Loading...
Permit CITY OF TIGARD BUILDING PERMIT _ COMMUNITY DEVELOPMENT Permit #: BUP2012 00159 T [ G ARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 08/09/2012 Parcel': 25101 DD00800 Jurisdiction: Tigard Site address: 14020 SW 72ND AVE Project: United Rental Subdivision: SALEM FREEWAY SUBDIVISION Lot: 4 Project Description: Remodel existing showroom into offices Contractor: LMC INC Owner: I S PROPERTIES LP 8324 SW NIMBUS ATTN: UNITED RENTALS LEASE ADMIN BEAVERTON, OR 97008 BY FISCHER & COMPANY URI 13455 NOEL RD, STE 1900 DALLAS, TX 75240 PHONE: 503 -646 -0521 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review, COM TI - Ping 08/09/2012 $167.00 Occupancy Grp: B Occupancy Load: DC Provision Review, COM TI - LRP 08/09/2012 $25.00 Dwelling Units: 0 Permit Fee - Additions, Alterations, 08/09/2012 $1,105.95 Demolition Stories: 2 Height: 0 ft 12% State Surcharge - Building 08/09/2012 $132.71 Bedrooms: 0 Bathrooms: 0 Plan Review 08/09/2012 $718.87 Value: $100,000 Plan Review - Fire Life Safety 08/09/2012 $442.38 Info Process /Archiving - Sm $0.50 (up to 08/09/2012 $3.00 11x17) Floor Areas: Metro Const. Excise Tax - Commercial 08/09/2012 $120.00 Use Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,714.91 Required: Required Items and Reports (Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Co ; • and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of iss • - = or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Not�catioI 4 nter. Those rules are set forth in OAR 952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 �j� 987 or 1.800.332.2344. / jklitilii Issued By: Permittee Signature: 0 Call 503.639.4176 by 7:00 a.m. for the next available Inspection d This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the Job site at the time of each Inspection. • Building Permit Application Commercial RECEIVED FOR OFFICE USE ONLY Cl of Tigard Received Permit N / ermo.: ,/► ,,h City g Date/B _ ► _ ' pt(/ /. 1111 9 13125 S W Hall Blvd., Tigard, OR 97223 A U G 0 9 2012 Plan Revie j�Il• 19 6 4 li Phone: 503.718.2439 Fax: 503.598.1960 Did Date/By: // lir - 1 l / ' er Permit: - I - I G A It u Inspection Line: 503.639.4175 CITY OF Date Rea. •': ": Juri El See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISION Notified/Method 4 Supplemental Information TYPE OF WORK VH t� REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El 1- and 2- family dwelling Z Commercial /industrial Valuation: $ El Accessory building 11 Multi-family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 14020 SW 72" Ave. New dwelling area: square feet City /State /ZIP: Tigard, Oregon Garage /carport area: square feet Suite/bldg. /apt. no.: Project name: United Rental T. I. Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Remodel existing showroom into offices. Valuation: $$100,000.00 Existing building area: square feet New building area: square feet ® PROPERTY OWNER ❑ TENANT Number of stories: Name: Type of construction: IIIB / VB Address: Occupancy groups: City /State /ZIP: Existing: B, Fl, SI Phone: ( ) Fax: ( ) New: B, Fl, SI ® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: LMC Construction (Please refer ro fee schedule) Structural plan review fee (or deposit): Contact name: Richard Ray FLS plan review fee (if applicable): Address: 8324 SW Nimbus Ave. Total fees due upon application: City /State /ZIP: Beaverton, Oregon 97008 Phone: (503) 646 -0521 Fax: : (503) 646 -6823 Amount received: E -mail: richardr@lmcincorporated.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof -top mounted Photo Voltaic Solar Panel System. Business name: LMC Construction Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: 8324 SW Nimbus Ave. Solar Installation Specialty Code checklist. City/State /ZIP: Beaverton, Oregon 97008 Permit fee (includes plan revi $180.00 and administrative fees): Phone: (503) 646 -0521 Fax: (503) 646 -6823 State surcharge (12% of permit fee): $21.60 CCB lie.: 161282 Ai '� I Total fee due upon application: $201.60 Authorized signature: � This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: I Gt4QU �e Date: * Fee methodology set by Tri -County Building Industry f"`� 8� 9II7� Service Board. I:\Building\PermitslBUP -COM PermitApp.doc 02/24/2011 440 -4613T(11 /02 /COM/WEB) 0 Building Division . Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ L:\ Building \Permits \BUP -COM PermitApp.doc 03/03/2011 .111 ° Building Division Plan Submittal Requirements T G A R D Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I:\ Building \Permits \BUP -COM PermitApp.doc 03/03/2011 Ph 0 . _:: Building Division Plan Submittal Requirement Matrix T I G A R D Commercial & Multi- Family - New, Additions or Alterations Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue), if applicable. I: \Building \Permits \BUP -COM PemvtApp.doc 03/03/2011 Commercial Application Checklist RECEIVED City of Tigard AUG 0 9 2012 111 ' 13125 SW Hall Blvd., Tigard, OR 97223 CjTy OF'j'd(1ARp Phone: 503.718.2439, Fax: 503.598.1960 BUILDIr,•G DI T I G^ R D Internet address: www.tigard - or.gov U�� oi\ *T PROJECT INFORMATION Project name: United Rental T.I. Date: Address: 14020 SW 72nd Ave. City: Tigard State: Or ZIP: 97223 Scope of work: Remodel existing showroom into offices Reference no.: Map and tax -lot no.: Contact person name: Richard Ray Company: LMC Construction Phone: 503 - 646 -0521 Fax: 503 - 646 -6823 Cellular phone: 503 - 915 -7215 E -mail: richardr @lmcincorporated.com NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each sro'ect submitted. PRE- SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and II 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /O1/WEB /COM) I:\Building \Forms \COM- Checklist.doc 08/08/12 SECTION 1.0 — GENERAL PROJECT DATA Construction documents Location (sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: 2 1.2 ® Required Cover sheet title block 1.3 ® Required Cover sheet vicinity map 1.4 ® Required Cover sheet plan index 1.5 ❑ P ❑ NA Code summary 1.6 ❑ P ❑ NA Deferred submittal summary 1.7 ❑ P ❑ NA Professional stamp and signature 1.8 ❑ P ❑ NA Fire and life- safety plan 1.9 ❑ P ❑ NA Landscape plan 1.10 ❑ P ❑ NA Landscape specifications Supporting documents Notes 1.20 ❑ P ❑ NA Land -use or planning actions 1.21 ❑ P ❑ NA Required fire -flow calculations 1.22 ❑ P ❑ NA Fire - hydrant flow -test report 1.23 ❑ P ❑ NA Fire department or fire district building survey report 1.24 ❑ P ❑ NA Material safety data sheets (MSDS) SECTION 2.0 — CIVIL DATA Construction documents Location (sheet number or spec section) • 2.1 ® Required Site plan 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Required Erosion - control plan 2.5 ❑ P ❑ NA Utility -vault location and details Supporting documents Notes 2.20 El P El NA Geotechnical/soil engineer report 2.21 ❑ P ❑ NA Storm -water calculations 2.22 ❑ P El NA Site retaining -wall structural calculations 2.23 ❑ P El NA "Assurance of Compliance" with environmental rules .... 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\ Building \Forms \COM- Checkl i st. doc SECTION 3.0 — ARCHITECTURAL DATA Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) 3.2 ® Required Transverse and longitudinal cross sections 3.3 ® Required OSSC Chapter 11 accessibility requirements 3.4 ❑ P ❑ NA Interior elevations 3.5 El P El NA Exterior elevations 3.6 El P El NA Roof plans 3.7 El P El NA Exterior wall sections and details 3.8 El P El NA Reflected ceiling plan(s) 3.9 ❑ P El NA Fire -rated construction details 3.10 El P El NA Energy code compliant construction details and specifications 3.11 El P ❑ NA Door schedule 3.12 El P El NA Glazing schedule 3.13 El P El NA Furniture plan Supporting documents Notes 3.20 El P El NA Energy code compliance forms /calculations 3.21 El P El NA Material safety data sheets (MSDS) 3.22 El P El NA Hazardous materials inventory statement (HMIS) 3.23 El P El NA Hazardous materials management plan (HMMP) 3.24 El P El NA Written fire and life- safety evacuation plan for area of rescue assistance 3.25 El P El NA Active and passive smoke - control information 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checklist.doc SECTION 4.0 — STRUCTURAL DATA Construction documents Location (sheet number or spec section) 4.1 ® Required Structural cover sheet 4.2 ❑ P ❑ NA Foundation plan 4.3 ❑ P ❑ NA Under -slab mechanical plan 4.4 ❑ P ❑ NA Under -slab electrical plan 4.5 ❑ P ❑ NA Under -slab plumbing plan 4.6 ❑ P ❑ NA Floor framing plan 4.7 ❑ P ❑ NA Roof framing plan 4.8 ❑ P ❑ NA Structural elevations 4.9 ❑ P ❑ NA Structural details and cross sections 4.10 ❑ P ❑ NA Standpipe information 4.11 ❑ P ❑ NA Special inspector /structural observation matrix Supporting documents Notes 4.20 ❑ P ❑ NA Geotechnical /soil engineer report 4.21 ❑ P ❑ NA Site - specific seismic hazard report 4.22 ❑ P ❑ NA Design narrative 4.23 ❑ P El NA Structural calculations 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties l:\Bui (ding \Forms \COM- Checklist.doc SECTION 5.0 — MECHANICAL DATA (New construction, tenant improvement, gas piping permits) Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan 5.2 ® Required Equipment schedule 5.3 ❑ P ❑ NA Site plan 5.4 ❑ P ❑ NA Under -slab mechanical plan 5.5 ❑ P ❑ NA Roof plan 5.6 ❑ P ❑ NA Fuel gas piping plan 5.7 ❑ P ❑ NA HVAC equipment and duct plan(s) 5.8 ❑ P ❑ NA Roof access details 5.9 ❑ P ❑ NA Duct smoke detector plans 5.10 ❑ P ❑ NA Fire /smoke damper locations 5.11 ❑ P ❑ NA Smoke control plan 5.12 ❑ P ❑ NA Outside air (OSA) table 5.13 ❑ P ❑ NA Refrigeration equipment and piping plan 5.14 ❑ P ❑ NA Kitchen equipment plan 5.15 ❑ P ❑ NA Type I and/or Type II kitchen hood plan (see Section 7.0 — Mechanical Data) 5.16 ❑ P ❑ NA Fume /vapor hood plan 5.17 ❑ P ❑ NA Process piping/product and/or exhaust- conveying duct plan 5.18 ❑ P ❑ NA Fire -rated construction details 5.19 ❑ P ❑ NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ❑ NA Outside air (OSA) calculations 5.23 ❑ P ❑ NA Smoke - control calculations 5.24 ❑ P ❑ NA Combustion air calculations 5.25 ❑ P ❑ NA Fuel gas piping sizing calculations 5.26 ❑ P ❑ NA Make -up air calculations 5.27 ❑ P ❑ NA Energy code compliance forms 5.28 ❑ P ❑ NA Boiler information 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms \COM- Checkl ist.doc SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits) Construction documents Location (sheet number or spec section) 6.1 ® Required Roof plan 6.2 ❑ P ❑ NA Roof framing plan 6.3 ❑ P ❑ NA Fuel gas piping plan 6.4 ❑ P ❑ NA Roof access details Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P ❑ NA Fuel gas piping sizing calculations 6.23 ❑ P ❑ NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (Ty ie I and Ty )c II kitchen hood )ermits) Construction documents Location (sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 ® Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations 7.5 ❑ P ❑ NA Roof plan 7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ❑ NA Fire -rated construction details 7.8 ❑ P ❑ NA Fire suppression details Supporting documents Notes 7.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make -up air calculations 7.22 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P ❑ NA Hood/grease extractor listing documentation 7.24 ❑ P ❑ NA Hood/grease duct sizing calculations 7.25 ❑ P ❑ NA Fire suppression information 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Bu i Id ing \Forms \COM- Checklist.doc SECTION 8.0 — I LUMI3ING DATA Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P ❑ NA Site utility plan 8.6 ❑ P ❑ NA Building cross section 8.7 ❑ P ❑ NA Rise diagram 8.8 ❑ P ❑ NA Roof plan 8.9 ❑ P ❑ NA Back flow prevention location 8.10 ❑ P ❑ NA Irrigation plan 8.11 ❑ P ❑ NA Fire -rated construction details 8.12 ❑ P ❑ NA Under -slab plumbing plan Supporting documents Notes 8.