Permit Support Document CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175 Ott 33
INSPECTION DIVISION Business Line: (503) 639 -4171
BUP
Received ' - Z � Z Date Requested Z 23 PM BUP
Location r r _ Suite MEC -
Contact Person ' Ph ) PLM
Contractor Ph ( 5 &3 'Y ea zacPSWR
BUILDING Tenar (Ownlb /I -A■ ELC
Footing — '2 1 G 2_F 7� ELC
Foundation Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: C � I �� � � - � n SIT •
Post & Beam /`'
Shear Anchors
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Fire wall 0 S c
Fire Sprinkler
Fire Alarm
Susp'd Ceiling / e—e et L_ - - Roof
• I
) PART FAIL
ING
Post & Beam
Under Slab ,-?
Rough -In
Water Service
Rain Drains r
Rain 4 ?
in Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
/0_411.-4 Ce PART FAIL _
p ; -
• HANICAL
Post & Beam i
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
Low Voltage
Fire Alarm
Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE ❑ Please call for reinspection RE: El Unable to inspect - no access
Fire Supply Line
ADA
Approach/Sidewalk Date r Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL