Permit CITY OF TIGARD BUILDING PERMIT
_ COMMUNITY DEVELOPMENT Permit #: BUP2012 00159
T [ G ARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 08/09/2012
Parcel': 25101 DD00800
Jurisdiction: Tigard
Site address: 14020 SW 72ND AVE
Project: United Rental Subdivision: SALEM FREEWAY SUBDIVISION Lot: 4
Project Description: Remodel existing showroom into offices
Contractor: LMC INC Owner: I S PROPERTIES LP
8324 SW NIMBUS ATTN: UNITED RENTALS LEASE ADMIN
BEAVERTON, OR 97008 BY FISCHER & COMPANY URI
13455 NOEL RD, STE 1900
DALLAS, TX 75240
PHONE: 503 -646 -0521 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB DC Provision Review, COM TI - Ping 08/09/2012 $167.00
Occupancy Grp: B Occupancy Load: DC Provision Review, COM TI - LRP 08/09/2012 $25.00
Dwelling Units: 0 Permit Fee - Additions, Alterations, 08/09/2012 $1,105.95
Demolition
Stories: 2 Height: 0 ft 12% State Surcharge - Building 08/09/2012 $132.71
Bedrooms: 0 Bathrooms: 0 Plan Review 08/09/2012 $718.87
Value: $100,000 Plan Review - Fire Life Safety 08/09/2012 $442.38
Info Process /Archiving - Sm $0.50 (up to 08/09/2012 $3.00
11x17)
Floor Areas: Metro Const. Excise Tax - Commercial 08/09/2012 $120.00
Use
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,714.91
Required: Required Items and Reports (Conditions)
Fire Sprinkler: No Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Co ; • and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of iss • - = or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Not�catioI 4 nter. Those rules are set forth in OAR
952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 �j� 987 or 1.800.332.2344. / jklitilii Issued By: Permittee Signature: 0
Call 503.639.4176 by 7:00 a.m. for the next available Inspection d
This permit card shall be kept in a conspicuous place on the Job site until completion of the project.
Approved plans are required on the Job site at the time of each Inspection.
•
Building Permit Application
Commercial RECEIVED FOR OFFICE USE ONLY
Cl of Tigard Received
Permit N
/ ermo.: ,/► ,,h
City g Date/B _ ► _ ' pt(/ /.
1111
9 13125 S W Hall Blvd., Tigard, OR 97223 A U G 0 9 2012 Plan Revie j�Il• 19 6 4
li Phone: 503.718.2439 Fax: 503.598.1960 Did Date/By: // lir - 1 l / ' er Permit:
- I - I G A It u Inspection Line: 503.639.4175 CITY OF Date Rea. •': ": Juri El See Page 2 for
Internet: www.tigard-or.gov
BUILDING DIVISION Notified/Method 4 Supplemental Information
TYPE OF WORK VH t� REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
El 1- and 2- family dwelling Z Commercial /industrial Valuation: $
El Accessory building 11 Multi-family Number of bedrooms:
❑ Master builder ❑ Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 14020 SW 72" Ave. New dwelling area: square feet
City /State /ZIP: Tigard, Oregon Garage /carport area: square feet
Suite/bldg. /apt. no.: Project name: United Rental T. I. Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL -USE CHECKLIST
Subdivision: Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Remodel existing showroom into offices. Valuation: $$100,000.00
Existing building area: square feet
New building area: square feet
® PROPERTY OWNER ❑ TENANT Number of stories:
Name: Type of construction: IIIB / VB
Address: Occupancy groups:
City /State /ZIP: Existing: B, Fl, SI
Phone: ( ) Fax: ( ) New: B, Fl, SI
® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
Business name: LMC Construction (Please refer ro fee schedule)
Structural plan review fee (or deposit):
Contact name: Richard Ray
FLS plan review fee (if applicable):
Address: 8324 SW Nimbus Ave.
Total fees due upon application:
City /State /ZIP: Beaverton, Oregon 97008
Phone: (503) 646 -0521 Fax: : (503) 646 -6823 Amount received:
E -mail: richardr@lmcincorporated.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof -top mounted Photo Voltaic Solar Panel System.
