Loading...
Correspondence City of Tgard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 November 29, 2007 q r , • RE: FIRE SPRINKLER SYSTEM Proiect Information T I`GARD Building Permit: BUP2007 -00590 Construction Type: 2 -B Tenant Name: Management Group Occupancy Type: B Address: 15350 SW Sequoia Pkwy. Occupant Load: 64 Area: NA Stories: 3 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; National Fire Protection Association, Standard 13 (NFPA 13) 2002 edition and the State of Oregon Fire Code (OFC) 2007edition. GENERAL 1. The clearance between the deflector and the top of storage shall be 18 inches or greater. Section 8.6.6.1 NFPA 13. The distance shall be increased to 36 inches for Large Drop sprinkler heads. Section 8.11.6 NFPA 13 2. Sprinklers shall be located a minimum of 4 inches from walls and spaced not less than 6 feet on center. Sections 8.6.3.3 & 8.6.3.4.1 NFPA 13. 3. Clearances shall be provided around all piping extending through platforms, foundations, walls and floors. The diameter of the hole shall be 2 inches larger than the penetrating pipe for pipe sizes 1 inch through 3 inches. The diameter of the hole shall be 4 inches larger than the penetrating pipe for pipe sizes 4 inches and larger. Sections 9.3.4.1 & 9.3.4.2 NFPA 13. 4. All valves controlling the water supply for automatic sprinkler systems and all water flow monitoring devices shall be electrically monitored when the system serves more than 20 heads. Section 903.4 OFC 5. The system piping shall be braced to resist both lateral and longitudinal horizontal seismic loads to prevent vertical motion resulting from seismic loads. The structural components to which bracing is attached shall be determined to be capable of carrying the added applied seismic loads. Sway braces shall be designed to withstand forces in tension and compression. Bracing shall be attached directly to feed and cross mains. ce 6. The end sprinkler on a line shall be restrained against excessive vertical and lateral movement. 7. All concealed spaces enclosed wholly or partly by exposed combustible construction shall be protected by sprinklers. Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect Ily, an Nelson, Senior Plans Examiner (503) 718 -2436 dann @tgard -or.gov