Permit CITY OF T MECHANICAL
, DEVELOPMENT LOPMENT SERVICES d PERMIT # PERMIT
^ ° -MEC96 -0361 Hall Blvd., Tigard, OR 97223 (503) 639-4171
6 t) � 1 DATE IS 10/21/96
l ll hq
ti PARCEL: 1 S 136CB- 08200
SITE ADDRESS...: 08240 SW STEVE ST
SUBDIVISION • HERB & PEGGY'S PLACE ZONING: R -4.5
BLOCK LOT °1
CLASS OF WORK..:ADD FLOOR FURN ° 0 EVAP COOLERS: 0
TYPE OF USE -SF UNIT HEATERS..: 0 VENT FANS...: 0
OCCUPANCY GRP..:A1 VENTS W/0 APPL: 0 VENT SYSTEMS: 0
STORIES ° 0 BOILERS /COMPRESSORS HOODS • 0
FUEL TYPES 0 -3 HP : 0 DOMES. INCIN: 0
° 3 -15 HP • 0 COMML. INCIN: 0
MAX INPUT: 0 BTU 15 -30 HP ° 0 REPAIR UNITS: 0
FIRE DAMPERS ?..: 30 -50 HP : 0 WOODSTOVES..: 0
GAS PRESSURE...: 50+ HF' ° 0 CLO DRYERS..: 0
NO. OF UNITS -. AIR HANDLING UNITS OTHER UNITS.: 0
FURN < 100K BTU: 0 (= 10000 cfm: 0 GAS OUTLETS.: 1
FURN ) =100K BTU: 0 > 10000 cfm: 0
Remarks: ADDING GAS PIPING OUTLETS
Owner: FEES --
MICHAEL RANSI-iOT type amount by date recpt
8240 SW STEVE F'RMT $ 25.00 TAT 10/21/96 96- 285444
SPCT $ 1.25 TAT 10/21/96 96- 285444
TIGARD OR 97223
Phone #: 620 -0530
Contractor: --
CONTRACTOR NOT ON FILE
Phone #: $ 26.25 TOTAL
Reg #.. .
REQUIRED INSPECTIONS -
This permit is issued subject to the regulations contained in the Gas Line Insp
Tigard Municipal Code, State of Ore. Specialty Codes and all other Misc. Inspection
applicable laws. All work will be done in accordance with Final Inspection
approved plans. This permit will expire if work is not started
within 180 days of issuance, or if work is suspended for more
than 180 days.
F'er•mittee Si tu � // -
i
Issued By: ��_ /_4_, 1
/ Call for inspection - 639 -4175
Page No. 1 CASE HISTORY FOR CASE NO.: MEC96 -0361
MICHAEL RANSHOT
08240 SW STEVE ST
02/24/99
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
- - -- - -- - - ------ - --
MECA007 Application received / / / / 10/18/96 RECD TAT 10/18/96 TAT
MECA010 Plan check by / / / / / / 10/18/96 TAT
MECA060 (F) Issue permit / / / / 10/21/96 PASS TAT 10/21/96 TAT
MECA705 Gas Line Insp 10/21/96 / / / / See Building Final- Done at same time as PASS 02/19/99 RB
building and approved by GS.
MECA725 Misc. Inspection 10/21/96 / / / / 10/21/96 TAT
MECA799 Final Inspection 10/21/96 / / 02/19/99 Case final PASS RB 02/19/99 RB
MECA800 Case Finaled / / / / 02/24/99 02/24/99 JT
•