Business name: LMC Construction Submit two (2) sets of roof plan with connection details
and fire department access, along with the 2010 Oregon
Address: 8324 SW Nimbus Ave. Solar Installation Specialty Code checklist.
City/State /ZIP: Beaverton, Oregon 97008 Permit fee (includes plan revi $180.00
and administrative fees):
Phone: (503) 646 -0521 Fax: (503) 646 -6823
State surcharge (12% of permit fee): $21.60
CCB lie.: 161282 Ai '�
I Total fee due upon application: $201.60
Authorized signature: � This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: I Gt4QU �e Date: * Fee methodology set by Tri -County Building Industry
f"`� 8� 9II7� Service Board.
I:\Building\PermitslBUP -COM PermitApp.doc 02/24/2011 440 -4613T(11 /02 /COM/WEB)
0
Building Division
. Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation, alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per -cent (25 %).
VALUATION: Total of all renovation, alteration or modification being done,
excluding painting and wallpapering [1] $
MULTIPLIER (25% barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains: and, $
(g) When possible, additional accessible elements such as storage and
alarms: $
TOTAL (shall equal line [2] of Valuation Computation): $
L:\ Building \Permits \BUP -COM PermitApp.doc 03/03/2011
.111 ° Building Division
Plan Submittal Requirements
T G A R D Commercial & Multi- Family - New, Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking, including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape -ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations, plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit - based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I:\ Building \Permits \BUP -COM PermitApp.doc 03/03/2011
Ph
0 . _:: Building Division
Plan Submittal Requirement Matrix
T I G A R D Commercial & Multi- Family - New, Additions or Alterations
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington
County, and Tualatin Valley Fire & Rescue), if applicable.
I: \Building \Permits \BUP -COM PemvtApp.doc 03/03/2011
Commercial Application Checklist RECEIVED
City of Tigard AUG 0 9 2012
111 ' 13125 SW Hall Blvd., Tigard, OR 97223 CjTy OF'j'd(1ARp
Phone: 503.718.2439, Fax: 503.598.1960 BUILDIr,•G DI
T I G^ R D Internet address: www.tigard - or.gov U�� oi\ *T
PROJECT INFORMATION
Project name: United Rental T.I. Date:
Address: 14020 SW 72nd Ave. City: Tigard State: Or ZIP: 97223
Scope of work: Remodel existing showroom into offices
Reference no.: Map and tax -lot no.:
Contact person name: Richard Ray Company: LMC Construction
Phone: 503 - 646 -0521 Fax: 503 - 646 -6823
Cellular phone: 503 - 915 -7215 E -mail: richardr @lmcincorporated.com
NOTES AND INSTRUCTIONS
• The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan
review will not take place until a complete package is submitted.
• This checklist can be used for all commercial construction projects, including new construction, additions,
alterations and tenant improvements.
• For complex projects, applicants should use the "location" space to note the item's location and page
number from the plans or the specification book.
• It is not necessary to duplicate submittal information, even if it is asked for in multiple sections.
• In the checklist, "Required" means that the applicant must provide this information for plan review.
• In the checklist, "P" means —
• if checked by the applicant — the information is provided for the plan review.
• if checked by the plans reviewer — this information is required for the plan review.
• In the checklist, "NA" means that the information does not apply.
• Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project
Data," must be included with each sro'ect submitted.
PRE- SUBMITTAL PROCESS
An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project
will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the
applicant has completed plans.
INDEX OF CHECKLIST SECTIONS
1.0 General project data Page 2 7.0 Mechanical data (Types I and II
2.0 Civil data Page 2 kitchen -hood permits) Page 6
3.0 Architectural data Page 3 8.0 Plumbing data Page 7
4.0 Structural data Page 4 9.0 Electrical data Page 8
5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9
improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9
6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10
rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10
This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties.
