Permit CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: 5-/g- A.M. P.M. MST:
Location: / 51 I ,V , (A) f ( BUP:
Tenant: l , Suite:/ Bldg: MEC:
Contractor: , _ / ./J . /. , , I f1 //I, Phone: PLM: l 6-011,6
Owner Phone: ELC:
C CCL � e.LJ11L: ■ /!A 0. 1 !!
/L _I ._' (I A ELR:
�" SIT:
C
BUILDING BLDG (con't) PLUMBI�i ) MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall
Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
ka Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved • 1 • ved • Approved Approved Approved
Appr /Sdwlk Not Approved . _ 61111. ed Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL FINAL
i
/ grog i __� � L it. ±1
1 e
/iod/5 /X ��- spEcTE� /v4/, ce/ A 4/
•i, I r v p 6 Z3
O Call for y O Reinspection fee of $ required before next inspection 0 Unable to inspect
Inspector: 4 Date: ( //1/ /g Page of