ROW2012-00075 It CITY OF TIGARD RIGHT OF WAY PERMIT
! COMMUNITY DEVELOPMENT Permit #: ROW2012 -00075
1 3125 SW Hall Blvd., Tigard OR 97223 503.718.2421 Date Issued: 08/07/2012
TIGARD Parcel: SEG92
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: NW Natural
Project Description: Adjacent to 9335 SW 74th Ave., install 1 "(P) svc, short side, standard main tie, 2 "(W) on the E 22', with/
1 "(P) stub inside property line.
Owner: FEES
Description Date Amount
ROW Permit Fee 08/07/2012 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
COLLEEN O'BRIEN
220 NW 2ND AVE.
PORTLAND, OR 97209
PHONE: 503 - 226 -4211
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee /Applicant
Signature: c nod p (e.se,fl+)
Issued By:
rot 1 ��' / &
Special Conditions (See Attached)
Note: THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for ROW2012 -00075
Type: Condition Name: Status: Severity:
ROW 01- CUSTOM CONDITION Applied Notice
<Custom Condition goes here>
ROW 02- PERMIT & PLAN REQ ON SITE Applied Notice
A copy of the permit and all attachments, and a copy of the approved construction plan and all amendments shall be
available at the work area All work shall conform to the permit terms, conditions and provisions and to the City approved
permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General
Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance.
ROW 03 -TRAF CTRL - SPECIF (CITY) Applied Notice
The City's standard specification for traffic control is "Manual on Uniform Traffic Control Devices for Streets and Highways ",
U.S. Dept. of Transportation. F.H.A., 1988 Ed.
ROW 04 -TRAF CTRL -CONTR RESPON FOR Applied Notice
Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in
accordance with a City (job specific) approved traffic control plan. A copy of the approved traffic control plan shall be
available at the work area
ROW 05 -TRAF CTRL -ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without having first obtained written approval from the City
Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide
Emergency Services (Tigard Police Dept., Tualatin Fire & Rescue) and to Tri -Met and Tigard School District.
ROW 06 -TRAF CTRL - ADVANCE WARNING Applied Notice
Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance
notification sign at each end of the construction area 72 hours (min.) before initiation of construction work.
ROW 07 -TRAF CTRL -PRIV PROP ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not,
shall be cause for work stoppage until effective access is established.
ROW 08 -TRAF CTRL - DEVICES IN PLACE Applied Notice
Traffic control devices, flagpersons, etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
ROW 09 -TRAF /NOISE CTRL -WORK HRS Applied Notice
No work will be permitted during the hours of darkness, nor between 9:00 p.m. to 7:00 a.m. Monday through Friday, nor
between 9:00 p.m. to 8:00 a.m. Saturday, nor between 9:00 p.m. to 9:00 a.m. Sunday.
ROW 10 -TRAF CTRL -MIN LANE WIDTH Applied Notice
Minimum travel lane width shall be eleven (11) feet; pedestrian travel shall also be provided for.
ROW 11 -TRAF CTRL -CITY CAN MODIFY Applied Notice
The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic
and to assure public safety.
ROW 12 -INSP 24 HR NOTICE REQUIRED Applied Notice
The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503 - 816 -6146 or email at
kenny @ tgard- or.gov, twenty -four (24) hours prior to commencing work, twenty -four (24) hours prior to any staged
inspection, and after completing work covered by the permit.
ROW 13- HAZARDS -CERT OF INS Applied Notice
Maintenance of the work area and approach roads is the responsibility of the permit holder. The work area and approach
roads shall be maintained in a clean condition, free from obstructions and hazards. A copy of the permit holders Certificate
of Insurance shall be available at the work area
ROW 14- DEBRIS - MATERIALS Applied Notice
The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly
prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate
cleanup and stoppage of work to accomplish cleanup.
ROW 15- EROSION CTRL REQ Applied Notice
Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q.
requirements. The City may at any time order corrective action and stoppage of work to accomplish effective erosion
control.
ROW 16- REPAIRS -LIKE MATERIALS REQ Applied Notice
Property disturbed by construction activity shall be seeded with a standard grass mix; shrubs, flowers, barkdust, existing
signs, pavement markings, mailboxes, etc., shall be reestablished, reinstalled or replaced, with like kind and material.
ROW 17- DRAINAGE CONTROL REQ Applied Notice
Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent
private property, public property and the receiving system is not adversely impacted. The City may, at any time, order
corrective action and stoppage of work to accomplish effective drainage control.
ROW 18- UTILITIES PRELOCATION REQ Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952 - 001 -0010 through OAR 952 - 001 -0080. Copies of the rules may be obtained from the Center by calling (503) 232 -1987.
If you have questions about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders
expense.