440 -2734 (8 /O1/WEB /COM)
I:\Building \Forms \COM- Checklist.doc 08/08/12
SECTION 1.0 — GENERAL PROJECT DATA
Construction documents Location (sheet number or spec section)
1.1 ® Required No. of sets of plans: New: 1 TI: 2
1.2 ® Required Cover sheet title block
1.3 ® Required Cover sheet vicinity map
1.4 ® Required Cover sheet plan index
1.5 ❑ P ❑ NA Code summary
1.6 ❑ P ❑ NA Deferred submittal summary
1.7 ❑ P ❑ NA Professional stamp and signature
1.8 ❑ P ❑ NA Fire and life- safety plan
1.9 ❑ P ❑ NA Landscape plan
1.10 ❑ P ❑ NA Landscape specifications
Supporting documents Notes
1.20 ❑ P ❑ NA Land -use or planning actions
1.21 ❑ P ❑ NA Required fire -flow calculations
1.22 ❑ P ❑ NA Fire - hydrant flow -test report
1.23 ❑ P ❑ NA Fire department or fire district building survey report
1.24 ❑ P ❑ NA Material safety data sheets (MSDS)
SECTION 2.0 — CIVIL DATA
Construction documents Location (sheet number or spec section)
•
2.1 ® Required Site plan
2.2 ® Required Site utility plan
2.3 ® Required Grading plan
2.4 ® Required Erosion - control plan
2.5 ❑ P ❑ NA Utility -vault location and details
Supporting documents Notes
2.20 El P El NA Geotechnical/soil engineer report
2.21 ❑ P ❑ NA Storm -water calculations
2.22 ❑ P El NA Site retaining -wall structural calculations
2.23 ❑ P El NA "Assurance of Compliance" with environmental rules ....
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 2
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I:\ Building \Forms \COM- Checkl i st. doc
SECTION 3.0 — ARCHITECTURAL DATA
Construction documents Location (sheet number or spec section)
3.1 ® Required Floor plan(s)
3.2 ® Required Transverse and longitudinal cross sections
3.3 ® Required OSSC Chapter 11 accessibility requirements
3.4 ❑ P ❑ NA Interior elevations
3.5 El P El NA Exterior elevations
3.6 El P El NA Roof plans
3.7 El P El NA Exterior wall sections and details
3.8 El P El NA Reflected ceiling plan(s)
3.9 ❑ P El NA Fire -rated construction details
3.10 El P El NA Energy code compliant construction details and
specifications
3.11 El P ❑ NA Door schedule
3.12 El P El NA Glazing schedule
3.13 El P El NA Furniture plan
Supporting documents Notes
3.20 El P El NA Energy code compliance forms /calculations
3.21 El P El NA Material safety data sheets (MSDS)
3.22 El P El NA Hazardous materials inventory statement (HMIS)
3.23 El P El NA Hazardous materials management plan (HMMP)
3.24 El P El NA Written fire and life- safety evacuation plan for area
of rescue assistance
3.25 El P El NA Active and passive smoke - control information
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 3
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\Building\Forms\COM-Checklist.doc
SECTION 4.0 — STRUCTURAL DATA
Construction documents Location (sheet number or spec section)
4.1 ® Required Structural cover sheet
4.2 ❑ P ❑ NA Foundation plan
4.3 ❑ P ❑ NA Under -slab mechanical plan
4.4 ❑ P ❑ NA Under -slab electrical plan
4.5 ❑ P ❑ NA Under -slab plumbing plan
4.6 ❑ P ❑ NA Floor framing plan
4.7 ❑ P ❑ NA Roof framing plan
4.8 ❑ P ❑ NA Structural elevations
4.9 ❑ P ❑ NA Structural details and cross sections
4.10 ❑ P ❑ NA Standpipe information
4.11 ❑ P ❑ NA Special inspector /structural observation matrix
Supporting documents Notes
4.20 ❑ P ❑ NA Geotechnical /soil engineer report
4.21 ❑ P ❑ NA Site - specific seismic hazard report
4.22 ❑ P ❑ NA Design narrative
4.23 ❑ P El NA Structural calculations
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 4
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
l:\Bui (ding \Forms \COM- Checklist.doc
SECTION 5.0 — MECHANICAL DATA (New construction, tenant improvement, gas piping permits)
