Permit i.
CI1YOFTIGARD PERMI PERMIT MST93 -0551
COMMUNITY DEVELOPMENT DEP RTMEINT DATE ISSUED: 11/05/93
.13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 839 -4171
PARCEL: 2S1O4BB -06300
SITE ADDRESS...: 14127 SW STARDUST LN
SUBDIVISION • CASTLE HILL ZONING:
BLOCK LOT :004
BUILDING
REISSUE: DWELLING UNITS:1 BASEMENT :0 sf
CLASS OF WORK.:NEW BEDRMS:5 BATHS:3 GARAGE -528 sf
TYPE OF USE...:SF FLOOR AREAS REQUIRED SETBACKS
TYPE OF CONST.:5N FIRST • 1105 sf LEFT..:7 ft RIGHT.: 15 ft
OCCUPANCY GRP.:R3 SECOND...: 1140 sf FRONT.:20 ft REAR..: 15 ft
STORIES •2 THIRD •0 sf REQUIRED
HEIGHT •28 ft TOTAL :2245 sf SMOKE DETECTORS.:Y
FLOOR LOAD -40 psf VALUE $• 112774 PARKING SPACES..:1
Remarks: PATH I
PLUMBING
SINKS -1 FLOOR DRAINS •0 BACKFLOW PREVNTRS..:O
LAVATORIES •4 WATER HEATERS...:1 TRAPS :0
TUB /SHOWERS -3 LAUNDRY TRAYS...:0 CATCH BASINS •0
WATER CLOSETS..:3 SEWER LINE (ft).:0 GREASE TRAPS •0
DISHWASHERS •1 WATER LINE (ft).:1O0 OTHER FIXTURES •0
GARBAGE DISP...:1 RAIN DRAIN (ft).:O
WASHING MACH...:1 SF RAIN DRAINS..:1
MECHANICAL FEES
FUEL TYPES UNIT HTRS..:O type amount by date recpt
/GAS/ / / VENTS -0 TIF $ 0.00 . CDT93 -0003
MAX INPUT:0 BTU VENT FANS..:4 BPRT $ 465.50 JH 11/05/93 —
FURN ( 1O0K ..:0 HOODS •1 BPLC $ 302.58 JLH 10/21/93 93- 245384
FURN ) =1O0K ..:1 WOODSTOVES.:0 BSPC $ 23.28 JH 11/05/93 —
FLOOR FURN •0 CLO DRYERS.: 1 SSDC $ 280.00 JH 11/05/93 —
BOIL/CMP < 3HP:0 OTHER UNITS:1 PARK $ 500.00 JH 11/05/93 —
GAS OUTLETS:1 MPRT $ 45.00 JH 11/05/93 —
Owner: MPLC $ 11.25 JH 11/05/93 —
WICKENS CONST INC M5PC $ 2.25 JH 11/05/93 —
18317 SW FALLATIN LOOP PPRT $ 147.50 JH 11/05/93 —
P5PC $ 7.38 JH 11/05/93 —
ALOHA OR 97007
Phone #: 591 -1833
Contract or:
WICKENS CONSTRUCTION, INC
18317 SW FALLATIN LOOP
ALOHA OR 97007
Phone #: 591 -1833
Reg #..: 83355
$ 1784.74 TOTAL
This permit is issued subject to the regulations contained in the REQU I RED INSPECT IONS
Tigard Municipal Code, State of Ore. Specialty Codes and all other Foot /found Insp Fireplace Insp
applicable laws. All work will be done in accordance with approved Post /Beam Struct Gas Line Insp
plans. This permit will expire if work is not started within 180 Post /Beam Mechan Insulation Insp
days of issuance, or if work is suspended for more than 180 days. Plm /undslab Insp Gyp Board Insp
g �� T �J.�, RLM /Underfloor Rain drain InsP
Permittee Signature: Mechanical Ins p Water Line Ins
Plumb Top Out Appr /Sdwlk Insp
Issued By:, Framing Insp Mechanical Final
Call for inspection — 639 -4175
P
CITY OF T LUMBING PERMIT
11/05/93 -0551
COMMUNITY DEVELOPMENT DEPARTMENT
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639 -4171 PARCEL: 2S 104BB -06300
SITE ADDRESS...: 14127 SW STARDUST LN
SUBDIVISION • CASTLE HILL ZONING:
BLOCK • LOT •004
CLASS OF WORK..:NEW GARBAGE DISPOSALS..:1
TYPE OF USE -SF WASHING MACH •1 BACKFLOW PREVNTRS..:0
OCCUPANCY GRP..:R3 FLOOR DRAINS •0 TRAPS •0
STORIES -2 WATER HEATERS •1 CATCH BASINS •0
FIXTURES LAUNDRY TRAYS -0 SF RAIN DRAINS •1
SINKS •1 GREASE TRAPS -0
LAVATORIES •4 OTHER FIXTURES •0
TUB /SHOWERS • SEWER LINE (ft) •0
WATER CLOSETS..:3 WATER LINE (ft) •100
DISHWASHERS •1 RAIN DRAIN (ft) :0
Remarks: PATH I
OWNER: FEES
WICKENS CONST INC TIF $ 0.00 . CDT93 -0003
18317 SW FALLATIN LOOP BPRT $ 465.50 JH 11/05/93 -
BPLC $ 302.58 JLH 10/21/93 93- 245384
ALOHA OR 97007 B5PC $ 23.28 JH 11/05/93 -
Phone #: 591 -1833 SSDC $ 280.00 JH 11/05/93 -
PARK $ 500.00 JH 11/05/93 -
Plumbing Contractor: MPRT $ 45.00 JH 11/05/93 -
D MPLC $ 11.25 JH 11/05/93 -
Name : 14,C '�'1 /}'�� �J1� M5PC $ 2.25 JH 11/05/93 -
Address: PO. 1y- ,;ddtr,793 c PPRT $ 147.50 JH 11/05/93 -
City: R,Rrz. State: OP, P5PC $ 7.38 JH 11/05/93 -
Zip: 172847 Phone #: (So3) 236 - 5/OZO
Reg #: 79283
REQUIRED INSPECTIONS
This permit is issued subject to the reg-
ulations contained in the Tigard Municipal Foot /found Insp Rain drain Insp
Code, State of Ore. Specialty Codes and all Post /Beam Struct Water Line Insp
other applicable laws. All work will be done Post /Beam Mechan Appr /Sdwlk Insp
in accordance with approved plans. This Plm /undslab Insp Mechanical Final
permit will expire if work is not started PLM /Underfloor Plumb Final
within 180 days of issuance, or if work is Mechanical Insp Building Final
suspended for more than 180 days. Plumb Top Out Erosion Control
Framing Insp Crawl Drain
Fireplace Insp
Gas Line Insp
Insulation Insp
x Gyp Board Insp
orized Plumbing Contractor Signature
Call for inspection - 639 -4175
Contractor Notes:
jy y . V i k
13125 SW Hall Blvd. LNC
TIGARD K /BEET # � CITY ®F Tigard Oregon 97223
PERMIT # '175-1 -DSS
COMMUNITY DEVELOPMENT DEPARTMENT
(503) 639 -4171 DATE ISSUED
JOB ADDRESS : 1 2112 7 -Sr A) -- l/ di( c I - TAX MAP /LOT ?Si / 3 g j
SUB: 6 A5qUa LOT: • LAND USE:
VALUATION:
OWNER SPECIAL NOTES
NAME: W 1LKENS C()I.SS'C. REISSUE OF:
ADDRESS: 14531'1 SW FALLACY) LOOP LAST REISSUE:
AsLOFV\ OR 9r WrA FLOOD PLAIN/
PHONE: 1 ) / t ) SENSITIVE LAND:
CONTRACTOR APPROVALS REQUIRED
NAME: CQN 5 f IN) C.- PLANNING: S f /C.S - d /L SE t
ADDRESS: 1,"5 5"3 J'C
FALLIP1 Lam(' ENGINEERING: CM, mEtirS
�LO 1- O(L 91C09 FIRE DEPT:
PHONE: S x555 OTHER:
CONTR. BOARD #: S3 EXP DATE: (/51
ITEMS REQUIRED
SUBCONTRACTORS: •PLU B: PDUJ.4JCEO PLUhd1 JG LIST /SUBCONTRACTORS:
M 5K'( IkEAI N C BUS TAX:. • •
ARCH /ENGINEER CALCULATIONS:
NAME: MikSULAO TRUSS DETAILS:
ADDRESS: I515 N.W. 7_3 PAI . OTHER:
itki LAND Gib C l r2i0 ,, N - _-.� .f"7.st.
