPING, COPPER PIPE PIPE:FOR I-ANO SMALLER HARD ORAWN COPPER TYPE V TUBING,FOR OVER FLOOR PLAN
VTR VENT THROUGH ROOF CONDENSATE AND 1' COPPER DRAINAGE TUBE,ASTM B306. FITTINGS FOR LARGER THAN I'
DRAIN SYSTEMS WROUGHT COPPER AND COPPER ALLOY SOLDER-JOINT DRAINAGE FITTINGS,
ASTM 816.29.
DRAWN BY. DFN/BLM
CHECKED BY: JFR/GC8
SHEET
ME2.1
Exhibit C
CENTREX CONSTRUCTION
INCORPORATED
8250 SW Hunziker Road Tigard, Oregon 97223
Phone: (503) 684-0443 Fax: (503) 620-6692
City of Tigard June 26, 2009
Department of Public Works
8720 SW Burnham Street
Tigard, Oregon 97223
Attn: Nick Nissen
RE: Tigard Skatepark Restrooms
Nick,
Centrex construction Incorporated is pleased to provide you with the following proposal
for constructing the public restrooms per the plans by Group Mackenzie dated
4/16/2009. We have value engineered the plumbing materials and fixtures to keep the
price under$50,000.00.
The price is $49,562.00
We will provide the following fixtures:
Acorn stainless steel water closet model 2 115-W-2-1.6-FVH-ADA-HS
Acorn stainless steel lavatory model 1652FA-1-LF-3
Elkay stainless steel drinking fountain model EDFP214RPK.
We will provide ABS pipe for waste lines &venting, PEX pipe for water lines and
common floor drains.
Thank you for opportunity to be of service.
Respectfully,
Russ Langbehn
Nick,
Our painting subcontractor said he would donate labor &material for that trade if he can
put up a sign that his company donated to this project. Also the drywall subcontractor
said he could get the material donated if they could put up a sign saying the material was
donated to the project.
Russ Langbehn
Centrex Construction
russ@centrexconstruction.net
503-684-0443 fax 503-620-6692
Internal Virus Database is out-of-date.
Checked by AVG.
Version: 7.5.560/Virus Database: 270.12.36/2126-Release Date: 5/21/2009 6:22 AM
Exhibit D
PREVAILING WAGE RATES
for
Public Works Contracts in Oregon
OF 0
,t r -
****** *****
1859
OF •�
M/
a• •z
OREGON BUREAU OF LABOR AND INDUSTRIES
Brad Avakian
Commissioner
Bureau of Labor and Industries
Effective: July 1, 2009
0
BRAD AVAKIAN DOUG MCKEAN
COMMISSIONER Deputy Commissioner
BUREAU OF LABOR AND INDUSTRIES
July 1,2009
In January and July of each year, the Bureau of Labor and Industries publishes the prevailing wage rates that
are required to be paid to workers on non-residential public works projects in the state of Oregon. Quarterly
updates are published in April and October. (NOTE: Different rates apply to residential projects. Contact
BOLI for more information.)
Unless specifically exempted by state law,prevailing wage rates are the minimum wages that must be paid to
all workers employed on all public works. These rates are determined using data collected from an annual
statewide construction industry wage survey of occupations and crafts performing commercial building and
heavy and highway construction in 14 geographic regions of the state.
A separate publication, entitled "Definitions of Covered Occupations for Public Works Contracts in
Oregon," provides occupational definitions used to classify the duties performed on public works projects.
Another publication, entitled "PREVAILNG WAGE RATES for Public Works Contracts in Oregon subject to
BOTH the state PWR and federal Davis-Bacon Act,"provides the applicable rates to be paid to workers on
projects subject to both the state Prevailing Wage Rate law and federal Davis-Bacon Act. These publications
are available upon request and are also available electronically at www.oregon.gov/boli.
ORS 279C.830 requires that the applicable wage rates be incorporated into all bid specifications for public
works contracts subject to the PWR law. A statement incorporating the applicable prevailing wage rate
publication and any amendments thereto or Davis-Bacon wage rate determination into the specifications by
reference will satisfy these requirements. Such reference must include the title of the applicable wage rates
publication or determination and the date of the publication or determination as well as the date of any
applicable amendments. A provision that prevailing wage rates must be paid must also appear in the contract.
Generally,the rates in effect at the time the bid specifications are first advertised are those that apply for the
duration of the project.There are some exceptions to this rule: If during the bidding process,the prevailing
wage rates change,the public agency has the option of amending the bid specifications to reflect such
changes. If a Construction Manager/General Contractor(CM/GC) is used on the project,the rates in effect at
the time the CM/GC contract becomes a public works contract are the applicable rates to be used for the
duration of the project. (See OAR 839-025-0020(6)for more information.)Note that the applicable rates
for purposes of compliance with the federal Davis-Bacon Act maybe different than the applicable
rates for purposes of compliance with Oregon's prevailing wage rate laws. The effective federal
rates will be those as determined under 29 CFR 1.6.
If you identify any errors in the rates published, or if you have any questions regarding application of the
state PWR law or the applicable rates to be paid on any project, contact the bureau's Prevailing Wage
Coordinator in Portland at(971) 673-0839.
Brad Avakian
Commissioner
Bureau of Labor and Industries
800 NE Oregon St.,Suite 1045 Portland OR 97232-2180 Telephone(971)673-0761 TDD(971)673-0766
TABLE OF CONTENTS
JULY 1, 2009
How to Look up a Rate/BOLI Offices.......................................................................................1
Public Works Bonds. 2
...................................................................................................................
PWR Survey Wage Rate Appeal Process................................................................................3
PWRRequired Postings.............................................................................................................4
Map of Prevailing Wage Rate Regions....................................................................................5
Occupations by Regions
Region 1 - Clatsop, Columbia and Tillamook Counties.................................................6-7
Region 2 - Clackamas, Multnomah and Washington Counties................................ 8-9
Region 3 - Polk, Marion and Yamhill Counties •. . •. _ ,_ _ ......- 10-11
Region 4 - Benton, Lincoln and Linn Counties12-13
....-•... ......... ........................
Region 5 Lane County. ............................................................................................. 14-15
Region 6 - Douglas County.............................................................................................16-17
Region 7 - Coos and Curry Counties...............................................................„-„......_18-19
Region 8 - Jackson and Josephine Counties.....................................„--...................,20-21
.............................................
Region 9 - Hood River, Sherman and Wasco Counties 22-23
Region 10 - Crook, Deschutes and Jefferson Counties..............................................24-25
Region 11 - Klamath and Lake Counties 26-27
Region 12 - Gilliam, Grant, Morrow, Umatilla and Wheeler Counties.......................28-29
Region 13 - Baker, Union and Wallowa Counties.........................................................30-31
Region 14 - Harney and Malheur Counties 32-33
APPENDIX 35-46
..............................................................................................................................
List of Ineligible Contractors.............................................................................................47-48
Forms................................................................................................... .......- --....• -- 49
BOLI forms necessary to comply with ORS 279C.800 through ORS 279C.870 may be found
in the back of this booklet. Contractors are encouraged to use and keep on file the forms
provided as master copies for use on future prevailing wage rate projects.
All of the information in this booklet can be accessed and printed from the Internet
at: www.oregon.gov/boli
Pursuant to ORS 279C.800 to ORS 279C.870, the prevailing wage rates contained in this
booklet have been adopted for use on public works contracts in Oregon. Additional copies
of this booklet are available for $2.00 each.
HOW TO LOOK UP A RATE
1. When was the project first advertised for bid?
For purposes of compliance with Oregon's prevailing wage rate laws, the rates in effect at
the time the bid specifications are.first advertised are those that apply for the duration of the
project. (See OAR 839-025-0020(6) for information about projects using a CM/GC.)
2. What type of work is being performed by the employee?
Using the booklet, Definitions of Covered Occupations, find the definition that most closely
matches the actual work being performed by the worker. If you have any questions about
work classifications, contact BOLI at the number below.
3. Where is the work being performed —what region?
Find the occupation in the correct region pages associated with the county where the
project construction is taking place.
4. Is there a rate listed next to the classification?
If so, use it. The prevailing wage rate is made up of an hourly base rate and an hourly
fringe rate; it is the combination of these two amounts that must be paid to the worker.
5. If the book directs you to "See Appendix," go to the back of the book and use the
rate listed in the Appendix pages. It may include a group number and/or zone pay. Zone
pay is added to the base rate.
6. Apprentices must be paid the full fringe rate in those regions where the appendix rate
does not apply. However, if the book directs you to "See Appendix," and the worker is
registered in a bona fide apprenticeship program, you may contact BOLI at (971) 673-
0839 for the applicable hourly fringe rate.
7. If you still don't know CALL BOLI at (971) 673-0839.
For specific information or questions regarding the prevailing wage law, you may obtain a "Prevailing Wage Rate
Laws" handbook by contacting the nearest Oregon Bureau of Labor and Industries office listed below. An order
form is at the back of the booklet.
BOLI Office Locations
Eugene 1400 Executive Parkway, Suite 200 (541)686-7623
Eugene, OR 97401
Medford 119 N Oakdale Ave (541)776-6270
Medford, OR 97501
Portland 800 NE Oregon St.,#1045 (971)673-0761
Portland, OR 97232
Salem 3865 Wolverine St. NE, Bldg. E-1 (503)378-3292
Salem, OR 97305
PAGE 1 JULY 1, 2009
PUBLIC WORKS BONDS
EVERY CONTRACTOR AND SUBCONTRACTOR who works on public works projects subject to the prevailing
wage rate(PWR)law is required to file a $30,000 "PUBLIC WORKS BOND"with the Construction Contractor's
Board(CCB). (ORS 279C.836) This includes flagging and landscaping companies, temporary employment
agencies, and sometimes sole proprietors.
■ This bond is to be USED EXCLUSIVELY FOR UNPAID WAGES determined to be due by the Bureau of
Labor and Industries(BOLI).
■ The bond MUST be filed BEFORE STARTING WORK on a prevailing wage rate project.
■ The bond is in effect CONTINUOUSLY(do not have to have one per project).
■ BEFORE PERMITTING A SUBCONTRACTOR TO START WORK on a public works project,
CONTRACTORS MUST VERIFY their subcontractors have either filed the bond, or have elected not to
file a public works bond due to a bona fide exemption.
■ A public works bond is in addition to any other required bond the contractor or subcontractor is required to
obtain.
Exemptions:
■ Allowed for contractors that are certified disadvantaged, minority, women or emerging small business
enterprises,for the first FOUR years of certification;
• Exempt contractor must still file written verification of certification with the CCB, and give the CCB
written notice that they elect not to file a bond.
■ For projects with a total project cost of$100,000 or less, a public works bond is not required;(Note this is
the total project cost, not an individual contract amount.)
■ Emergency projects, as defined in ORS 279A.010(f).
ORS 279C.830(3) and (4) require:
That the specifications for every contract for public works shall contain a provision stating that the contractor and
every subcontractor must have a public works bond filed with the CCB before starting work on the project, unless
otherwise exempt.