ROW 19- UTILITY LOCATIONAL CONFLICT Applied Notice
Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall
coordinate the work with affected utility agencies.
ROW 20- TRENCH - PATCH /SAFETY /LBILITY Applied Notice
A temporary hard - surface patch (Cold mix A.C. or Hot mix A.C. base paving) shall be placed on trenches within roadways
at the end of each day's work. No trench, on site or off site, shall be left at any time in an unsafe condition. The permit
holder is responsible for and is liable for hazards or damage resulting from the work.
ROW 21- REPAIRS REQ - INSPTR OPINION Applied Notice
Work provided for under the permit shall include repair of existing facilities (roads, ditches, etc.) as may be necessary, in the
City Inspectors opinion, to overcome deterioration or damage which occurred in conjunction with the work authorized by the
permit. Corrective work shall be done at the permit holders expense.
ROW 22 -AS- BUILT /ENGR CERTIF REQ Applied Notice
At the end of each year, or an a mutually agreeable yearly date, any entity making changes to its facilities in the public
right -of -way shall submit complete "as- built" drawings showing all new public improvements, including any revision made to
the previously approved construction plans and, also, any improvement which may impact an existing public system or
facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation
compliance (form attached).
ROW 23 -DAILY INSP REPORTS REQ Applied Notice
The permit holders Engineer /Inspector shall submit daily inspection reports, on a weekly basis, to the City's Inspector. (see
Developer- Engineer Agreement note #5).
ROW 24- TESTS /REPTS TO VALIDT CLMS Applied Notice
The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's
engineer or contractor to validate claims of material or construction adequacy /compliance. Such tests /reports shall be
provided at the permit holder's expense.
ROW 25- RELEASE - WAIVER REQ Applied Notice
The permit holder shall provide a copy of a properly executed Release & Waiver document to the City for each ownership
disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction.
ROW 26- MONUMENT PROTECTION REQ Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holders
expense.
ROW 27 -PROB SOLVING - RESPON PARTY Applied Notice
The permit holder shall provide to the City Inspector, in writing, the names and 24 -hour emergency telephone number of two
(2) persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of an
emergency. The permit holder shall notify the City Inspector, in writing, of any /all assignment changes.
ROW 28- CONSTR SAFETY - RESPON PARTY Applied Notice
The permit holder shall cause his contractor to provide to the City Inspector, in writing, the name and 24 hr emergency
telephone number of a designated "Competent Person" responsible for construction safety as per OR -OSHA, Chap. 437,
Div. 3 Construction, Subdivision P - Excavations. The contractor shall notify the City Inspector of any /all assignment
changes.
ROW 29- ESMT /RT OF ENTRY - RESPON Applied Notice
It is the sole responsibility of the permit holder to provide for proper right -of -entry and /or easements prior to starting work.
Proof of right -of -entry, or properly executed easements, shall be provided to the City. The City shall in no way be construed
to be liable for the permit holder's failure to obtain or provide for proof of right -of -entry or easements.
1111. CITY OF TIGARD RECEIPT
13125 SW Hall Blvd., Tigard OR 97223
503.639.4171
TIGARD
Receipt Number: 187900 - 08/07/2012
CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID
R0W2012 -00075 ROW Permit Fee 100 - 0000 -43114 $300.00
Total: $300.00
PAYMENT METHOD CHECK # CC AUTH. CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT
Trust Account NWNDEP TLEHRBACH 08/07/2012 $300.00
Payor: NW Natural
Total Payments: $300.00
Balance Due: $0.00
Page 1 of 1
APPLICATION FOR a
WORK IN RIGHT -OF -WAY (ROW) PERMIT N c..
TIGARD
Development Engineering
13125 SW Hall Blvd., Tigard OR 97223 (503) 639 -4171 FAX: (503) 624 -0752
FOR STAFF USE ONLY
General Information:
Right -of -Way
Property Address /Location(s) SW 74th Ave Case No.:_ ROW 2012 -0007S
Tigard, Oregon 97223 Receipt No.:
Date: . 1317/
2.4
`Applicant's Name:
NW Natural / #3364702 Application Accepted By:
Address: NW 2nd Av Revixd 3/4/09
City/State: OR Zip :97209 f�
in I. 2 , 2 - 34,"
Primary Contact: Colleen M. O'Brien REQUIRED SUBMITTAL INFORMATION
Phone: 226 -4211 X 4347 Fax: 503- 273 -4822
Contractor's Name : Loy Clark Submit a scaled sketch of the
CCB#on file Expiration:on file
proposed work to be done
Address: Box 1369
City /State: Tualatin OR Zip: 97062 Professional Engineered Plans are
503 783 1170 503 - 520 -8763 required for:
Fax:
Phone:
• Street Widening
NWN (same as above) • Subdivision Infrastructure
Plans By : • Main utility line extension:
Address:
City/State: Zip:
Phone: Fax:
Description of work : Install 1 "(P) svc, short side, standard main
tie, 2 "(W) on the E 22', with/ 1 "(P) stub inside property line.