PHONE: ZZS ' ct LCD
PROPOSED BLDG. USE: NEW ° r1
COMMENTS : /9/1. 1 't3_ogifi.f
AppuNpvi- nuir_ A
;. roce - i s SSy.E.,6 . VU
G
APPLICANT SIGNATURE
Received By: � Date Received: /Z 77,7/- �3
PERMIT # ACCT # DESCRIPTION AMOUNT AMOUNT PD. BAL. DUE
p5 :57 10 -432 00 Building Permit Fees 16),50 y16S_ 51)
10 -431 00 Plumbing Permit Fees / 47 r- 5-7) b(7 ,5.1)
10 -431 01 Mechanical Permit Fees
10 -230 01 State Building Tax (5 %) 32,9/ —52-9/
Building .0 Z
Plumbing — 7,3r
Mechanical I(
• 10 -433 00 Plans Check Fee v /. � 3 7 63 ,r3
Building c_562 .5Y
Plumbing
Mechanical //• 1r/
// / P 10 -230 06 Fire
5 ,443 C2O 30 -202 00 Sewer Connection c - ' _2 2(>1)
30 -444 00 Sewer Inspection °s' 3
25- 448 -02 Commercial TIF Fees
25- 448 -04 Industrial TIF Fees
25- 448 -06 Institutional TIF Fees
25- 448 -03 Office TIF Fees
25- 448 -01 Residential Traffic Fees /41 O
25- 448 -05 Mass Transit TIF Fees /f U ff
52 -449 00 Parks System Dev Charge (PDC) 5d° /- ,,cd o
31 -450 00 Storm Drainage Syst Dev Chrg
(SSDC)
24- 445 -01 Water Quality (Fee in lieu of)
24- 445 -02 Water Quantity (Fee in lieu of)
TOTAL t 6/• 7(1 Z5� 3 7,/c(
nm /3587P.WPF ‘i�!�"
P
MATRIX • •
• "
Nomm.
:IEEE
DEVELOPMENT . •
CORPORATION • .
CERTIFICATE OF PAYMENT
Received from WICKENS CONSTRUCTION
the sum of $ 1,520.00 (check) for payment of the Traffic
Impact Fee on Lot • 4 CASTLE HILL I.
Present this receipt to the City of Tigard at the time you .
obtain a building permit.
October 6 • , 1993 MATRIX DEVELOPMENT CORP.
BY:
C- hia F . Wong
Hazelfem Road
egon 97224 -7771
3) 620-8080 _
598 -8900 matrix (ma'triks }, The s':; ring point; that which gives ctigin.to c vth!i ';
3/9/00 Activities for Case #: MST93 -00551
1:02:23 PM .
Assigned • Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA007 Application received 10/21/93 JLH PASS BLT 10/26/93
MSTA010 Plan check deposit paid 10/21/93 JLH PASS BLT 10/26/93 .