Every contract awarded by a contracting agency shall contain a provision requiring the contractor:
■ To have a public works bond filed with the CCB before starting work on the project, unless otherwise
exempt;
■ To include in every subcontract a provision Irequiring the subcontractor to have a public works bond filed
with the CCB before starting work on the project unless otherwise exempt.
JULY 1, 2009 PAGE 2
PWR SURVEY WAGE RATE APPEAL
PROCESS
1) Anyone wishing to challenge or appeal a survey rate determination should submit their
request in writing to the commissioner.
2) The appeal should include:
a) a complete description of the "problem," including the affected trade(s), and
documentation or evidence (if available) supporting why the rate determination is
incorrect
b) recommendations for how the rate could be more accurately determined.
3) The written appeal will be reviewed by the Wage and Hour Division which will recommend
to the commissioner a course of action and proposed time frame for addressing the issue
(such as a recommendation that further information be obtained, an investigation or study
of the matter be conducted, a rate amendment or correction be issued, the next survey be
modified, etc.).
4) The commissioner will review the division's recommendation and either approve,
disapprove or modify the recommendation. (The PWR Advisory Committee may be
consulted in some matters as deemed appropriate by the commissioner.)
5) The requesting party will be notified of the commissioner's decision.
PAGE 3 JULY 1, 2009
PWR REQUIRED POSTINGS
ALL CONTRACTORS AND SUBCONTRACTORS
PREVAILING WAGE RATES
Each and every contractor and subcontractor engaged in work on a public works must post the
applicable prevailing wage rates for that project in a conspicuous place at the work site so
workers have ready access to the information. ORS 279C.840(4); OAR 839-025-0033(1).
DETAILS OF FRINGE BENEFIT PROGRAMS
When a contractor or subcontractor provides for or contributes-to a health and welfare plan or
a pension plan, or both, for the contractor or subcontractor's employees who are working on a
public works project, the details of all fringe benefit plans or programs must be posted on the
work site. The posting must include a description of the plan or plans, information about how
and where claims can be made and where to obtain more information. The notice must be
posted in a conspicuous place at the work site in the same location as the prevailing wage
rates (see above). ORS 279C.840(5); OAR 839-025-0033(2)
WORK SCHEDULE
Contractors and subcontractors must give workers the regular work schedule (days of the
week and number of hours per day) in writing, before beginning work on the project.
Contractors and subcontractors may provide the schedule at the time of hire, prior to starting
work on the contract, or by posting the schedule in a location frequented by employees, along
with the prevailing wage rate information and any fringe benefit information. If an employer
fails to give written notice of the worker's schedule, the work schedule will be presumed to be a
five-day schedule. The schedule may only be changed if the change is intended to be
permanent and is not designed to evade the PWR overtime requirements. ORS 279C.540(2);
OAR 839-025-0034.
JULY 1, 2009 PAGE 4
PREVAILING WAGE RATES
OCCUPATIONS
BY
REGIONS
PREVAILING WAGE RATE
REGIONS
CIatsop
coKu wa
TUKamook
2 c 9
13
Polk Masco Hood Rver 12 Baker
Marion ,' yy�mian Gram W
YamhiiK momm
Umatius
Benton Wheeler
Un 4
iU
Crook
5 ume
6 14 Malheur
c4os DowW
cum
7 Klamath
Lake
11'
Jackson
$ Josephine
PAGE 5 JULY 1, 2009
REGION #1
Clatsop, Columbia and Tillamook Counties
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 See Appendix See Appendix
Cement Mason See Appendix See Appendix
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper(Painter&Drywall Taper) See Appendix See Appendix
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2(Carpenter Group 3&4) See Appendix See Appendix
Painter See Appendix See Appendix
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix. See Appendix
JULY 1, 2009 PAGE 6
REGION # 1
Clatsop, Columbia and Tillamook Counties
OCCUPATION
RATE
Roofer See Appendix See Appendix
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer See Appendix See Appendix
Sprinkler Fitter See Appendix See Appendix
Tender to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo, and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 7 JULY 1, 2009
REGION #2
Clackamas, Multnomah and Washington Counties
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge&Highway Carpenter(Carpenter Group 5) See Appendix See Appendix
Carpenter Group 1 &2 See Appendix See Appendix
Cement Mason See Appendix See Appendix
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper(Painter& Drywall Taper) See Appendix See Appendix
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier See Appendix See Appendix
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape LaborerfTechnician $15.91 $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2(Carpenter Group 3&4) See Appendix See Appendix
Painter See Appendix See Appendix
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason(Plasterer) See Appendix See Appendix
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 8
REGION #2
Clackamas, Multnomah, and Washington Counties
OCCUPATION
RATE
Roofer See Appendix See Appendix
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer See Appendix See Appendix
Sprinkler Fitter See Appendix See Appendix
Tenders to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason See Appendix See Appendix
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 9 JULY 1, 2009
REGION #3
Marion, Polk and Yamhill Counties
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 See Appendix See Appendix
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper•(Painter&Drywall Taper) See Appendix See Appendix
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier See Appendix See Appendix
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2(Carpenter Group 3&4) See Appendix See Appendix
Painter $19.54 $6.31
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 $27.04 $8.37
Power Equipment Operator Group 1A $27.04 $8.37
Power Equipment Operator Group 1B $27.04 $8.37
Power Equipment Operator Group 2 $27.04 $8.37
Power Equipment Operator Group 3 $27.04 $8.37
Power Equipment Operator Group 4 $27.04 $8.37
Power Equipment Operator Group 5 $27.04 $8.37
Power Equipment Operator Group 6 $27.04 $8.37
JULY 1, 2009 PAGE 10
REGION #3
Marion, Polk and Yamhill Counties
OCCUPATION
RATE
Roofer See Appendix See Appendix
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer See Appendix See Appendix
Sprinkler Fitter See Appendix See Appendix
Tender to Mason-Trades (Brick and Stonemason, Mortar
Mixer, Hod Carrier) See Appendix See Appendix
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting, and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 11 JULY 1, 2009
REGION #4
Benton, Lincoln and Linn Counties
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall,Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger $19.83 $8.74
Glazier See Appendix See Appendix
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 $22.35 $8.20
Laborer Group 2 $22.35 $8.20
Laborer Group 3 $22.35 $8.20
Laborer Group 4 $22.35 $8.20
Laborer Group 5 $22.35 $8.20
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason(Plasterer) See Appendix See Appendix
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 12
REGION #4
Benton, Lincoln and Linn Counties
OCCUPATION
RATE
Roofer See Appendix See Appendix
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tenders to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason See Appendix See Appendix
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 13 JULY 1, 2009
REGION #5
Lane County
OCCUPATIONPREVAILING WAGE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall,Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper(Painter&Drywall Taper) See Appendix See Appendix
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier See Appendix See Appendix
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix . See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91. $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor $34.45 $10.75
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason(Plasterer) See Appendix See Appendix
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 14
REGION #5
Lane County
PREVAILING WAGE
OCCUPATION
RATE
Roofer $22.83 $5.90
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tender to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason See Appendix See Appendix
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 15 JULY 1, 2009
REGION #6
Douglas County
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason $28.86 $10.90
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer $27.24 $11.66
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier $22.00 $11.12
Hazardous Material Handler/Mechanic $16.06 $5.05
Highway and Parking Striper $26.89 $8.33
Ironworker $29.05 $11.77
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 16
REGION #6
Douglas County
OCCUPATIONPREVAILING WAGE
RATE
Roofer $22.83 $5.90
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tender to Mason Trades (Brick and Stonemason, Mortar $23.92 $10.26
Mixer, Hod Cartier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 17 JULY 1, 2009
REGION #7
Coos and Curry Counties
PREVAILING WAGE
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 See Appendix See Appendix
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall,Lather,Acoustical Carpenter&Ceiling Installer $27.24 $11.66
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier See Appendix See Appendix
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker $29.05 $11.77
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor $34.45 $10.75
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason(Plasterer) See Appendix See Appendix
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 18
REGION #7
Coos and Curry Counties
OCCUPATION
RATE
Roofer $22.83 $5.90
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tender to Mason Trades (Brick and Stonemason, Mortar $23.92 $10.26
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason See Appendix See Appendix
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver See Appendix See Appendix
PAGE 19 JULY 1, 2009
REGION #8
Jackson and Josephine Counties
PREVAILING WAGE
OCCUPATION
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason $28.86 $10.90
Bridge and Highway Carpenter(Carpenter Group 5) See Appendix See Appendix
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer $27.24 $11.66
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper $26.89 $8.33
Ironworker $29.05 $11.77
Laborer Group 1 See Appendix See Appendix .