Construction documents Location (sheet number or spec section)
5.1 ® Required Floor plan
5.2 ® Required Equipment schedule
5.3 ❑ P ❑ NA Site plan
5.4 ❑ P ❑ NA Under -slab mechanical plan
5.5 ❑ P ❑ NA Roof plan
5.6 ❑ P ❑ NA Fuel gas piping plan
5.7 ❑ P ❑ NA HVAC equipment and duct plan(s)
5.8 ❑ P ❑ NA Roof access details
5.9 ❑ P ❑ NA Duct smoke detector plans
5.10 ❑ P ❑ NA Fire /smoke damper locations
5.11 ❑ P ❑ NA Smoke control plan
5.12 ❑ P ❑ NA Outside air (OSA) table
5.13 ❑ P ❑ NA Refrigeration equipment and piping plan
5.14 ❑ P ❑ NA Kitchen equipment plan
5.15 ❑ P ❑ NA Type I and/or Type II kitchen hood plan
(see Section 7.0 — Mechanical Data)
5.16 ❑ P ❑ NA Fume /vapor hood plan
5.17 ❑ P ❑ NA Process piping/product and/or exhaust- conveying
duct plan
5.18 ❑ P ❑ NA Fire -rated construction details
5.19 ❑ P ❑ NA Equipment hanger /fastener details
Supporting documents Notes
5.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
5.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
5.22 ❑ P ❑ NA Outside air (OSA) calculations
5.23 ❑ P ❑ NA Smoke - control calculations
5.24 ❑ P ❑ NA Combustion air calculations
5.25 ❑ P ❑ NA Fuel gas piping sizing calculations
5.26 ❑ P ❑ NA Make -up air calculations
5.27 ❑ P ❑ NA Energy code compliance forms
5.28 ❑ P ❑ NA Boiler information
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 5
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\Building\Forms \COM- Checkl ist.doc
SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits)
Construction documents Location (sheet number or spec section)
6.1 ® Required Roof plan
6.2 ❑ P ❑ NA Roof framing plan
6.3 ❑ P ❑ NA Fuel gas piping plan
6.4 ❑ P ❑ NA Roof access details
Supporting documents Notes
6.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
6.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
6.22 ❑ P ❑ NA Fuel gas piping sizing calculations
6.23 ❑ P ❑ NA Energy code compliance forms
SECTION 7.0 — MECHANICAL DATA (Ty ie I and Ty )c II kitchen hood )ermits)
Construction documents Location (sheet number or spec section)
7.1 ® Required Site plan
7.2 ® Required Floor plan(s)
7.3 ® Required Kitchen equipment plan
7.4 ® Required Kitchen equipment and hood elevations
7.5 ❑ P ❑ NA Roof plan
7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts
7.7 ❑ P ❑ NA Fire -rated construction details
7.8 ❑ P ❑ NA Fire suppression details
Supporting documents Notes
7.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
7.21 ® Required Make -up air calculations
7.22 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
7.23 ❑ P ❑ NA Hood/grease extractor listing documentation
7.24 ❑ P ❑ NA Hood/grease duct sizing calculations
7.25 ❑ P ❑ NA Fire suppression information
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 6
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I:\Bu i Id ing \Forms \COM- Checklist.doc
SECTION 8.0 — I LUMI3ING DATA
Construction documents Location (sheet number or spec section)
8.1 ® Required Floor plan(s)
8.2 ® Required Piping and material schedule
8.3 ® Required Equipment layout plan
8.4 ® Required Fixture schedule
8.5 ❑ P ❑ NA Site utility plan
8.6 ❑ P ❑ NA Building cross section
8.7 ❑ P ❑ NA Rise diagram
8.8 ❑ P ❑ NA Roof plan
8.9 ❑ P ❑ NA Back flow prevention location
8.10 ❑ P ❑ NA Irrigation plan
8.11 ❑ P ❑ NA Fire -rated construction details
8.12 ❑ P ❑ NA Under -slab plumbing plan
Supporting documents Notes
8.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
8.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
8.22 ❑ P ❑ NA Utility maintenance agreements
8.23 ❑ P ❑ NA Water supply calculations
8.24 ❑ P ❑ NA Sanitary system calculations