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 8.22 ❑ P ❑ NA Utility maintenance agreements 8.23 ❑ P ❑ NA Water supply calculations 8.24 ❑ P ❑ NA Sanitary system calculations 8.25 ❑ P ❑ NA Irrigation demand calculations 8.26 ❑ P ❑ NA Roof drain and storm water calculations 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:1Bu i Iding \Forms \COM- Checkl ist.doc SECTION 9.0 — ELECTRICAL DATA Construction documents Location (sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) 9.3 ® Required Electrical load calculations 9.4 ® Required One line diagram 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information 9.7 ® Required Panel schedule(s) 9.8 ❑ P ❑ NA Site electrical plan 9.9 ❑ P ❑ NA Fire -rated construction details 9.10 ❑ P ❑ NA Lighting plan 9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan 9.12 ❑ P ❑ NA Under -slab electrical plan Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ❑ P ❑ NA Energy code compliance forms and calculations for lighting 9.22 ❑ P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog "cut sheets" or specifications 440 - 2734 (8 /OI/WEB /COM) Tri -County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\ Bu ilding \Forms \COM- Checkl ist.doc SECTION 10.0 - FIRE SUPPRESSION DATA Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P El NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information 10.6 El P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P El NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire -rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 11.0 - FIRE DETECTION AND ALARM DATA Construction documents Location (sheet number or spec section) 11.1 ZRequired Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 ❑ P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 El P ❑ NA Voltage drop calculations 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\BuildingWorms\COM-Checklistdoc SECTION 12.0 — RE -ROOF INSTALLATION DATA Construction documents Location (sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS Construction documents Item Location (sheet number or spec section) 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ['Required 13.4 ❑ P ❑ NA ['Required 13.5 ❑ P ❑ NA ❑ Required 13.6 ❑ P ❑ NA ❑ Required 13.7 ❑ P ❑ NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Building\Forms \COM- Checkl ist.doc o ° Building Division Over - The - Counter (OTC) Building Permit TIGARD Check List Project Description: T Pc)-6 —&d i ' APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION *Class of Work: Occupancy Group: Type of Construction: *Type of Use: (tAA Occupancy Load: Oregon Specialty Code: , "7-010 SPECIFICS Number of Stories: ?/ Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: _ Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: _ Mezzanine: SETBACKS Sideyard Setback — Left Sideyard Setback — Front Sideyard Setback — Right Sideyard Setback — Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: /W Fire Alarms: Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: Total Project Valuation: $ 100 FEES DUE $ ((p7, QQ DC Prov Rvw, COM TI — Ping $ 2 5') DC Prov Rvw, COM TI — LRP DC Provision Review Fee for COM TI $ Q° . " '5 Fee — Add, Alt, Demo Project Valuation Planning LRP $ Z , 7 12% State Surcharge Up to $4,999 $0.00 $0.00 $ ' , Plan Review, Structural $5,000 - $74,999 $67.00 $10.00 $ , 1. Plan Review, Fire Life Safety $75,000 - $149,999 $167.00 $25.00 $ Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $268.00 $39.00 $ 3 . pQ Info Proc /Arch, Sm (up to 11x17 $0.50) $ 20 CO Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc. Admin Fee Permit Coordinator: $ Other: $ Other: Building Staff: $ Other: Date /Time: $ 2.74 (( TOTAL FEES DUE *OPTIONS: TYPE OF USE: COM = commercial; CMS = commercial manufactured structure. CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; FND = foundation; DEM = demo; END = foundation; FPS = fire protection system; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies); REP = repair. I: \Building \Forms \OTC - BUP.docx 07/01/2012 1 o ° Building Division Development Code Provision Review T I G A R D Commercial Projects - No Associated Land Use Case Building Permit No: A up 40 ►A- ()b l5 ❑ Expedited Review Plan Submittal Date: To the Applicant: > If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. > If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Planning Review (contact 34 / /ayl at 503 -718- i 2 . or JOoh 1C7 @tigard - or.gov) ❑ Zoning -L'-- Permitted Use Yes tl No ❑ ❑ Land Use Required: Yes ❑ No '$l (explain below) Notes: A% 04 ha , /c in Ul C. IX Approved ❑ Not Approved Date: 9 2c9L Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert @tigard - or.gov) Notes: Routed back to Building Division Date: • I: \CURPLN