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 20
REGION #8
Jackson and Josephine Counties
PREVAILING WAGE
OCCUPATION FRINGE RATE
RATE
Roofer $22.83 $5.90
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter $30.96 $12.00
Tender to Mason Trades (Brick and Stonemason, Mortar $23.92 $10.26
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo, and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 21 . JULY 1, 2009
REGION #9
Hood River, Sherman and Wasco.Counties
PREVAILING WAGE
OCCUPATION
Asbestos Worker/insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper(Painter&Drywall Taper) See Appendix See Appendix
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2(Carpenter Group 3&4) See Appendix See Appendix
Painter $19.54 $6.31
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 22
REGION #9
Hood River, Sherman and Wasco Counties
PREVAILING WAGE
OCCUPATION
RATE
Roofer $22.83 $5.90
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tender to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter See Appendix See Appendix
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 23 JULY 1, 2009
REGION #10
Crook, Deschutes and Jefferson Counties
PREVAILING WAGE
OCCUPATION
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer $27.24 $11.66
Drywall Taper $25.54 $10.68
Electrician $30.74 $11.88
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger $19.83 $8.74
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper $26.89 $8.33
Ironworker See Appendix See Appendix
Laborer Group 1 $22.35 $8.20
Laborer Group 2 $22.35 $8.20
Laborer Group 3 $22.35 $8.20
Laborer Group 4 $22.35 $8.20
Laborer Group 5 $22.35 $8.20
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 $27.04 $8.37
Power Equipment Operator Group 1A $27.04 $8.37
Power Equipment Operator Group 1B $27.04 $8.37
Power Equipment Operator Group 2 $27.04
Power Equipment Operator Group 3 $27.04 $8.37
Power Equipment Operator Group 4 $27.04 $8.37
Power Equipment Operator Group 5 $27.04 $8.37
Power Equipment Operator Group 6 $27.04 $8.37
JULY 1, 2009 PAGE 24
'REGION #10
Crook, Deschutes and Jefferson Counties
OCCUPATION
RATE
Roofer $22.83 $5.90
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter $30.96 $12.00
Tender to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 25 JULY 1, 2009
REGION #11
Klamath and Lake Counties
PREVAILING WAGE
OCCUPATION
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructors(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker $29.05 $11.77
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape LaborerlTechnician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 26
REGION #11
Klamath and Lake Counties
OCCUPATION
RATE
Roofer $22.83 $5.90
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tender to Mason Trades (Brick and Stonemason, Mortar $23.92 $10.26
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 27 JULY 1, 2009
REGION #12
Gilliam, Grant, Morrow, Umatilla and Wheeler Counties
PREVAILING WAGE
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 See Appendix See Appendix
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker See Appendix See Appendix
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape LaborerlTechnician $15.91 $3.06
Limited Energy Electrician See Appendix See Appendix
Line Constructor See Appendix See Appendix
Marble Setter See Appendix See Appendix
Millwright Group 1 &2(Carpenter Group 3&4) See Appendix See Appendix
Painter See Appendix See Appendix
Piledriver(Carpenter Group 6) See Appendix See Appendix
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1 A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 28
REGION #12
Gilliam, Grant, Morrow, Umatilla and Wheeler Counties
PREVAILING WAGE
OCCUPATION
Roofer See Appendix See Appendix
Sheet Metal Worker See Appendix See Appendix
Soft Floor Layer See Appendix See Appendix
Sprinkler Fitter See Appendix See Appendix
Tenders to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 29 JULY 1; 2009
REGION #13
Baker, Union and Wallowa Counties
PREVAILING WAGE
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason See Appendix See Appendix
Bridge and Highway Carpenter $31.33 $10.22
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall,Lather,Acoustical Carpenter&Ceiling Installer $27.24 $11.66
Drywall Taper $25.54 $10.68
Electrician $28.94 $11.88
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger $19.83 $8.74
Glazier $22.00 $11.12
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker $29.05 $11.77
Laborer Group 1 $22.35 $8.20
Laborer Group 2 $22.35 $8.20
Laborer Group 3 $22.35 $8.20
Laborer Group 4 $22.35 $8.20
Laborer Group 5 $22.35 $8.20
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor $34.45 $10.75
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 $27.04 $8.37
Power Equipment Operator Group 1A $27.04 $8.37
Power Equipment Operator Group 1 B $27.04 $8.37
Power Equipment Operator Group 2 $27.04 $8.37
Power Equipment Operator Group 3 $27.04 $8.37
Power Equipment Operator Group 4 $27.04 $8.37
Power Equipment Operator Group 5 $27.04 $8.37
Power Equipment Operator Group 6 $27.04 $8.37
JULY 1, 2009 PAGE 30
REGION #13
Baker, Union and Wallowa Counties
PREVAILING WAGE
OCCUPATION
RATE
Roofer $22.83 $5.90
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer See Appendix See Appendix
Sprinkler Fitter See Appendix See Appendix
Tenders to Mason Trades (Brick and Stonemason, Mortar See Appendix See Appendix
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting,and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18:84 $5.55
PAGE 31 JULY 1, 2009
REGION #14
Harney and Malheur Counties
PREVAILING WAGE
OCCUPATION
RATE
Asbestos Worker/Insulator See Appendix See Appendix
Boilermaker See Appendix See Appendix
Bricklayer/Stonemason $28.86 $10.90
Bridge and Highway Carpenter See Appendix See Appendix
Carpenter Group 1 &2 $26.87 $9.92
Cement Mason $24.07 $11.33
Diver See Appendix See Appendix
Divers'Tender See Appendix See Appendix
Dredger See Appendix See Appendix
Drywall, Lather,Acoustical Carpenter&Ceiling Installer See Appendix See Appendix
Drywall Taper $25.54 $10.68
Electrician See Appendix See Appendix
Elevator Constructor, Installer and Mechanic See Appendix See Appendix
Fence Constructor(Non-metal) $22.13 $8.24
Fence Erector(Metal) $19.12 $2.80
Flagger(Laborer Group 5) See Appendix See Appendix
Glazier See Appendix See Appendix
Hazardous Materials Handler/Mechanic $16.06 $5.05
Highway and Parking Striper See Appendix See Appendix
Ironworker $29.05 $11.77
Laborer Group 1 See Appendix See Appendix
Laborer Group 2 See Appendix See Appendix
Laborer Group 3 See Appendix See Appendix
Laborer Group 4 See Appendix See Appendix
Laborer Group 5 See Appendix See Appendix
Landscape Laborer/Technician $15.91 $3.06
Limited Energy Electrician $25.54 $6.85
Line Constructor $34.45 $10.75
Marble Setter See Appendix See Appendix
Millwright Group 1 &2 $25.81 $7.92
Painter $19.54 $6.31
Piledriver $31.96 $12.16
Plasterer and Stucco Mason $22.34 $11.53
Plumber/Pipefitter/Steamfitter(Plumber) See Appendix See Appendix
Power Equipment Operator Group 1 See Appendix See Appendix
Power Equipment Operator Group 1A See Appendix See Appendix
Power Equipment Operator Group 1 B See Appendix See Appendix
Power Equipment Operator Group 2 See Appendix See Appendix
Power Equipment Operator Group 3 See Appendix See Appendix
Power Equipment Operator Group 4 See Appendix See Appendix
Power Equipment Operator Group 5 See Appendix See Appendix
Power Equipment Operator Group 6 See Appendix See Appendix
JULY 1, 2009 PAGE 32
REGION #14
Harney and Malheur Counties
PREVAILING WAGE
OCCUPATION
Roofer $22.83 $5.90
Sheet Metal Worker $28.02 $10.44
Soft Floor Layer $22.43 $7.97
Sprinkler Fitter See Appendix See Appendix
Tenders to Mason Trades (Brick and Stonemason, Mortar $23.92 $10.26
Mixer, Hod Carrier
Tender to Plasterer and Stucco Mason $14.21 $11.00
Testing,Adjusting, and Balancing(TAB)Technician $24.39 $5.82
Tile Setter/Terrazzo Worker: Hard Tile Setter $23.98 $6.57
Tile,Terrazzo,and Marble Finisher See Appendix See Appendix
Truck Driver $18.84 $5.55
PAGE 33 JULY 1, 2009 .
APPENDIX
JULY 1, 2009
NOTE. THE APPENDIX SECTION IS TO BE USED ONLY FOR REGIONS/TRADES SPECIFIED
IN PAGES 6 THROUGH 33. REFER TO PAGES 6 THROUGH 33 BEFORE USING RATES IN
THIS SECTION.
AsbestosWorker/Insulator................................................................................................36
Boilermaker......................................................................................................................... 36
Bricklayer/Stonemason...................................................................................................... 36
Bridge and Highway Carpenter (See Carpenter Group 5) .........................................36-37
CarpenterGroup 1 & 2 ..................................................................................................36-37
CementMason....................................................................................................................37
Diver................................................................................................................................37-38
Divers' Tender................................................................................................................37-38
Dredger.......................................................................................................... 38
Drywall, Lather, Acoustical Carpenter& Ceiling Installer..............................................39
Drywall Taper (See Painter)......................................................... .................................41-42
Electrician.......................................................................................................................39-40
Elevator Constructor, Installer and Mechanic.................................................................40
Flagger (See Laborer Group 5)..........................................................................................40
Glazier..................................................................................................................................40
Highway/Parking Striper....................................................................................................40
Ironworker...........................................................................................................................40
Laborer...........................................................................................................................40-41
LimitedEnergy Electrician ................................................................................................41
LineConstructor.................................................................................................................41
MarbleSetter.......................................................................................................................41
Millwright Group 1 & 2 (See Carpenter Group 3 & 4) ................................................36-37
Painterand Drywall Taper............................................................................................41-42
Piledriver (See Carpenter Group 6)..............................................................................36-37
Plastererand Stucco Mason .............................................................................................42
Plumber/Pipefitter/Steamfitter...........................................................................................42
PowerEquipment Operator..........................................................................................42-43
Roofer.............................................................................................................................43-44
SheetMetal Worker............................................................................................................44
SoftFloor Layer..................................................................................................................44
SprinklerFitter....................................................................................................................44
Tender to Mason Trades (Brick and Stonemason, Mortar Mixer, Hod Carrier)............44
Tender to Plasterer and Stucco Mason............................................................................44
Tile Setter/Terrazzo.Worker: Hard Tile Setter..................................................................44
Tile, Terrazzo, and Marble Finisher...................................................................................44
TruckDriver....................................................................................................................44-45
MAP: Power Equipment Operator, Zone 1 .......................................................................46
PAGE 35 JULY 1,2009
ORE •
HOURLYTRADE BASIC TRADE BASIC
HOURLY FRINGE
RATE RATE
ASBESTOS WORKER/ 36.53 15.89 CARPENTER(Continued)
INSULATOR
Zone Differential for Carpenters
BOILERMAKER 33.69 19.91 (Add to Zone 1 Rate)
BRICKLAYER/STONEMASON Zone 2 .85
(This trade is tended by "Tenders to Mason Zone 3 1.25
Trades") Zone 4 1.70
Zone 5 2.00
Area 1 32.32 14.05 Zone 6 3.00
Zone 7 5.00
(Add $1.00 per hour to Fringe for Refractory repair
work.) Zone 1: Projects within 30 miles of city hall in the
cities listed below.
Area 2 31.10 13.70 Zone 2: More than 30 miles but less than 40 miles.
Zone 3: More than 40 miles but less than 50 miles.
(Add $1.00 per hour to Fringe for Refractory repair Zone 4: More than 50 miles but less than 60 miles.
work.) Zone 5: More than 60 miles but less than 70 miles.
Zone 6: More than 70 miles but less than 100 miles.
Area 1 Zone 7: More than 100 miles from the respective city
hall of the cities listed below.
Baker Grant Multnomah Wallowa
Benton(a) Hood River Polk Wasco(a) Reference Cities for Group 1 and 2 Carpenters
Clackamas Lincoln(a) Sherman Washington
Clatsop Linn(a) Tillamook Yamhill Albany Goldendale Madras Roseburg
Columbia Marion Umatilla Astoria Grants Pass Medford Salem
Gilliam Morrow Union Baker City Hermiston Newport The Dalles
Bend Hood River Ontario Tillamook
Area 2 Brookings Klamath Falls Pendleton Vancouver
Burns LaGrande Portland
Benton(b) Deschutes Lane Wheeler Coos Bay Lakeview Port Orford
Coos Jefferson Lincoln(b) Eugene Longview Reedsport
Crook Klamath Linn(b)
Curry Lake Wasco(b) Zones for Groups 3 and 4 Carpenter are determined by
the distance between the project site and either
(a)North Half (b) South Half 1) The worker's residence; or
CARPENTER 2) City Hall of a reference city for the appropriate
group shown,whichever is closer
Zone 1 (Base Rate) Reference Cities for Group 3 and 4 Carpenters
Group 1 32.40 12.22 Eugene Medford Portland Vancouver
Group 2 32.55 12.22 Longview North Bend The Dalles
Group 3 32.90 12.22
Group 4 33.05 12.22 Zones for Groups 5 and 6 Carpenter are determined by
Group 5 32.90 12.22 the distance between the project site and either
Group 6 33.40 12.22 1) The worker's residence; or
2) City Hall of a reference city for the appropriate
group shown,whichever is closer
Reference Cities for Group 5 and 6 Carpenters
Bend Longview North Bend
Eugene Medford Portland
2009 PAGE36 APPENDIX
• • ' 1
HOURLYTRADE 13ASIC TRADE BASIC
RATE RATE
CARPENTER(Continued) CEMENT MASON (Continued)
Note: All job or project locations shall be computed ' Zone 1:Projects within 30 miles of city hall in the
(determined) on the basis of road miles and in the cities listed below.
following manner. A mileage measurement will start at Zone 2: More than 30 miles,but less than 40 miles.
the entrance to the respective city hall,facing the project Zone 3: More than 40 miles,but less than 50 miles.
