Tualatin, Oregon 97062 FIELD OBSERVATION REPORT Northwest GEO
Tel (503) 702 8437
nwgeoconsultants@frontier.com Consultants, LLC
mnrcrr rn
DATE eCO^eT "^
Alpine View August 17. 2012
MIMI= n MUT nwuco rrr rM ocooccnlrAtnte nAv ?NC WM/ DACC
D R Horton (DHI) Reed Couch Friday 1 of 1
GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME
DHI Don Durst 0945 1015
GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/ TEMPERATURE PERMIT
Ray Elwess Sunny, 80°F
TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL NGC REPRESENTATIVE
Footing Subgrade NA Brad Hupy, PE, GE
LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE
Lots 21 & 22 Mid Size Trackhoe
CONTRACTOR ACTIVTTY, OBSERVATIONS, CONCWSIONS. RECOMMENDATIONS:
I made this site visit as requested by Don Durst to observe the conditions of subgrade for single family homes
that will be constructed on Lots 21 and 22. I spoke with Mr. Durst over the phone.
At the time of my visit, the contractor had excavated lots 21 to 22 to subgrade elevations. The contractor was in
the process of placing forms within lot 21. I observed and probed the subgrade using a 1/2-inch diameter steel
foundation probe. The subgrade in the front of the lot consists of very stiff to hard residual soil (silt /clay).
Based on observation and probing, the subgrade excavations have been prepared in general conformance with
the project specifications and my recommendations and will perform as intended to support single family home
foundations. The areas are ready for placement of footing forms and reinforcement.
•
•
•
A Preliminary report Is provided solely as evidence that the field observation was performed. Observations, and /or conclusions, and /or
® FINAL 0 PRELIMINARY recommendations conveyed In the final report may vary from and shall take precedence over those indicated In a preliminary report. A final
report Is an Instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the
ITEMS TO OBSERVE. CHECK, OR TEST DURING NEKT VISIT . .
/
FIELD REP' s• ENTATIVE S` IMPURE DATE
PACk 1 —fir �„C1 141)10 8/2 V20(2/
NGC's pr. ., , . re • presented on sire solely to observe operations of the contractor Identified, to form opinions about the adeq W of those operations, and to report those opinions
to our dient. The presence and activities of our field representative do not relieve any contractor from Its obligation to meet contractual requirements. We rely on the contractor to comply
with the plans and specifications throughout the duration of the project. Irrespective of the presence of our representative. The contractor retains sole responsibility for site safety and the
methods, operations, and sequences of construction.
057 °0- - gird-..
NZ' 7. s' 41 PI,) t Vfl
HUB AND TACK
ENVELOPE CORNERS
1 , I
i4- _ 1 1
E T - Vo it -
o l
L Ito v)c, _ � `„ l oo
1 E ° \I
)II( : 1 t , ( .. c .. ,
E r 20576 20575 f
F.
I I 'llll I • 7
I
;.; . F-119_ 3 Asimei 1 1
,.
L L gii'-______ i : 20577 ' 20574-
1084
5
I
0
4
I
z . AIL - 1
1 N 9
101 -026 - ALPINE VIEW
(.. SCALE
40 0 20 40
=I EN NM NE
1 INCH = 40 FEET