Permit CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour
Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: -5-18-9? A.M. P.M. MST:
Location: / 5/ 5 A ) 4 Pk V BUP:
Tenant: ./ : _ i f� L�_ i� J . � Suite: CID Bldg: MEC:
Contractor: � r Phone: 33 . --5te 3-, PLM:
Owner: Phone: ELC:
ELR: C A) OoL..J C
/
SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL , 1 SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab_
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump .w Volt ir ,/ A�S
Approved Approved Approved Approved Approved
Appr /Sdwlk Not Approved Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL ' . 1 ' 1 FINAL
�� glec
---------
er--
O Call for rein , O Reinspection fee of $ required before next inspection O Unable to inspect
Inspector: �I�� � !"u Date: ,5 - /P - 9 ? Page of