Loading...
Report i IMS7"go /r,2 - eo /e ' V 97 f'11/ 6915 SW Nyberg - P104 Tualatin, Oregon 97062 FIELD OBSERVATION REPORT Northwest GEO Tel (503) 702 8437 nwgeoconsultants@frontier.com Consultants, LLC mnrcrr rn DATE eCO^eT "^ Alpine View August 17. 2012 MIMI= n MUT nwuco rrr rM ocooccnlrAtnte nAv ?NC WM/ DACC D R Horton (DHI) Reed Couch Friday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Don Durst 0945 1015 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/ TEMPERATURE PERMIT Ray Elwess Sunny, 80°F TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL NGC REPRESENTATIVE Footing Subgrade NA Brad Hupy, PE, GE LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lots 21 & 22 Mid Size Trackhoe CONTRACTOR ACTIVTTY, OBSERVATIONS, CONCWSIONS. RECOMMENDATIONS: I made this site visit as requested by Don Durst to observe the conditions of subgrade for single family homes that will be constructed on Lots 21 and 22. I spoke with Mr. Durst over the phone. At the time of my visit, the contractor had excavated lots 21 to 22 to subgrade elevations. The contractor was in the process of placing forms within lot 21. I observed and probed the subgrade using a 1/2-inch diameter steel foundation probe. The subgrade in the front of the lot consists of very stiff to hard residual soil (silt /clay). Based on observation and probing, the subgrade excavations have been prepared in general conformance with the project specifications and my recommendations and will perform as intended to support single family home foundations. The areas are ready for placement of footing forms and reinforcement. • • • A Preliminary report Is provided solely as evidence that the field observation was performed. Observations, and /or conclusions, and /or ® FINAL 0 PRELIMINARY recommendations conveyed In the final report may vary from and shall take precedence over those indicated In a preliminary report. A final report Is an Instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the ITEMS TO OBSERVE. CHECK, OR TEST DURING NEKT VISIT . . / FIELD REP' s• ENTATIVE S` IMPURE DATE PACk 1 —fir �„C1 141)10 8/2 V20(2/ NGC's pr. ., , . re • presented on sire solely to observe operations of the contractor Identified, to form opinions about the adeq W of those operations, and to report those opinions to our dient. The presence and activities of our field representative do not relieve any contractor from Its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and specifications throughout the duration of the project. Irrespective of the presence of our representative. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction. 057 °0- - gird-.. NZ' 7. s' 41 PI,) t Vfl HUB AND TACK ENVELOPE CORNERS 1 , I i4- _ 1 1 E T - Vo it - o l L Ito v)c, _ � `„ l oo 1 E ° \I )II( : 1 t , ( .. c .. , E r 20576 20575 f F. I I 'llll I • 7 I ;.; . F-119_ 3 Asimei 1 1 ,. L L gii'-______ i : 20577 ' 20574- 1084 5 I 0 4 I z . AIL - 1 1 N 9 101 -026 - ALPINE VIEW (.. SCALE 40 0 20 40 =I EN NM NE 1 INCH = 40 FEET