Loading...
Report Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 684-0954 FAX (503) 589 -1309 September 20, 1999 99- 2872.CTI Permit No. BUP1999 -00348 FIELD INSPECTION REPORT DATES COVERED: September 16, 1999 PROJECT: Air Touch Cellular — Sequoia ADDRESS: 15575 SW Sequoia Pkwy, St- ; i — Tigard, OR INSPECTOR: G. Seamster 09- 16 -99: CTI representative was onsite for periodic inspection of structural steel, bolting and welding. The following was noted: 1. Performed visual inspection of base plates and cap plates to tube steel columns (2), beam to beam clips, and (2) beam braces. All welding appears to conform to details and AWS D1.1. 2. Verified all bolted connections were completed and tightened to a snug tight condition per engineer (see attached). -- 3. Reviewed welder certificates for Mike Case SSN #532 -92 -3787 and Darrel Kelm. Also verified material certificates for steel used. Weld procedures, welder qualifications, base plates and bolts tested were reviewed and materials were verified. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTIN , INC. P$IAENT Douglas W. Leach President GS /Ijm Attachment cc: Argo Railing — Daryl Kelm City of Tigard Building Dept VLMK 99- 2872.fr el' 7PM i ET1G lil :r r4.Y .t` .,.ulting E ngineers P. 3933 SW KELLY AVENUE, PORTLAND, OREGON 97201.4393 I (503) 222.4453 / FAX (503) 248 -92631 vlmk ® vimk.com PRINCIPALS • ALFRED H. VAN 0O4MELEN. P.E. • JAMES E. KNAJF, RE GREIIORY J. BLEFGEN, PE JOHN T. BROOKS MAKIN G. KEMP, P.E. September 15, 1999 KIMBERLY A.SGNOENFELDER • MEMORANDUM TO: Daryl Kelm; Argo Safety Railing FROM: Kevin M. Kaplan, P. E. Virg - • RE: Air Touch Cellular Daryl: As per our conversations, the structural bolted connections and wedge anchors for the above mentioned project are not required to be tension tested. Snug tight connections are acceptable with all bolted connections. Additionally, per our conversations, you indicated that you have tightened the structural bolts and wedge anchor bolts to 325 ft lbs. and 175 ft. lbs. respectively. This condition is acceptable as installed. Please contact me should you have any questions, comments, and/or concerns or need additional information. ...1 - I Cc: Ron Preston; Soderstrom Architects • KMIC:kmk 1 • 41 • -•i .M1 + F:1Completed Proj.cts199241199241 Memo 1.0oc MEMBER •