(if possible), and shall proceed by the normal route
(shortest time-best road) to the geographical center on Zone 4: More than 50 miles,but less than 80 miles.
the highway, railroad, and street construction projects Zone 5: More than 80 miles.
(end of measurement). On all project contracts, the
geographical center where the major portion of the Reference Cities
construction is located, shall be considered the center of
the project(end measurement). Bend Eugene Portland The Dalles
Corvallis Medford Salem Vancouver
Group 1 Group 2
(Carpenter Group-I) (Carpenter Group-II) Note: All job or project locations shall be computed
(determined)on the basis of road miles and in the following
Group 3 Group 4 manner.A mileage measurement will start at the entrance to
(Millwright Group-1) (Millwright Group-II) the respective city hall, facing the project (if possible), and
shall proceed by the normal route(shortest time-best road)to
the geographical center on the highway, railroad, and street
GrGroup 6 construction projects (end of measurement). On all other
(Bridge&Highway (Piledriver) project contracts,.the geographical center where the major
Carpenter) portion of the construction is located, shall be considered the
center of the project(end measurement).
Welders receive$.75/hour above their group's rate.
DIVER&DIVERS' TENDER
When working with creosote and other toxic,
treated wood and steel material, workers shall Diver 77.94 12.22
receive $.25/hour premium pay for minimum of Divers' Tender 36.74 12.22
eight(8)hours.
1) For those workers who reside within a reference
When working in sheet pile coffer dams or cells up city below, their zone pay shall be computed from
to the external water level, Group 6 workers shall the city hall of the city wherein they reside.
receive $.15/hour premium pay for minimum of
eight(8)hours. 2) For those workers who reside nearer to a project
than is the city hall of any reference city below,the
CEMENT MASON mileage from their residence may be used in
computing their zone pay differential.
(This trade is tended by"Concrete Laborer")
3) The zone pay for all other projects shall be
Zone 1 (Base Rate) computed from the city hall of Portland.
Group 1 28.09 14.83 Zone Differential for Diver/Divers' Tender
Group 2 28.65 14.83 (Add to Zone 1 Rate)
Group 3 28.65 14.83
Group 4 29.21 14.83 Zone 2 .85
Zone 3 1.25
Zone Differential for Cement Mason Zone 4 1.70
(Add to Zone 1 Rate) Zone 5 2.00
Zone 6 3.00
Zone 2 .65 Zone 7 5.00
Zone 3 1.15
Zone 4 1.70
Zone 5 3.00
JULY 1,2009
OREGON DETERMINATION 2009-02
TRADE BASIC TRADE 13ASIC
HOURLY FRINGE HOURLY FRINGE-
RATE- RATE
DIVER&DIVERS' TENDER(Continued) DIVER&DIVERS' TENDER(Continued)
Zone 1:Projects within 30 miles of city hall in the Divers' Enclosure Pay (working without vertical
cities listed below escape):
Zone 2:More than 30 miles,but less than 40 miles.
Zone 3:More than 40 miles,but less than 50 miles. Distance Traveled
Zone 4:More than 50 miles,but less than 60 miles. In the Enclosure Hourly Enclosure Pay
Zone 5:More than 60 miles,but less than 70 miles.
Zone 6:More than 70 miles, but less than 100 5-50ft. $.50/hr.up to $4.00 maximum per da
miles. 50-100ft. $1.13/hr.up to $9.00 maximum per da
Zone 7:More than 100 miles from the city hall of 100-150ft. $2.13/hr.up to $17.00 maximum per da
employee's home local. 150-200ft. $4.63/hr. up to $37.00 maximum per da
200-300ft. $4.63/hr. up to $37.00 maximum per day,
Reference Cities for Diver/Divers' Tender plus$.40 per foot traveled in enclosure.
Astoria Klamath Falls Newport Roseburg 300-450ft. $4.63/hr.up to $37.00 maximum per day,
Bend Longview North Bend Salem plus$.80 per foot traveled in enclosure.
Eugene Medford Portland The Dalles 450-600ft. $4.63/hr.up to $37.00 maximum per day,
plus$1.60 per foot traveled in enclosure.
Note: All job or project locations shall be computed
(determined) on the basis of road miles and in the DREDGER
following manner. A mileage measurement will start at
the entrance to the respective city hall,facing the project Zone 1 (Base Rate)
(if possible), and shall proceed by the normal route
(shortest time-best road) to the geographical center on Leverman
the highway, railroad, and street construction projects (Hydraulic&Clamshell) 39.88 10.80
(end of measurement). On all project contracts, the
geographical center where the major portion of the Assistant Engineer 37.30 10.80
construction is located, shall be considered the center of (Watch Engineer,
the project(end measurement). Mechanic Machinist)
Depth Pay and Enclosure Pay are added to the Tenderman 36.12 10.80
Divers' Basic Hourly Rate to obtain the Total (Boatman
Hourly Rate for the Diver. Attending Dredge Plant)
Basic Hourly Hourly Divers' Fireman
Hourly + Depth + Enclosure = Total Fill Equipment Operator 35.16 10.80
Rate Pay Pay Hourly
Pay Rate Assistant Mate 32.96 10.80
Divers' Depth Pay: Zone Differential for Dredgers
Depth of Dive Hourly Depth Pay (Add to Zone 1 Base Rate)
50-100 ft. $1.00 per foot over 50 feet Zone B 2.50
101-150 ft. $1.50 per foot over 100 feet Zone C 4.00
151-200 ft. $2.00 per foot over 150 feet
Zone mileage based on road miles:
Zone A: Center of jobsite to no more than 30
miles from the city hall of Portland.
Zone B: More than 30 miles but not more than 50
miles.
Zone C: Over 50 miles.
JULY 1, 2009 PAGE 38 APPENDIX
HOURLYOREGON DE'TE.RN1 I NATION 2009-02
TRADE
ASIC
HOURLY
RATE RATE
DRYWALL,LATHER,ACOUSTICAL ELECTRICIAN (Continued)
CARPENTER& CEILING INSTALLER
Further, the free zone at the Oregon coast shall extend
Drywall (Acoustical and 33.14 11.93 along Hwy 101 west to the ocean Hwy 101 east 10
Drywall Applicator) miles if not already covered by the above 15-mile free
Wetwall (Lather) 30.54 14.53 zone.
Area 6
ELECTRICIAN
Electrician 29.78 13.94
Area 1 Cable Splicer 29.78 13.94
Electrician 27.66 10.83 Zone Pay for Area 6 Electrician
Cable Splicer 30.43 10.97 (Add to Basic Hourly Rate)
Area 2 Zone mileage based on road miles:
Electrician 34.95 14.78 Zone 1 0-20 miles 0.00
Cable Splicer 36.70 14.83 Zone 2 21-30 miles 1.00
Zone 3 31-40 miles 2.80
Area 3 Zone 4 41-50 miles 4.50
Zone 5 51-60 miles 6.30
Electrician 31.97 13.36 Zone 6 60 or more 9.00
There shall be a 20-mile free zone from the downtown
Area 4 Post Office in Grants Pass, Klamath Falls, Medford,
Electrician 34.05 15.10 and Roseburg.
Cable Splicer 37.46 15.20 Reference Counties
Electrical Material Handler 16.70 7.15
Area 1 Area 2 Area 3
Area 5
Malheur Gilliam Coos
Electrician 35.65 16.82 Grant Curry
Cable Splicer 35.90 16.43 Morrow Douglas(a)
Electrical Material Handler 20.32 10.56 Umatilla Lane(a)
Wheeler Lincoln
Zone Pay for Area 5 Electrician
(Add to Basic Hourly Rate)
Zone mileage based on air miles: Area 4 Area 5 Area 6
Zone 1 31-50 miles 1.50 Benton Clackamas Douglas(b)
Zone 2 51-70 miles 3.50 Lane(b) Clatsop Harney
Zone 3 71-90 miles 5.50 Linn Columbia Jackson
Zone 4 91 or more 9.00 Marion Hood River Josephine
Polk Multnomah Klamath
There shall be a 30-mile free zone from downtown Yamhill(c) Sherman Lake
Tillamook
Portland City Hall and a similar 15-mile free zone Wasco
around the following cities: Washington
Yamhill(d)
Astoria Hood River Seaside The Dalles
Tillamook (a) Those portions lying west of a line running North and
South from the NE corner of Coos County to the SE
corner of Lincoln County
3ULY 1,2099 ' APPENDIX
TRADE BASW TRADE'. BASIC
HOURLY FRINGE HOURLY FRINGE-
RATE RATE
ELECTRICIAN (Continued) IRONWORKER(Continued)
(b) Those portions lying east of a line running North Zone 1:Projects within 45 miles of city hall in the
and South from the NE corner of Coos County to cities listed below.
the SE corner of Lincoln County. Zone 2:More than 45 miles,but less than 60 miles.
(c) South half Zone 3:More than 60 miles,but less than 100 miles.
(d) North half
Zone 4:More than 100 miles.
ELEVATOR CONSTRUCTOR,INSTALLER
AND MECHANIC Note: Zone pay for Ironworkers shall be determined using
AAA road mileage computed from the city hall of the
reference cities listed below or the residence of the
Area 1 employee,whichever is nearer to the project.
Mechanic 42.91 18.29 Reference Cities
Area 2 Medford Portland
Mechanic 43.09 18.29 LABORER
Reference Cities Zone 1 (Base Rate):
Area 1 Area 2 Group 1 24.66 11.15
Group 2 25.29 11.15
Baker All Group 3 25.75 11.15
Umatilla Remaining Group 4 26.15 11.15
Union Counties
Wallowa Group 5 21.51 11.15
Note: A Hazardous Waste Removal Differential must be
FLAGGER See Laborer, Group 5 added to'the base rate if work is performed inside the
boundary of a Federally Designated Hazardous Waste Site.
GLAZIER 30.30 14.33 A Group 1 base rate is used for General Laborer on such a
site. For further information on this, call the Prevailing
Add $1.00 to base rate if safety belt is required by Wage Rate Coordinator at(971)673-0839.
State safety regulations.
Zone Differential for Laborers
Add $4.00 to base rate for work done from a non- (Add to Zone 1 Rate)
motorized single-man bosun chair.
Zone 2 .65
HIGHWAY/PARKING STRIPER Zone 3 1.15
28.27 8.27 Zone 4 1.70
Zone 5 2.75
IRONWORKER 33.12 17.40
Zone 1:Projects within 30 miles of city hall in the
Zone Differential for Ironworker cities listed below.
(Add to Basic Hourly Rate) Zone 2:More than 30 miles but less than 40 miles.
Zone 3:More than 40 miles but less than 50 miles.
Zone 1 0.00 Zone 4:More than 50 miles but less than 80 miles.
Zone 2 3.75 hr. or$30.00 maximum per day Zone 5:More than 80 miles.
Zone 3 6.88 hr. or$55.00 maximum per day
Zone 4 8.75 hr. or$70.00 maximum per day Reference Cities
Albany Burns Hermiston Portland
Astoria Coos Bay Klamath Falls Roseburg
Baker City Eugene Medford Salem
Bend Grants Pass Newport The Dalles
2009 PAGE 40 APPENDIX
OREGON DETEIRMINATION 2009-02
TRADE- BASIC TRADE BASIC
110URLY FRINGE liOURLY FRINGE
RATE" RATE
LABORER(Continued) LIMITED ENERGY ELECTRICIAN
(Continued)
Note: All job or project locations shall be computed
(determined) on the basis of road miles and in the a) Those portions lying west of a line running North and
following manner. A mileage measurement will start at South from the NE corner of Coos County to the SE
the entrance to the respective city hall, facing the project corner of Lincoln County.
(if possible), and shall proceed by the normal route (b) Those portions lying east of a line running North and
(shortest time-best road) to the geographical center on South from the NE comer of Coos County to the SE
the highway, railroad, and street construction projects corner of Lincoln County.
(end of measurement). On all project contracts, the (c) South half
geographical center where the major portion of the (d) North half
construction is located, shall be considered the center of
the project(end measurement). LINE CONSTRUCTOR
LIMITED ENERGY ELECTRICIAN Area 1
Area 2 26.95 11.89 Group 1 46.26 12.88
Area 3 23.03 11.49 Group 2 40.23 12.66
Area 4 26.04 10.93 Group 3 28.58 9.71
Area 5 26.95 12.51 Group 4 34.60 10.19
Area 6 24.90 10.40 Group 5 30.17 9.78
Zone Pay for Area 6 Limited Energy Electricians Group 6 28.16 9.68
(Add to Basic Hourly Rate) Area 1 All counties.except Malheur County
Zone mileage based on air miles: Group 1 Group 3
Cable Splicer Tree Trimmer
Zone 1 0-20 miles 0.00 Leadman Pole Sprayer
Zone 2 21-30 miles 1.00
Zone 3 31-40 miles 2.80 Group 2 Group 4
Zone 4 41-50 miles 4.50 Certified Lineman Welder Line Equipment Man
Zone 5 51-60 miles 6.30 Heavy Line Equipment Man
Zone 6 60 or more 9.00 Journeyman Lineman Welder Group 5
Journeyman Lineman Head Groundman
There shall be a 20-mile free zone from the Lineman JackHammer Man
downtown Post Office in Grants Pass, Klamath Heavy Equipment Man Powderman
Pole Sprayer
Falls,Medford,and Roseburg. Group 6
Groundman
Area 2 Area 3 Area 4
MARBLE SETTER 33.32 14.05
Gilliam Coos Lane(b) (This trade is tended by "Tile, Terrazzo, & Marble
Grant Curry Marion Finishers")
Morrow Lane(a) Polk
Umatilla Yamhill(c)
Wheeler PAINTER&DRYWALL TAPER
Area 5 Area 6 Commercial Painting 19.69 7.34
Clackamas Jackson Industrial Painting 23.34 7.34
Clatsop Josephine
Columbia Add $0.75 to base rate for work over 60 ft. high on
Multnomah swing stage, mechanical climber, spider or bucket
Tillamook truck for both commercial and industrial painting.
Washington
Yamhill(d)
JULY 1,2009 PAGE 41 APPENDIX
OREGON DE-11"101INATION 2009-02
TRADE BASIC TRADE BASIC
HOURLY FRINGE HOURLY FRINGE
RATE RATE-
PAINTER&DRYWALL TAPER PLUMBER/PIPEFITTER/STEAMFITTER
(Continued) (Continued)
Drywall Taper 33.86 11.33 Area 1 Area 2 Area 3
PLASTERER AND STUCCO MASON Baker Grant(b) All Remaining
(This trade is tended by"Tenders to Plasterers") Harney(a) Morrow Counties
Malheur Umatilla
Nozzleman 30.86 12.81 Union
Swinging Scaffold .29.86 12.81 Wallowa
All Other Work 28.86 12.81
(a) Except Northwest Portion
PLUMBER/PIPEFITTER/STEAMFITTER (b) Except Southwest Portion
Area 1 26.70 10.65 POWER EQUIPMENT OPERATOR
Add $2.21 per hour to basic hourly rate if it is Zone 1 (Base Rate)
possible for worker to fall 30 ft. or more, or if
required to wear a fresh-air mask or similar Group 1 36.22 10.90
equipment for 2 hours or more. Group 1 A 38.03 10.90
Group 1B 39.84 10.90
Zone Differential for Area 1 Group 2 34.65 10.90
Plumber/Pinefitter/Steamfitter/ Group 3 33.69 10.90
(Add to Base Rate) Group 4 32.78 10.90
Group 5 31.71 10.90
Zone 1 2.50 per hour Group 6 28.82 10.90
Zone 2 3.50 per hour
Zone 3 5.00 per hour Note: A Hazardous Waste Removal Differential must
be added to the base rate if work is performed inside
Zone mileage based on road miles: the boundary of a Federally Designated Waste Site.
For information on this differential, call the Prevailing
Zone 1: Forty (40) to fifty five (55) miles-Basic Wage Rate Coordinator at(971)673-0839.
rate plus $2.50 per hour.
Zone 2: Fifty five(5 5)to one hundred(100)miles- Zone Rates
Basic rate plus$3.50 per hour.
Zone 3: Over one hundred (100) miles-Basic rate Zone 2 2.50
plus $5.00 per hour. Zone 3 5.00
There shall be a maximum of ten (10)hours of For the Following Metropolitan Counties:
zone pay per workday.
Multnomah, Clackamas, Marion, Yamhill, Washington
Reference Cities for Area 1: and Columbia:
Boise,Idaho
Twin Falls,Idaho See map on page 46 for Zone 1 of this classification
Area 2 41.09 20.15 (A)All jobs or projects located in Multnomah,
Clackamas and Marion counties, west of the
Area 3 35.69 18.79 western boundaryof Mt. Hood National Forest and
west of mile post 30 on Interstate 84 and west of
mile post 30 on State Hwy 26 and west of mile
post 30 on Hwy 22 and all jobs located in Yamhill
County,Washington County and Columbia County
shall receive Zone 1 pay for all classifications.
JULY 1,2009 PAGE 42 APPENDIX
OREGON DETERMINATION 2009-02
TRADE BASIC TRADE BASIC
HOURLY FRINGE HOURLY PRINCE
RATE RATE,
POWER EQUIPMENT OPERATOR ROOFER(Continued)
(Continued) - Area I*
(B) All jobs or projects located in the area outside Clackamas Gilliam Multnomah Washington
the identified boundary above, but less than 50 Clatsop Grant Tillamook Wheeler
miles from the Portland City Hall shall receive Columbia
Zone 2 pay for all classifications.
*On all jobs on which coal tar pitch is the basic roofing
(C) All jobs or projects located more than 50 miles material or where the old roof being removed is
from the Portland City Hall, but outside the composed of coal tar based material, a rate of pay ten
identified border above, shall receive Zone 3 percent (10%) greater than the basic rate of pay shall
pay for all classifications. be paid for all work performed.
For the Following Cities: *All employees engaged in removing fiberglass
insulation shall receive a rate of pay ten percent (10%)
Albany; Bend; Coos Bay; Eugene; Grants Pass; greater than the employee's basic rate of pay.
Klamath Falls; Medford and Roseburg:
Area 2** (a) & (b)
(A)All jobs or projects located within 30 miles of
the respective city hall of the above mentioned. Roofer 21.29 9.90
cities shall receive Zone 1 pay for all Benton Marion
classifications. Lincoln Polk
Linn Yamhill
(B) All jobs or projects located more than 30 miles
and less than 50 miles from the respective city ** Add $2.00 to basic hourly rate for application,
hall of the above mentioned cities shall receive spudding and cutting or removal of coal tar products.
Zone 2 for all classifications.
** Add $0.50 per hour to base hourly rate for
(C) All jobs or projects located more than 50 miles application, spudding and cutting or removal of
from the respective city hall of the above fiberglass insulation.
mentioned cities shall receive Zone 3 pay for
all classifications. Area 4***
Note: All job or project locations shall be computed Roofer 22.65 8.70
(determined) on the basis of road miles and in the
following manner. A mileage measurement will start at Umatilla
the entrance to the respective city hall,facing the project
(if possible), and shall proceed by the normal route ***Add $2.00 to basic hourly rate for employees
(shortest time-best road) to the geographical'center on working with irritable bituminous materials.
the highway,railroad,and street construction projects
(end of measurement).On all other project contracts,the ***Add $2.00 to basic hourly rate for employees.
geographical center where the major portion of the
construction is located, shall be considered the center of "Forking with"Densdeck"roofing board.
the project(end measurement).
***Add $2.00 to basic hourly rate for employees
ROOFER removing fiberglass insulation.
Area 1* Area 5****
Roofer 26.93 8.65 Roofer 22.56 8.75
Handling coal tar pitch 29.62 8.65
Remove fiberglass insulation 29.62 8.65 Morrow
XLY 1,
11 43
TRADE BASIC
RATE RATE
ROOFER(Continued) TENDERS TO MASON TRADES Brick and
Stonemason,Mortar Mixer,Hod Carrier)
**** Add $3.00 to basic hourly rate for employees (Continued)
working with irritable bituminous materials
Add to base rate an amount equal to that received for
SHEET METAL WORKER safety belt requirements or other unusual job
Area 1 34.42 16.95 conditions by the mechanic this worker is tending.
Add $1.00 to base rate for work performed on any TENDER TO PLASTERER AND STUCCO
MASON
swinging platform, swinging chair or swinging 23.62 11.00
ladder.
TILE SETTER/TERRAZZO WORKER: Hard Tile
Add $1.00 to base rate for work with lead or Setter 27.68 12.90
installing material in a plant that uses lead in any
form to manufacture a product (excluding (This trade is tended by "Tile, Terrazzo, & Marble
soldering). Finisher")
Add $1.00 to base rate for work performed in a TILE,TERRAZZO,AND MARBLE FINISHER
confined space as defined by OSHA.
TILE,TERRAZZO FINISHER
Area 3 29.71 . 15.00 21.11 9.50
Add $1.00 to base rate for work where it is BRICK AND MARBLE FINISHER
necessary to wear a chemically activated face 21.11 9.60
mask.
Add $1.00 to base rate if safety belt required by State
Area 4 30.00 15.12 safety regulations.
Area 5 28.63 15.89 Add $1.00 to base rate if work involves epoxy,
furnane, alkor acetylene black grouting or waterproof
Area 1 Area 1 (Cont.) Area 5 membrane.
Benton Washington Coos TRUCK DRIVER
Clackamas Wheeler Curry
Clatsop
Columbia Area 3 Group 1 26.90 12.75
Gilliam Morrow Group 2 27.02 12.75
Grant Umatilla Group 3 27.15 12.75
Lincoln Group 4 27.41 12.75
Linn Area 4 Group 5 27.63 12.75
Multnomah Douglas Group 6 27.79 12.75
Tillamook Lane Group 7 27.99 12.75
SOFT FLOOR LAYER 25.83 10.85
(Zone Pay in addition to Basic Hourly Rate and
SPRINKLER FITTER 33.25 16.55 Fringe.)
TENDERS TO MASON TRADES Brick and For the Following Cities:
Stonemason,Mortar Mixer,Hod Carrier)
Albany Grants Pass Ontario
25.14 11.00 Astoria Hermiston Oregon City
Baker Hood River Pendleton
Add $0.50 to base rate for refractory work. Bend Klamath Falls Portland
Bingen LaGrande Port Orford
Brookings Lakeview Reedsport
Bums Longview Roseburg
JULY 1,2009 PAGE 44 APPENDIX
OREGON DETERMINATION 2009-02
TRADE BASIC TRADE BASIC
HOURLY FRINGE HOURLY FRINGE
RATE' RATE
TRUCK DRIVER(Continued)
Coos Bay Madras Salem
Corvallis Medford The Dalles
Eugene McMinnville Tillamook
Goldendale Newport Vancouver
Zone differential for Truck Drivers
(Add to Zone A rate)
Zone B .65
Zone C 1.15
Zone D 1.70
Zone E 2.75
Zone A: Projects within 30 miles of the cities listed
above
Zone B: More than 30 miles but less than 40 miles.
Zone C: More than 40 miles but less than 50 miles.
Zone D: More than 50 miles but less than 80 miles.
Zone E: More than 80 miles.
Note: All job or project locations shall be computed
(determined) on the basis of road miles and in the
following manner. A mileage measurement will start at
the entrance to the respective city hall,facing the project
(if possible), and shall proceed by the normal route
(shortest time-best road) to the geographical center on
the highway, railroad, and street construction projects
(end of measurement).On all other project contracts, the
geographical center where the major portion of the
construction is located, shall be considered the center of
the project(end measurement).
JULY 1, 2009 PAGE 45 APPENDIX
OREGON DE'TERMINATION 2009-02
Power Equipment Operators
Zone 1
'T -x SCALE
Vit:,s_��:i T4M:.;� ei•>i Britt^7 �°C t„S.`-.,t ..
�: _,��,. ��:; �1+•ti �,: i�,.-.�. 0 10 MILES
„,,! § 7 �a. it s: IZdrier
s •$"u'ta.'�.c } 4`P,v!' i) .Plntoar
_
tg
VW
fir
.:iir.: y..k{{,,,4;!
Ali"lli:)��').'.y�,Vi_1..i?r'-ykv'\�u'_"v ...
Blasi
'h)P�a
`= 84 �2Y1�f1 fi4'
z4y pm
pd1•�S�-'
;�;�Ej', 5' ri. l...l
On6alQ; ti`S'Lph_';i„ }�4 ,�,�lrti
„'E?•k �'yTr"E,�:if e'S�`���TI ow: NI I r'
TNOM
I
Ufa
.,ii!I i, F 1lYf�ih itl"`w. ttN� i i YWVM
MWWp1'NMAI1.E �-
d,�rr fi p
1 t_F 1�"^`}F ";1p+.rr�JOL!?E7siii'ya,'v;f'7f+i_ GG I. fwl ft @Daly '1p
UNCCI,N GiY
� t
! ) l..
3
Ki �5 'F SPwr C. ',. _
(•'Ll� ._. w
0 ULEFO(rr
Mdjr
dis 2
NEWPOW
JULY 1,
Y
I
u
200946 APPENDIX
LIST OF CONTRACTORS INELIGIBLE
TO RECEIVE PUBLIC WORKS CONTRACTS
PUBLICATION DATE: July 1,2009
To: All Oregon Contracting Agencies
Pursuant to ORS 279C.860, contractors on this list are ineligible to receive public works contracts subject to the
Prevailing Wage Rate Law. These contractors and subcontractors, as well as any firm, corporation, partnership
or association in which the contractor or subcontractor has a financial interest are ineligible to receive public
works contracts until removed from this list.
If you have questions regarding the list or for the most current information regarding persons ineligible to receive
prevailing wage contracts, please contact the Prevailing Wage Rate Coordinator in(Portland)at(971)67370839.
CONTRACTOR NAME DATE PLACED REMOVAL DATE
1. 3 Flags Traffic Control, Inc. October 6, 2006 October 5, 2009
PO Box 42
Terrebonne, OR 97760
2. ACMS Cabinets, Inc. August 12, 2008 August 11, 2011
1510 SW Friendly Court.
McMinnville, OR 97128
3. Daniel J. Bateman dba Builders Hardware January 11, 2008 January 10, 2011
Service
PO Box 1677
Albany, OR 97321
4• Sam Boulis and Janet Boulis January 22, 2009 January 21, 2012
15460 Brianne Court
Lake Oswego, OR 97035
5. Cameron Creations May 25, 2000 Not to be Removed
Steven Cameron
Nancy Cameron
PO Box 2
Lowell, OR 97452
6. Collins and Collins Construction Co. May 27, 2009 May 26, 2012
dba Collins and Collins Construction
2957 SW Peridot Avenue
PO Box 420
Redmond, OR 97756
7. Clifford J. Fullman January 12, 2007 January 11, 2010
PO Box 67248
Portland, OR 97268
8. Christine M. Hulstein October 6, 2006 October 5, 2009
PO Box 42
Terrebonne, OR 97760
9• JBH Installations, Inc. January 11, 2008 January 10, 2011
40209 Donomore Court
Temecula, CA 92591
PAGE 47 JULY 1, 2009
LIST OF CONTRACTORS INELIGIBLE
TO RECEIVE PUBLIC WORKS CONTRACTS
PUBLICATION DATE: July 1,2009
CONTRACTOR NAME DATE PLACED REMOVAL DATE
10. KTM, Inc. March 3, 2008 March 2, 2011
28532 Crow Road.
Eugene, OR 97402
11. James Ray Lincoln aka October 2, 2007 October 1, 2010
Jimmy Ray Lincoln dba
and fdba James Lincoln Drywall
730 Russel Drive
Hammond, OR 97121
12. Robert Dean Moore May 27, 2009 May 26, 2012
439 SW 301h Court
Troutdale, OR 97060
13. Omega West Painting, Inc. January 22, 2009 January 21, 2012
PO Box 6683
Portland, OR 97228
14. Rob's Custom Interiors, Inc. May 27, 2009 May 26, 2012
439 SW 30th Court
Troutdale, OR 97060
15. Anthony Taylor August 12, 2008 August 11,2011
1510 SW Friendly Court.
McMinnville, OR 97128
16. Pamela Testerman March 3, 2008 March 2, 2011
28532 Crow Road.
Eugene, OR 97402
17. Bradley L.Thomas May 27, 2009 May 26, 2012
465 NE 181s, #503
Portland, OR 97230
18. Westside Painting, Inc. July 1, 2009 June 30, 2012
PO Box 6986
Portland, OR 97228
BRAD AVAKIAN, COMMISSIONER
OREGON BUREAU OF LABOR AND INDUSTRIES
JULY 1, 2009 PAGE 48
PREVAILING WAGE RATE FORMS
WH-38 Certified Payroll Form
WH-39 Public Work Contract Fee Information Form
WH-40 Public Work Contract Fee Adjustment Form
WH-81 Notice of Award of Public Works Contract
WH-118 Planned Public Improvement Summary
WH-119 Capital Improvement Cost Comparison Estimate
PAGE 49 JULY 1, 2009
F
BUREAU OF LABOR AND INDUSTRIES
PREVAILING WAGE RATE UNIT
INSTRUCTIONS FOR COMPLETING THE PREVAILING WAGE RATE
PAYROLL/CERTIFIED STATEMENT FORM
This form may be used by contractors for reporting their payroll as required by ORS 279C.845 on public
works projects subject to the Prevailing Wage Rate Law. Although this form has not been officially approved
by the USDOL, it is designed to meet the requirements of the federal Davis-Bacon Act as well. The form
contains a certified statement that is required to be signed by the contractor, certifying the accuracy of the
information reported on the payroll, including representations pertaining to the provision of fringe benefits to
employees by third parties. Contractors are not required to use this form in reporting their payroll; however,
the contractor must provide all of the information contained in the form, and the certified statement must be
signed and submitted with the contractor's payroll. Detailed instructions concerning the preparation.of the
form follow:
Complete the box at the top of the form. Check either the prime contractor or subcontractor box. Be sure to
enter the date the.contract was first advertised for bid. If you are not sure of this date, contact the Public
Contracting Agency.
Column 1 — NAME AND ADDRESS: The employee's full name must be shown on each payroll submitted.
The employee's address must also be shown on the first payroll submitted. The address need not be shown
on subsequent payrolls submitted unless the address changes.
Column 2—TRADE CLASSIFICATIONS: List the classification found in the Bureau of Labor and Industries'
publication "Prevailing Wage Rates for Public Works Contracts in Oregon," that is most descriptive of the
work actually performed by the employee. Give the group number for those worker classifications that
include such information. Consult the worker classifications and minimum prevailing wage rate schedule set
forth in the contract specifications. Use the appropriate prevailing wage rates in effect at the time the
contract was first advertised for bid for information regarding trade classifications, base hourly rates, and
hourly fringe benefits. Indicate which workers are apprentices, if any, and give their current percentage,
trade classification, and group number when applicable. If an employee works in more than one worker
classification, use the highest rate for all hours worked, or use separate line entries to show hours worked,
rate of pay, and fringe benefit for each classification.
Column 3—DAY AND DATE: Enter the day of the week(M, T, W, Th, F, S, and Sn)in the top row of boxes,
and the corresponding date below.
HOURS WORKED EACH DAY: Enter the total number of "straight time" hours worked in the row marked
"S". Hours worked over 8 in a day or work performed on Saturdays, Sundays, and legal holidays should be
entered as overtime ("OT") hours worked. Contractors who have adopted a written work schedule of four
consecutive ten-hour days, Monday through Thursday or Tuesday through Friday may enter hours worked
over 10 in a day as overtime hours.
Column 4—TOTAL HOURS: Enter separately the total number of straight time and overtime hours worked
by each listed employee and classification during this pay period. The total number of straight time hours
worked should be entered in the lower box ("S"); the total number of overtime hours worked should be
entered in the top box("OT").