MSTA020 Plan check by . 10/26/93 10/26/93 RT PASS BLT 10/26/93
•
MSTA030 Check•for prd. restrict. 10/26/93. 10/26/93 VG BLT 10/26/93
MSTA705 Foot/found Insp 11/12/93 RB PPAS RB 11/17/93 PENDING FOOTING DRAIN;
SHEAR REQUIREMENTS.
MSTA710 Post/Beam Structural 11/22/93 RB PASS . RB 11/23/93 pending; gusset 3- posts, mud
• sill attachment @ garage
MSTA711 Post/Beam Mechanical • 11/22/93 RB PASS RB 11/23/93 flex duct facing Liden not .
completely hung yet.
MSTA717 PLM /Underfloor 11/22/93 MS PASS MRS 11/23/93 need co every 135 degree
change in direction
MSTA720 Mechanical Insp . 2/18/94 RB PASS RB 2/22/94 PENDING- EXHAUST
VENTING- PROPERLY SEAL
MSTA722 Plumb Top Out 2/15/94 GS APP GES 2/15/94
•
MSTA725 Framing Insp 2/18/94 RB FAIL RB 2/22/94 MECH ISSUE; LATERAL
BRACE GARAGE HEADER;
SHEAR BLOCKING; POSITIVE
CONNECTIONS; TUB
• BLOCKING; MAIN ENTRY
STUD BAYS BLOCKING; •
UNUSABLE SPACE
ENCLOSURE; STAIR
BLOCKING; FIRE - BLOCKING
AT SEPARATION
WALL/FIRESTOPPING; ATTIC
ACCESS- GARAGE;
MSTA735 Gas Line Insp 2/22/94 RB PASS • RB 2/22/94 #116481
MSTA740 Insulation Insp 3/3/94 RB PASS RB 3/3/94
MSTA745 Gyp Board Insp 3/14/94 RB PASS RB 3/16/94 PENDING -SEE REPORT
•
MSTA755 Rain drain Insp 11/24/93 MS PASS MRS 11/29/93
MSTA795 Mechanical Final 6/15/94 GS APP GES 6/15/94
MSTA797 Plumb Final 6/15/94 MS PASS MRS 6/16/94 need to know where dean -out
is?
MSTA799 Building Final • 6/15/94 GS DIS GES 6/15/94 LANDING REQ OUTSIDE
REAR DOOR 8 1/2" BELOW
THRESHOLD ELE FINAL
CANT GET CRAWL ACCESS
• OPEN MAINTAIN 6"
CLEARANCE SIDING TO '
GRADE
MSTA097 Issue plumbing signature form 11/5/93 JH 11/5/93
MSTA092 (F) Issue combination permit 11/5/93 JLH PASS JH 11/5/93 .
Page 1 of 2
3/9/00 Activities for Case • #: MST93 -00551
1:02:23 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
•
MSTA720 Mechanical Insp 2/22/94 RB FAIL RB 2/22/94 EXHAUST VENTING STILL
INCOMPLETE
MSTA726 Framing <REINSP> 3/3/94 RB PASS RB 3/3/94 . PENDING- METAL PLATE
PROTECTION OF PLUMBING
AT MASTER BATH. POSITIVE
• CONNECTION.
MSTA720 Mechanical Insp _ 3/3/94 RB • PASS RB 3/3/94
MSTA722 Plumb Top Out 3/3/94 RB PASS RB 3/3/94 PENDING ISSUES- OK.
MSTA765 Appr /Sdwlk Insp 3/30/94 LT PEND KE 4/5/94 1) Install drain line to existing
curb weep hole to west of
approach. 2) Extend drain line
to the existing curb weep hole
• on Liden. 3) Remove water
from approach before pouring.
4) Patch damaged curb on •
• Liden. 5) Be prepared to protect
finish. 6) Extend ramp out as
marked.
MSTA799 Building Final 6/28/94 WEW PASS RB 6/28/94 Pending: Maintain 6" clearance
from bottom of siding to earth.