See attached.
Estimated value of work (within the public right -of -way): $$2.50 x 22' = $55.00
Is work related to a LAND -USE DECISION? YES ❑ NO
If so, please specify (MLP, SDR, SUB, etc.) case #:
Is the work related to a BUILDING PERMIT? YES ` NO I.1
If so, please specify (BUILDING PERMIT) case #:
"NOTE: Person specified as "Applicant" shall be designated "Permitee" and shall provide
financial assurance for the work.
c : .e0rysk.Md,, 1opww � .l
NW Natural — Site Information Form (SIF)
Service Address Service WO#
9335 sw 74th Ave 3364702
Plat # City and County Main WO# Revision#
Tigard
LOCATE INSTRUCTIONS:
marked in white
White Paint Down? ❑ YES ❑ NO
How many Headers? ' Delivery Pressure Total Therm Load
❑ Single ❑ Double ❑ Other #: ❑ Standard 02 PSI ❑Other. 2th
Residential ❑ Commercial ❑ Industrial ❑ Conversion 0 Riser Relocate ❑ Cutoff pJ New Const ❑ Open Pathway (open) Q] Conduit
❑ RUSH ❑ PRESOLD ❑ Bore w /crew 0 Bore- N -Go ❑ GNS 0 Double Off ❑ Keyhole ❑ Job Agreement ❑ Easement Required
PERMIT REQUIRED ❑ NONE
❑ City ❑ Sticker ❑ Verbal ❑ Notify Only ❑ Blanket ❑ Standard
0 County ❑ Sticker ❑ Verbal ❑ Notify Only ❑ Blanket ❑ Standard
❑ ODOT/WSDOT
❑ Railroad
❑ Other (specialty permits, easements):
❑ Flagging required
❑ Traffic Control Plan Needed ❑ Standard ODOT template attached ❑ Vendor - provided plan
INSTALLATION REQUIREMENTS See Separate Attachment
Service Size & Type Service Footage
1/2" 55'
Main Size & Type Main Footage
Service to Main Location 0 Short ❑ Long
Hard surface cuts required? 0 YES ❑ NO
Street Moratorium? ❑ YES ❑ NO
Guard Post Required? ❑ YES ❑ NO
Fiber Optics? ❑ Unknown ❑ YES ❑ NO
Oil Tank? ❑ Unknown ❑ YES ❑ NO
Septic Systems? ❑ Unknown ❑ YES ❑ NO
Sprinklers? ❑ Unknown ❑ YES ❑ NO
Other (list): ❑ Unknown ❑ YES ❑ NO
Houseline Installed: OYES ❑ NO Meter Loc: left 5' past pge
❑ Green Tagged
Working within open water area? ❑ YES ❑ NO Erosion Sensitive Area? ❑ YES ❑ NO
Working within proposed or existing planter strip /swale? ❑ YES ❑ NO Working in a Tree Critical Root Zone? ❑ YES ❑ NO
CROSS SECTION DETAILS Paving Symbols: AC— Asphalt E —Earth C— Concrete G— Gravel
PUE — Public Utility Easement, ROW — Right -of -Way, EOP — Edge of Pavement, C/L — Centerline
w a a w
!, 0lfllnOn LS a. cr west sida W G
2 2' is the new CURB? Y! N CURB? Y N
CL
property line
for this lot
Number of cuts:
Size of cut(s)::
p gas 22'
❑ Over main
❑ Over other utilities
2 2 ' 12 '
Street Name:
sw 74 th
E AC
Direction Facing ❑ North ❑ West
F -8039 (6/30/10)
NW Natural — Site Information Form (SIF)
Description SERVICE MAIN
WO #: WO #:
Crew comp
Construction 4 (DCL)
Construction 3 (MCL)
Construction 2 (PJ) x
Construction 1 (PF)
Equipment
Crew Truck
Poly Trailer
Pickup Truck
Kubota, 3 Yarder & Trailer
John Deere, 3 Yarder & Trailer
Mini - Excavator, 3 Yarder & Trailer x
Mid -Bore / Mini -Bore
Hole Hog
Keyhole Truck
Contract Hoe & Dump Truck
Contract Dump Truck 10 Yarder
Other Labor /Equipment
Vac -X Truck & Crew
Mechanic Welder & Truck
Contract Bore Crew
Flagger — how many?
