Report Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 684-0954 FAX (503) 589 -1309
September 20, 1999
99- 2872.CTI
Permit No. BUP1999 -00348
FIELD INSPECTION REPORT
DATES COVERED: September 16, 1999
PROJECT: Air Touch Cellular — Sequoia
ADDRESS: 15575 SW Sequoia Pkwy, St- ; i — Tigard, OR
INSPECTOR: G. Seamster
09- 16 -99: CTI representative was onsite for periodic inspection of structural steel, bolting and welding. The
following was noted:
1. Performed visual inspection of base plates and cap plates to tube steel columns (2), beam to beam clips,
and (2) beam braces. All welding appears to conform to details and AWS D1.1.
2. Verified all bolted connections were completed and tightened to a snug tight condition per engineer (see
attached). --
3. Reviewed welder certificates for Mike Case SSN #532 -92 -3787 and Darrel Kelm. Also verified material
certificates for steel used.
Weld procedures, welder qualifications, base plates and bolts tested were reviewed and materials were
verified.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTIN , INC.
P$IAENT
Douglas W. Leach
President
GS /Ijm
Attachment
cc: Argo Railing — Daryl Kelm
City of Tigard Building Dept
VLMK
99- 2872.fr
el' 7PM i ET1G lil
:r r4.Y
.t` .,.ulting E ngineers P.
3933 SW KELLY AVENUE, PORTLAND, OREGON 97201.4393
I (503) 222.4453 / FAX (503) 248 -92631 vlmk ® vimk.com
PRINCIPALS •
ALFRED H. VAN 0O4MELEN. P.E. •
JAMES E. KNAJF, RE
GREIIORY J. BLEFGEN, PE
JOHN T. BROOKS
MAKIN G. KEMP, P.E.
September 15, 1999 KIMBERLY A.SGNOENFELDER •
MEMORANDUM
TO: Daryl Kelm; Argo Safety Railing
FROM: Kevin M. Kaplan, P. E. Virg -
•
RE: Air Touch Cellular
Daryl:
As per our conversations, the structural bolted connections and wedge anchors for the
above mentioned project are not required to be tension tested. Snug tight connections are
acceptable with all bolted connections.
Additionally, per our conversations, you indicated that you have tightened the structural
bolts and wedge anchor bolts to 325 ft lbs. and 175 ft. lbs. respectively. This condition is
acceptable as installed.
Please contact me should you have any questions, comments, and/or concerns or need
additional information.
...1
- I
Cc: Ron Preston; Soderstrom Architects
•
KMIC:kmk