Column 5—BASE HOURLY RATE OF PAY: Enter the base hourly rate and the overtime hourly rate(if any)
paid the employee in the appropriate straight time and overtime boxes. (Payment of not less than one and
one half times the base or regular rate of pay, not including fringe benefits, is required to be paid in overtime
pursuant to ORS 279C.540).
t '
Column 6 — HOURLY FRINGE BENEFIT AMOUNT PAID AS WAGES TO THE EMPLOYEE: Enter any
additional wages paid directly to the employee in lieu of fringe benefits. (It is not necessary to pay time and a
half for overtime work on those wages that are paid in lieu of fringe benefits.)
Column 7 — GROSS AMOUNT EARNED: Enter gross amount earned on this project. If part of the
employees' weekly wages were earned on projects other than the project described on this payroll, enter in
column 7 first the amount earned on the PWR project then the gross amount earned during the week on all
projects, thus$63.00/$120.00.
Column 8 — ITEMIZED DEDUCTIONS, FICA, FED, STATE, ETC.: Enter a list of itemized deductions
withheld from the wages of each employee for only those hours reported on this payroll/certified statement
for this project. All deductions must be in accordance with the provisions of ORS 652.610 (and as defined in
Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Act, as
amended (48 Stat. 948, 63 Stat. 108, 72 Stat. Stat. 967, 76 Stat. 357; 40 U.S.0 276c)on projects subject to
Davis-Bacon Act.)
Column 9 — NET WAGES PAID FOR WEEK: Enter the total amount of net wages actually paid to the
employee after subtracting the total deductions reported in Column 8 from the gross amount earned shown
in Column 7.
Column 10 — HOURLY FRINGE BENEFITS PAID TO BENEFITS PARTY, PLAN, FUND OR PROGRAM:
Enter the hourly amount of fringe benefits paid to each individually approved party, plan, fund or program for
each employee. List these amounts separately on the lines provided. Any contractor who is making
payments to approved parties, plans, funds or programs on amounts less than the required hourly fringe
benefit is obligated to pay the difference directly to the employee as wages in lieu of fringe benefits, and to
show that amount in Column 6 of this form.
Column 11 — NAME OF BENEFIT PARTY, PLAN, FUND OR PROGRAM: Enter the name of the parry,
plan,fund or program that corresponds to the amount paid as an hourly fringe benefit in Column 10.
CALCULATION CHECK
In order to determine whether the wages and fringe benefits paid are sufficient to meet prevailing wage rate
requirements, the following check may be performed:
1. For each trade classification listed in column 2, compute the sum of:
a) the Base Hourly Rate of Pay(Column 5),
b) the Hourly Fringe Benefit Amount Paid as Wages to Employee(Column 6)
c) and the Hourly Fringe Benefits Paid to Benefit Party, Plan, Fund or Program (Column 10).
2. This sum must equal or exceed the total of the Base Hourly Rate (including zone pay and
special wage differentials, if any)and the Fringe Benefit Amount as they are listed for the
corresponding trade classifications in the appropriate issue of the Bureau of Labor and Industries
publications Prevailing Wage Rates for Public Works Contracts in Oreqon and Prevailing Wage
Rates for Public Works Contracts Subject to BOTH the State PWR and Federal Davis-Bacon
Act.
IF YOU HAVE QUESTIONS REGARDING COMPLETION OF THIS FORM, CONTACT THE PREVAILING
WAGE RATE UNIT OF THE BUREAU OF LABOR AND INDUSTRIES AT(971)673-0852.
NOTE: PAYROLL/CERTIFIED STATEMENTS ARE REQUIRED TO BE SUBMITTED TO THE
CONTRACTING AGENCY ONLY.
CERTIFIED PAYROLL AND OTHER FORMS ARE AVAILABLE ON OUR WEBSITE:
WWW.OREGON.GOV/BOLI
WH-38A(Rev.01/09)
BUREAU OF LABOR AND INDUSTRIES PAYROLL/CERTIFIED STATEMENT FORM WH-38
WAGE AND HOUR DIVISION FOR USE IN COMPLYING WITH ORS 279C.845'
PRIME CONTRACTOR❑ SUBCONTRACTOR❑ PAYROLL NO.
Business Name(DBA): Phone: ( ) CCB Registration Number:
Project Name: Project Number: Type of Work:
Street Address: Project Location:
Mailing Address: Project County:
Date Pay Period Began: Date Pay Period Ended:
THIS SECTION FOR PRIME CONTRACTORS ONLY THIS SECTION FOR SUBCONTRACTORS ONLY
Subcontract Amount:
Public Contracting Agency Name:
) Prime Contractor Business Name(DBA):
Phone: (
Prime Contractor Phone: (
Date Contract Specifications First Advertised for Bid: )
Contract Amount: Prime Contractor's CCB Registration Number:
Date You Began Work on the Project:
1 2 3 DAY AND DATE 4 5 6 7 8 9 10 11
HOURLY
TRADE, FRINGE NET HOURLY FRINGE
CLASSIFICATION BASE ITEMIZED BENEFIT GROSS WAGES BENEFITSFIT PAID TO NAME OF BENEFIT
NAME AND ADDRESS TOTAL HOURLY DEDUCTIONS
OF EMPLOYEE (INCLUDE GROUP#AND HOURS RATE AMOUNTS AMOUNT FICA,FED,STATE, PAID BENEFIT PARTY, PARTY,PLAN,FUND,OR
APPRENTICESHIP STEP PAID AS EARNED FOR PLAN,FUND,OR PROGRAM
IF APPLICABLE) OF PAY WAGES TO ETC. WEEK PROGRAM
HOURS WORKED EACH DAY I EMPLOYEE
OT
ST
OT
ST
OT
ST
OT
ST
OT
ST
*Although this form has not been officially approved by the U.S.Department of Labor, it is designed to meet the requirements of both the state PWR law and the federal Davis-Bacon Act.
WH-38(Rev.01-09) THIS FORM CONTINUED ON REVERSE
CERTIFIED STATEMENT
Date: In addition to completing sections(1)-(3),if your project is subject to the federal
Davis-Bacon Act requirements,complete the following section as well:
I,
(NAME OF SIGNATORY PARTY) (TITLE) (4)That:
do hereby state: (a)WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS OR
(1)That I pay or supervise the payment of the persons employed by: PROGRAMS
(CONTRACTOR, SUBCONTRACTOR OR SURETY) ❑- In addition to the basic hourly wage rates paid to each laborer or mechanic
on the ;that during the payroll period listed in the above referenced payroll,payments of fringe benefits as listed in
(BUILDING OR WORK) the contract have been or will be made to appropriate programs for the benefit
commencing on the day of and ending the day of such employees,except as noted in Section 4(c)below.
(MONTH) (YEAR)
of all persons employed on said project have been paid the (b)WHERE FRINGE BENEFITS ARE PAID IN CASH
(MONTH) (YEAR)
full weekly wages earned,that no rebates have been or will be made either directly or ❑- Each laborer or mechanic listed in the above referenced payroll has been paid,
indirectly to or on behalf of said as indicated on the payroll, an amount not less than the sum of the applicable
(CONTRACTOR, SUBCONTRACTOR OR SURETY) basic hourly wage rate plus the amount of the required fringe benefits as listed
from the full weekly wages earned by any person,and that no deductions have been in the contract, except as.noted in Section 4(c)below.
made either directly or indirectly from the full wages earned by any person, other than
permissible deductions as specified in ORS 652.610, and as defined in Regulations, Part (c) EXCEPTIONS:
3(29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Act,as
amended(48 Stat. 948,63 Stat. 108, 72 Stat. 967;76 Stat. 357;40 U.S.C. 276c), and EXCEPTION(CRAFT) EXPLANATION
described below:
(2)That any payrolls otherwise under this contract required to be submitted for the above
period are correct and complete;that the-wage rates for workers contained therein are
not less than the applicable wage rates contained in any wage determination
incorporated into the contract; that the classifications set forth therein for each worker
conform with work performed.
(3)That any apprentices employed in the above period are duly registered in a bona fide REMARKS:
apprenticeship program registered with a state apprenticeship agency recognized by the
Bureau of Apprenticeship and Training, United States Department of Labor, or if no such
recognized agency exists in a state, are registered with the Bureau of Apprenticeship
and Training, United States Department of Labor.
HAVE READ THIS CERTIFIED STATEMENT, KNOW THE CONTENTS THEREOF NAME AND TITLE SIGNATURE
AND IT IS TRUE TO MY KNOWLEDGE:
THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY
(NAME AND TITLE) SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL OR CRIMINAL
PROSECUTION. SEE SECTION 1001 OF TITLE 18 AND SECTION 231 OF TITLE 31
OF THE UNITED STATES CODE.
SIGNATURE AND DATE
FILE THIS FORM WITH THE CONTRACTING AGENCY
NOTE TO CONTRACTORS: YOU MUST ATTACH COPIES OF THIS FORM TO EACH OF YOUR PAYROLL SUBMISSIONS ON THIS PROJECT.
INSTRUCTIONS AND ADDITIONAL FORMS ARE AVAILABLE ON OUR WEBSITE: WWW.OREGON.GOWBOLI.
WH-38(Rev.01-09)
F CONTRACT FEE SECTION
PREVAILING WAGE RATE UNIT
4 i BUREAU OF LABOR AND INDUSTRIES
m ? 800 N.E.OREGON ST.,#1045
PORTLAND,OR 97232-2180
.I '9 PHONE: (971)673-0852
For O
FAX: (971) 673-0769 Office Use Only:
Project DB#:
PUBLIC WORKS FEE INFORMATION FORM
For use by public agencies that have contracted with a contractor on a public works project regulated by
ORS 279C.800 to 279C.870,in compliance with ORS 279C.825. Also for use by public agencies that are a
party to a public works project pursuant to ORS 279C.800(6)(a)(B)or(C).
PUBLIC AGENCIES: Please complete and mail this form to BOLI at the above address, along with the public
works fee of one-tenth of one percent of the contract price (contract amount x .00 1), payable to BOLI. The
minimum fee is $250.00; the maximum fee is $7,500.00. Without the following completed information, the
bureau may be unable to properly credit you for payment received.
PUBLIC AGENCY: AGENCY#:
AGENCY MAILING ADDRESS:
CITY, STATE,ZIP:
AGENCY CONTACT PERSON: PHONE: ( 1
PROJECT MANAGER NAME: PHONE: ( )
PROJECT NAME:
CONTRACT NAME (if part of larger project):
PROJECT LOCATION:
PROJECT NO: DATE CONTRACT FIRST ADVERTISED:
DATE CONTRACT AWARDED: CONTRACTOR CCB#:
CONTRACTOR BUSINESS NAME(DBA):
CONTRACTOR ADDRESS:
CITY,STATE ZIP
CONTRACT AMOUNT: $ FEE AMOUNT DUE/PAID: $
If less than$50K,is it part of a larger project? ❑yes❑no Contract amount x.001 =fee due
(Please duplicate this form for future use.)
WH-39(Rev.03/09)
o F o CONTRACT FEE SECTION
PREVAILING WAGE RATE UNIT
BUREAU OF LABOR AND INDUSTRIES
i :Z 800 N.E. OREGON ST.,#1045
PORTLAND OR 97232-2180 �" g�
� ��For�OfficeUselOnlyN "
PHONE: (971)673-0852 `
FAX: (971)673-0769 �ra�ectI)B#� �� i
PUBLIC WORKS FEE ADJUSTMENT FORM
THIS FORM TO BE USED FOR RECONCILIATION OF FEES UPON COMPLETION OF
PUBLIC WORKS PROJECTS
(As required by ORS 279C.825 and OAR 839-025-0210)
PUBLIC AGENCIES: Complete and mail this form to BOLI at the above address after completion of the public work project
and not less than 30 days after the final progress payment is made to the contractor. Public agencies are required to determine
the final contract price, including all change orders or other adjustments to the original contract price, and to calculate the
adjusted prevailing wage rate fee based on the revised contract price. Documentation must be included to support the final
contract price. Documentation of the final contract price may consist of change orders or other contract documents
substantiating the amount of the contract. The prevailing wage rate fee of one-tenth of one percent(.001) shall be applied to
the final contract price,with credit taken for fees already submitted.The public agency must submit any additional fee payable
to BOLI, or submit any request for refund, with this adjustment form. NO ADDITIONAL FEE IS REQUIRED TO BE
PAID,AND REFUNDS WILL NOT BE MADE,FOR RECONCILED AMOUNTS OF LESS THAN$100.00.
PUBLIC AGENCY: AGENCY#:
AGENCY CONTACT PERSON: PHONE:( )
MAILING ADDRESS:
PROJECT NAME:
CONTRACT NAME (if part of larger project):
PROJECT NUMBER: PROJECT LOCATION:
CONTRACTOR/BUSINESS NAME (DBA):
CONTRACTOR CCB#: DATE AWARDED:
FINAL CONTRACT/PROJECT AMOUNT: FINAL FEE DUE:
(Include all change orders and adjustments to the contract price) (Final Contract amount X
.001)
ORIGINAL CONTRACT AMOUNT: INITIAL FEE PAID:
(Original Contract amount X.001)
TOTAL ADJUSTMENT: BALANCE DUE*:
or
REFUND DUE*:
*Final contract fee less initial fee paid
Sample Calculation:
Final Contract Amount: $400,000.00 Final Fee Due: $400.00
Original Contract Amount: - 300,000.00 Initial Fee Paid: = 300.00
Total Adjustment: $100,000.00 Additional Amount Due: $100.00
(Please duplicate this form for future use)
WH-40(Rev. 11/07)
F
BUREAU OF LABOR AND INDUSTRIES
NOTICE OF PUBLIC WORKS
(For use by public agencies in complying with ORS 279C.835
for public works awarded after January 1,2008)
NOTE: ORS 279C.835 requires that public contracting agencies include with this form a copy of the disclosure of first-tier
subcontractors submitted pursuant to ORS 279C.370.
PUBLIC AGENCY INFORMATION
Agency Name: Agency Number(if known):
Address: Agency Division:
City, State,Zip:
Agency Representative: Phone:
SECTION A: To be completed when a public agency awards a contract to a contractor for a public works project,including
CM/GC projects. (See reverse for public works projects in which no public agency awards a contract to a
contractor.)
CONTRACT INFORMATION:
Project Name: Project Number:
Contract Name(if part of larger project): Contract Number:
Project Manager Name: Phone#: Fax#:
Project Location(Street(s),City): Project County:
Contract Amount: $ If under$50,000,is this contract part of a larger project? YES NO
If yes,total project amount: $
Will project use federal funds that require compliance with the Davis-Bacon Act? YES NO
Date Contract Specifications First Advertised for Bid(if not advertised,date of RFP or first contact with contractor):
If CM/GC Contract,Date Contract Became a Public Works Contract(see OAR 839-025-0020(6)):
Date Contract Awarded: Date Work Expected to Begin:
Date Work Expected to be Complete:
PRIME CONTRACTOR INFORMATION:
Name:
Address:
City,State Zip: Phone:
Construction Contractors Board Registration Number:
Name of Bonding Company:
Address:
Agent Name and Phone Number:
Bond Number:
❑ Copy of first-tier subcontractors attached(see NOTE above).
THIS FORM WILL BE RETURNED TO THE PUBLIC AGENCY FOR CORRECTION AND RESUBMITTAL IF INCOMPLETE.
WH-81(Rev 03-08)
Notice of Public Works—Page 2
SECTION B: To be completed when a project is a public works pursuant to ORS 279C.800(6)(a)(B)(a project for the
construction,reconstruction,major renovation or painting of a privately owned road,highway,building,
structure or improvement of any type that uses funds of a private entity and$750,000 or more of funds of a
public agency)and no public agency awards a contract to a contractor.
CONTRACT INFORMATION:
Name of Project Owner: Phone#: Fax#:
Project Name: Project Number:
Project Location(Street(s),City): Project County:
Total Project Amount: $ Amount of Public Funds Provided for the project:$
Name(s)of Public Agency(ies)Providing Public Funds:
Date the public agency or agencies commit to the provision of funds for the project:
Will project use federal funds that require compliance with the Davis-Bacon Act? YES NO
Date Work Expected to Begin:
Date Work Expected to be Complete:
SECTION C: To be completed when a project is a public works pursuant to ORS 279C.800(6)(a)(C)(a project for the
construction of a privately owned road,highway,building,structure or improvement of any type that uses
funds of a private entity and in which 25 percent or more of the square footage of the completed project will be
occupied or used by a public agency)and no public agency awards a contract to a contractor.
CONTRACT INFORMATION:
Name of Project Owner: Phone#: Fax#:
Project Name: Project Number:
Project Location(Street(s),City): Project County:
Total Project Amount: $ Amount of Public Funds Provided for the project: $
Name(s)of Public Agency(ies)Providing Public Funds:
Total square footage of privately owned road,highway,building,structure or improvement:
Percent of total square footage of the completed project that will be occupied or used by a public agency:
Date the public agency or agencies entered into an agreement to occupy or use the completed project:
Will project use federal funds that require compliance with the Davis-Bacon Act? YES NO
Date Work Expected to Begin:
Date Work Expected to be Complete:
THIS FORM WILL BE RETURNED TO THE PUBLIC AGENCY FOR CORRECTION AND RESUBMITTAL IF INCOMPLETE.
Signature of agency representative completing form:
Printed Name: Phone#: Date:
RETURN THIS COMPLETED FORM TO:
Prevailing Wage Rate Unit•Bureau of Labor and Industries•800 NE Oregon Street,#1045•Portland,OR 97232-2180
Telephone(971)673-0852•FAX(971)673-0769
WH-81(Rev 03-08)
F
PLANNED PUBLIC IMPROVEMENT SUMMARY
FISCAL YEAR: PAGE OF
(Name of State or Local Government Agency)
Project Estimated
Number Project Name Project Type Project Location Project Cost Agency or Contract Work
ORS 279C.305 requires that not less than 30 days prior to adoption of its budget for the subsequent budget period, each public agency shall prepare and file with the
Commissioner of the Bureau of Labor and Industries a list of every public improvement known to the agency that the agency plans to fund in the budget period, identifying each
improvement by name and estimating the total on-site constructions costs. The list shall also contain a statement as to whether the agency intends to perform the construction
by a private contractor. If the agency intends_to perform construction work using the agency's own equipment and personnel on a project estimated to cost more than
$125,000,the agency must also show that its decision conforms to the state's policy that public agencies make every effort to construct public improvements at the least cost to
the public agency. Public agencies are required to keep and preserve a full, true and accurate account of the costs of performing the work, including all engineering and
administrative expenses, and the cost, including investment costs, of any equipment used.
This form (WH-118) may be used to list planned public improvements. Form WH-119 (Capital Improvement Project Cost Comparison Estimate) may be used to report the
agency's least cost analysis.
Completed forms should be mailed to: Prevailing Wage Rate.Unit
Wage and Hour Division,#1045
Bureau of Labor and Industries
800 N.E.Oregon St.
Portland, OR 97232-2180
WHA 18(Rev. 02/05)
F
CAPITAL IMPROVEMENT PROJECT COST COMPARISON ESTIMATE
IuFi: ..r - :OI
g (Name of State or Local Government Agency)
DEPARTMENT: PROJECT NAME:
PROPOSED YEAR: FUND:
PROJECT DESCRIPTION: PROJECT NUMBER:
Rough Agency Force Estimate Agency Contract Estimate
Quantity Units Work Class Description
Estimates Unit Cost Total Cost Unit Cost Total Cost
$ Is
ESTIMATED CONSTRUCTION PERIOD:
The above-named agency has determined that this project can be performed at the least cost by: ❑ the Agency ❑ Contractor(check one)
(Signature of Agency Official)
ORS 279C.305 requires that not less than 30 days prior to adoption.of its budget for the subsequent budget period, each public agency shall prepare and file with the Commissioner of the
Bureau of Labor and Industries a list of every public improvement known to the agency that the agency plans to fund in the budget period,identifying each improvement by name and estimating
the total on-site constructions costs. The list shall also contain a statement as to whether the agency intends to perform the construction by a private contractor. If the agency intends to perform
construction work using the agency's own equipment and personnel on a project estimated to cost more than$125,000,the agency must also show that its decision conforms to the state's policy
that public agencies make every effort to construct public improvements at the least cost to the public agency. Public agencies are required to keep and preserve a full, true and accurate
account of the costs of performing the work,including all engineering and administrative expenses,and the cost,including investment costs,of any equipment used.
Form WH-118(Planned Public Improvement Summary)may be used to list planned public improvements. This form(WH-119)may be used to report the agency's least cost analysis.
Completed forms should be mailed to: Prevailing Wage Rate Unit
Wage and Hour Division,#1045
Bureau of Labor and Industries
800 N.E.Oregon St.
Portland,OR 97232-2180
The 2008 edition of the Prevailink Waze Rate Laws handbook is now
available. In addition to providing this and other Prevailing Wage
Rate (PWR) publications, the Bureau of Labor and Industries'
PWR Unit regularly offers free informational seminars for both
public agencies and contractors.
If you are interested in receiving the handbook and/or being
included on our mailing lists for future publications or seminars,
please complete the order form below and return it to the bureau's
PWR Unit. You may mail this form to the address on the opposite
side of the form, or fax it to (971) 673-0769.
---------------------------------------------------------------------------------------------------------------------
fold on dotted line if mailing form
name/business name/agency title
address
city state zip code
❑ Send me the 2008 edition of the Prevailing Wage Rate Laws handbook.
❑ Add me to the mailing list to receive information about BOLI PWR seminars.
❑ Add me to the e-mailing list to receive information about PWR seminars.
E-mail address:
(Please print clearly)
❑ Add me to the mailing list to receive rate books.
place
stamp
here
BOLI - PREVAILING WAGE RATE UNIT
800 NE OREGON #1045
PORTLAND, OR 97232
BUREAU OF LABOR AND INDUSTRIES PRSRT STD
WAGE AND HOUR DIVISION
800 NE OREGON STREET#1045 US POSTAGE
PORTLAND, OR 97232 PAID
PORTLAND, OR
PERMIT#5