8.25 ❑ P ❑ NA Irrigation demand calculations
8.26 ❑ P ❑ NA Roof drain and storm water calculations
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 7
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:1Bu i Iding \Forms \COM- Checkl ist.doc
SECTION 9.0 — ELECTRICAL DATA
Construction documents Location (sheet number or spec section)
9.1 ® Required No. of sets of plans: 2
9.2 ® Required Floor plan(s)
9.3 ® Required Electrical load calculations
9.4 ® Required One line diagram
9.5 ® Required Feeder riser diagram
9.6 ® Required Available fault current information
9.7 ® Required Panel schedule(s)
9.8 ❑ P ❑ NA Site electrical plan
9.9 ❑ P ❑ NA Fire -rated construction details
9.10 ❑ P ❑ NA Lighting plan
9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan
9.12 ❑ P ❑ NA Under -slab electrical plan
Supporting documents Notes
9.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
9.21 ❑ P ❑ NA Energy code compliance forms and calculations
for lighting
9.22 ❑ P ❑ NA Emergency power system specifications
9.23 ❑ P ❑ NA Feeder riser information
9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog
"cut sheets" or specifications
440 - 2734 (8 /OI/WEB /COM) Tri -County Commercial Application Checklist 8
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I:\ Bu ilding \Forms \COM- Checkl ist.doc
SECTION 10.0 - FIRE SUPPRESSION DATA
Construction documents Location (sheet number or spec section)
10.1 ® Required Floor plan(s)
10.2 ® Required Sprinkler piping plan(s)
10.3 ❑ P El NA Site plan
10.4 ❑ P ❑ NA Standpipe information
10.5 ❑ P ❑ NA Back flow prevention information
10.6 El P ❑ NA Reflected ceiling plan(s)
10.7 ❑ P El NA Transverse and longitudinal cross sections
10.8 ❑ P ❑ NA Fire -rated construction details
10.9 ❑ P ❑ NA Specialty fire suppression system plans
and list of systems
Supporting documents Notes
10.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
10.21 ® Required Equipment manufacturers' catalog "cut sheets"
10.22 ❑ P ❑ NA Hydraulic calculations
10.23 ❑ P ❑ NA Specialty fire suppression system information
SECTION 11.0 - FIRE DETECTION AND ALARM DATA
Construction documents Location (sheet number or spec section)
11.1 ZRequired Floor plan(s)
11.2 ❑ P ❑ NA Site plan
11.3 ❑ P ❑ NA Reflected ceiling plan(s)
11.4 ❑ P ❑ NA Transverse and longitudinal cross sections
11.5 ❑ P ❑ NA Wiring schematic
11.6 ❑ P ❑ NA Elevator recall information
11.7 ❑ P ❑ NA Operational matrix
11.8 ❑ P ❑ NA Fire -rated construction details
11.9 ❑ P ❑ NA Standard electrical notes
Supporting documents Notes
11.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
11.21 ® Required Equipment manufacturers' catalog "cut sheets"
11.22 ® Required Installer certification information
11.23 ❑ P ❑ NA Battery calculations
11.24 ❑ P ❑ NA Sample fire alarm log book
11.25 ❑ P ❑ NA Emergency power system specifications
11.26 ❑ P ❑ NA Monitoring station information
11.27 El P ❑ NA Voltage drop calculations
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 9
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\BuildingWorms\COM-Checklistdoc
SECTION 12.0 — RE -ROOF INSTALLATION DATA
Construction documents Location (sheet number or spec section)
12.1 ® Required Site plan or building location map
12.2 ® Required Occupancy classification
12.3 ® Required Type of construction
12.4 ® Required Minimum roof class required
12.5 ® Required Class of roofing to be installed
12.6 ® Required Roof plan
12.7 ❑ P ❑ NA Parapet and scupper cross section(s)
Supporting documents Notes
12.20 ® Required Pre -re -roof inspection report
12.21 ® Required Roofing system listing information
12.22 ® Required Roofing manufacturer's catalog "cut sheets"
