Loading...
Permit CITY OF T MECHANICAL , DEVELOPMENT LOPMENT SERVICES d PERMIT # PERMIT ^ ° -MEC96 -0361 Hall Blvd., Tigard, OR 97223 (503) 639-4171 6 t) � 1 DATE IS 10/21/96 l ll hq ti PARCEL: 1 S 136CB- 08200 SITE ADDRESS...: 08240 SW STEVE ST SUBDIVISION • HERB & PEGGY'S PLACE ZONING: R -4.5 BLOCK LOT °1 CLASS OF WORK..:ADD FLOOR FURN ° 0 EVAP COOLERS: 0 TYPE OF USE -SF UNIT HEATERS..: 0 VENT FANS...: 0 OCCUPANCY GRP..:A1 VENTS W/0 APPL: 0 VENT SYSTEMS: 0 STORIES ° 0 BOILERS /COMPRESSORS HOODS • 0 FUEL TYPES 0 -3 HP : 0 DOMES. INCIN: 0 ° 3 -15 HP • 0 COMML. INCIN: 0 MAX INPUT: 0 BTU 15 -30 HP ° 0 REPAIR UNITS: 0 FIRE DAMPERS ?..: 30 -50 HP : 0 WOODSTOVES..: 0 GAS PRESSURE...: 50+ HF' ° 0 CLO DRYERS..: 0 NO. OF UNITS -. AIR HANDLING UNITS OTHER UNITS.: 0 FURN < 100K BTU: 0 (= 10000 cfm: 0 GAS OUTLETS.: 1 FURN ) =100K BTU: 0 > 10000 cfm: 0 Remarks: ADDING GAS PIPING OUTLETS Owner: FEES -- MICHAEL RANSI-iOT type amount by date recpt 8240 SW STEVE F'RMT $ 25.00 TAT 10/21/96 96- 285444 SPCT $ 1.25 TAT 10/21/96 96- 285444 TIGARD OR 97223 Phone #: 620 -0530 Contractor: -- CONTRACTOR NOT ON FILE Phone #: $ 26.25 TOTAL Reg #.. . REQUIRED INSPECTIONS - This permit is issued subject to the regulations contained in the Gas Line Insp Tigard Municipal Code, State of Ore. Specialty Codes and all other Misc. Inspection applicable laws. All work will be done in accordance with Final Inspection approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. F'er•mittee Si tu � // - i Issued By: ��_ /_4_, 1 / Call for inspection - 639 -4175 Page No. 1 CASE HISTORY FOR CASE NO.: MEC96 -0361 MICHAEL RANSHOT 08240 SW STEVE ST 02/24/99 Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By - - -- - -- - - ------ - -- MECA007 Application received / / / / 10/18/96 RECD TAT 10/18/96 TAT MECA010 Plan check by / / / / / / 10/18/96 TAT MECA060 (F) Issue permit / / / / 10/21/96 PASS TAT 10/21/96 TAT MECA705 Gas Line Insp 10/21/96 / / / / See Building Final- Done at same time as PASS 02/19/99 RB building and approved by GS. MECA725 Misc. Inspection 10/21/96 / / / / 10/21/96 TAT MECA799 Final Inspection 10/21/96 / / 02/19/99 Case final PASS RB 02/19/99 RB MECA800 Case Finaled / / / / 02/24/99 02/24/99 JT •