MSTA795 Mechanical Final 10/11/94 RB FAIL RB 10/11/94 LOCKED- UNABLE TO
INSPECT.
MSTA735 Gas Line Insp 10/12/94 GS APP GES 10/12/94 GAS LINE TO GAS RANGE
ONLY
MSTA970 Case Finaled 9/28/95 GES 9/28/95
• MSTA960 (F) Issue Cert. of Occupancy 6/15/94 JF JF 10/20/95 printed 10/20/95
•
•
•
• Page2of2 .
INSPECTION NOTICE �- 77Pi
City of Tigard Building Department
13125 SW Ball Blvd. Tigard, Oregon 97223
Inspection Line (Rec-O- Phone): 639 -4175 Business Phone: 639-4171
re
Inspection: re- (A % r � � (�{y� ' l
Footing Plbg. Underslab Mech. Rough -in Appr /Sdwlk
Found. Plbg. Top Out Gas Line 4011°
Post /Beam Struct. San. Sewer Framing
Post /Beam Mech. Rain Drain Insulation - Plumb.
Plbg. Underfloor Water Line / Gyp. Bd. -Mech.
(p
Date Requested: (51-4.../ )- ir- ` g C/ Time: AM PM
Address: I /027 d(451 64. Perini q / 3 055 J
Builder: / k / l5 ,9/- /.33
THE FOLLOWING CORRECTIONS ARE REQUIRED: 70 / - e/6 7
p Wm b pasj e ci ( - / 5- 9 V ms
Y1e_c- , ,pc,5, ci -/5-9s / 9
£ za,. 3 — 4 K7
w . /'�� I / _ .. . -.1 I -I AL.-. .�. e I/I AVM 40! IL /A
f oda .0 , 96 eig,4441L. /
Inspector • Date: 6 • c•
APPROVED DISAPPROVED ✓ APPROVED SUBJECT TO ABOVE
Call For Reinsp.
INSPECTION NOTICE
City of Tigard Wuilding Department
13125 SW Hall Blvd. Tigard, Oregon 97223
Inspection Line (Rec- O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Plbg. Underelab Mech. Rough -in Appr /Sdwlk
Found. Plbg. Top Out Gas Line
Poet /Beam Struct. San. Sewer Framing -Bldg.
Post /Beam Mech. Rain Drain Insulation - Plumb.
Plbg. Underfloor Water Line Gyp. Bd.
/ - Mech.
Date Requested: ( / / 5 ,, � // ' C Time: AM PM
Address: /'/ / "� ( V/ w /1 � 7� . Per ci 3-O5 5 /
Builder: /u) k ei/7.s `ao-)5 G /�'' /O p mit 33/ 70 / G / - 9677
77 .
THE
� CORRECTIONS ARE REQUIRED:
r b
a ie„......„)t_ 2 _ 4 1' CAA -4.40P - -
e e jot Inspector: 4 Date: 4- / V F7
APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
Call For Reinep.
- INSPECTION NOTIC ?�v V
City of Tigard' uilding Department
13125 SW Hall Blvd. Tigard, Oregon 97223
Inspection Line (Rec- O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Plbg. Underslab Mech. Rough -in Appr /Sdwlk
Found. Plbg. Top Out Gas Line FINAL:
Post /Beam Struct. San. Sewer Framing -Bldg.
Post /Beam Mech. Rain Drain Insulation
Plbg. Underfloor Water Line Gyp. Bd. -Mech.
Data Requested: J (0 - /5Z 9 g / /' , Tiimme: AM PM
Address: f 7 / C) -7 ( 5�c iw C.C.45 /' L / • Permit i s 93 055/
Builder: 0; /Len.? (! J) 44. 59/- / / P33 CS - Y'
THE FOLLOWING CORRECTIONS ARE REQUIRED: �/ y 7
-445
Inspect° Date:
PROVED DISAPPROVED / PROVED SUBJECT TO ABOVE
Call For Reinsp.