12.23 ❑ P ❑ NA Structural calculations
12.25 ❑ P ❑ NA Structural engineer's report
SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS
Construction documents Item Location (sheet number or spec section)
13.1 ❑ P ❑ NA ❑ Required
13.2 ❑ P ❑ NA ❑ Required
13.3 ❑ P ❑ NA ['Required
13.4 ❑ P ❑ NA ['Required
13.5 ❑ P ❑ NA ❑ Required
13.6 ❑ P ❑ NA ❑ Required
13.7 ❑ P ❑ NA ❑ Required
13.8 ❑ P ❑ NA ❑ Required
13.9 ❑ P ❑ NA ❑ Required
13.10 ❑ P ❑ NA ❑ Required
440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 10
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I:\Building\Forms \COM- Checkl ist.doc
o ° Building Division
Over - The - Counter (OTC) Building Permit
TIGARD
Check List
Project Description: T Pc)-6 —&d i '
APPLICATION SPECIFIC INFORMATION
GENERAL INFORMATION
*Class of Work: Occupancy Group: Type of Construction:
*Type of Use: (tAA Occupancy Load: Oregon Specialty Code: , "7-010
SPECIFICS
Number of Stories: ?/ Building Height: Mixed Use:
Number of Dw Units: Number of Bathrooms: _ Number of Bedrooms:
BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES
Story Square Footage: Accessory Structure: Covered Porch:
Basement: Garage: Deck:
Total Square Footage: Carport: _ Mezzanine:
SETBACKS
Sideyard Setback — Left Sideyard Setback — Front
Sideyard Setback — Right Sideyard Setback — Back
CONSTRUCTION
Exterior Walls: Openings Protected: Firewall Separation:
N: S: N: S: Occupancy Separation:
E: W: E: W: Access. Parking Spaces:
REQUIRED ITEMS
Fire Sprinklers: /W Fire Alarms: Smoke Detectors:
Parapet: Manual Pull Stations: Protected Corridors:
Total Project Valuation: $ 100 FEES DUE
$ ((p7, QQ DC Prov Rvw, COM TI — Ping
$ 2 5') DC Prov Rvw, COM TI — LRP
DC Provision Review Fee for COM TI $ Q° . " '5 Fee — Add, Alt, Demo
Project Valuation Planning LRP $ Z , 7 12% State Surcharge
Up to $4,999 $0.00 $0.00 $ ' , Plan Review, Structural
$5,000 - $74,999 $67.00 $10.00 $ , 1. Plan Review, Fire Life Safety
$75,000 - $149,999 $167.00 $25.00 $ Info Proc /Arch, Lg (over 11x17 $2.00)
$150,000 and over $268.00 $39.00 $ 3 . pQ Info Proc /Arch, Sm (up to 11x17 $0.50)
$ 20 CO Metro Construction Excise Tax
$ School Construction Excise Tax
$ Hourly Rate Fee
Planning Staff: $ Hourly Rate State Surcharge
$ Misc. Admin Fee
Permit Coordinator: $ Other:
$ Other:
Building Staff: $ Other:
Date /Time: $ 2.74 (( TOTAL FEES DUE
*OPTIONS:
TYPE OF USE: COM = commercial; CMS = commercial manufactured structure.
CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; FND = foundation; DEM = demo;
END = foundation; FPS = fire protection system; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies);
REP = repair.
I: \Building \Forms \OTC - BUP.docx 07/01/2012
1 o ° Building Division
Development Code Provision Review
T I G A R D Commercial Projects - No Associated Land Use Case
Building Permit No: A up 40 ►A- ()b l5 ❑ Expedited Review
Plan Submittal Date:
To the Applicant:
> If the proposed use is not permitted within the zone, please contact the Building Division to cancel
the permit application. Building Permit Technicians (503) 718 -2439.
> If a land use is required and for all other questions, please contact the staff person listed above the
Planning Review section.
Staff: please check items along left only if approved.
Planning Review (contact 34 / /ayl at 503 -718- i 2 . or JOoh 1C7 @tigard - or.gov)
❑ Zoning -L'-- Permitted Use Yes tl No ❑
❑ Land Use Required: Yes ❑ No '$l (explain below)
Notes: A% 04 ha , /c in Ul C.
IX Approved ❑ Not Approved Date: 9 2c9L
Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert @tigard - or.gov)
Notes:
Routed back to Building Division Date:
•
I: \CURPLN