Plate Truck
Backfill & Resurfacing
Sand (yd)
Gravel (yd)
CDF
Paving Depth:
Concrete Depth:
Miscellaneous
Contract Sawcut x
Standard ' /2" Service Kit + Meter x
Standard 1" Service Kit + Meter
Company Material
Other:
NOTES: (Construction details, flagging requirements, ground conditions, etc.)
run 1" to property with stub to South at property line for future lot.
Name Steve Bartle Cell # 503- 706 -3450 Date 7 -18 -12
F -8039 (6/30/10)
_ . .. • - •
.•-' . . ,.., , - ...::
, . .... . - • . - - - - ' ' . .
: • ‘A.
, . •
4
1 , . _ ,..,....,..
nut
,.,
_ 1151r 7 111111e4°',0 " 1 " . ...rairser. .
. .4"...14. , ,
. -, -
. ..
. ..„ .
i
r ,
.....0.04
•
........ _ _
, • • 00, ,
il. t
— — — •. • luitire . ...,,.. 4e . , .
ii -
. . ...!." y - • .. ,. _
I t 1111\11k,
.
.__,_••-• ' " .
. • - - -
- ‘ , 4 411111101 1111111.1111111111111.111111 -4,4
.. ..---
1 .,...... 15
1.,, _ ...
IPA • . .- •
.. . ,
. ' ....,--........ ,.. .
. •. •
. .
____ .. •
., ....
. _ . \ •• ,
1111111111111 . , .--
.
. . ,
..„..... . -.............„.
•
..
. _
. .
_.- _„ - ..--• - --- .
. .... . .... . in, -.-
• .
.... ,
...... • ... . .._ ,. _
' - • • ••-.. -n07., •g • .,.....„‘ :.::-- ...:-- -•_.. . . ..,,_ _
..•
, .
.. . - .
....,_:„... ,.• - -.-.. -' - .'-...4i.f•-.i--k.:•:-.•;-,-,..,. :.-- . _J.:- .-..-... •• . . • _ . . r. • ,.. ......
_. - - ..- , --7, • . . ......... ....
.....
• -_ -.• , '4. 1 • .".:'.: ' = . .
■. '•• -' .1 , .i..3...it-...$ 0 ,4,. . ..,_ .. •,t..f . , .
' 1 ' . ''. ' ' ' . .• - • ' . . ''' - ','... ; '''' '.. - . - ' . ••• 4." , : . - . • ,• • 15 ' wa.. • • .'.7 *••, - , ' . 4 °. •
• — •-''''' ' •* ....: : • . '....,"?'.',,,-
• "v 4.• .41" 0.1 ...' • -' .
. -. - - • . . '-'..-...:.--.. ...:?/.-'
• '
. ;•-• •••,,,y-,4 :,..1-.• ..',-`• ". ° ' '"; •• ..•
.,.,. ... • ., ..,.,,,, .,.,,,..• ..., •,„..„*„,,, kr: 4-1 , 7. 4, 7:: . ::.,- ,..; .
... ''. " • '' .,.... ',' ,! a ,,'",.!r: . ftil. . ,, .. .. '7 ."-', 1 . : , ,„, " ' , , : , , „..,,, ', . _ •
- . " ' '• :' . 1 L'" .'„,ii i - "^.4 . i.t. , f.' , . 4..'• 4•■•!1 -".... ...- q!". " ,..74, ', ....s. • „ , , '
SW 74th
.. ,..... „...,.... ...,.....„.,..,,,, . 7 , .,.... . ,.,„.,,, ....- . ...„,_ ., :-. ..... . „......„,.., ., ,
, ..:. .,, _ . - ,:.... • , ..,... 4 ,,,,„ 4,4. .....-. ..,:-. . , .,„ , . • , , - • • ., - . , .
....iiti -,.,..--,*- , - ,41-, :,..s, ‘ 4 • 1 . - ' . - ' ' • ' . - • .
417
. . . ._
. • •. ' : • ' . • .1.` I t a :.,...•• , . -.. .' ` 1 ....- ,...`', :...'
i ,... -, ....-. - .. . ,
. - ' - ‘_ .. - .. , :. 301.... ..` . --, . . mr,, . . .1'... ..-„•..• fe: - .... ' . ... ' • . 7. . , - . - . .. .
• '
- ' . - - -=' 7 - .• .--.- ''. • . ' . • ; ,A ..- : - ' .: - .•' • -... - - - , • ••,,,- .. . • . .. • ,.
, • . . . •
• . , • ., .., - - • . , . ,.. . „:,....•• ... - ., .,, , , 4 ,;•0 .. - ' "'•• 4.. ..... '•-• ----' • - - . . ,
- , „ . •,.... ., .-....., , ... 40 \-...ii,i•ji,..4 !• • . .. ea....-- . - ,. . .4'. ....,, --. .'., ..' . • • • - " — • . — ' • , .
. .. . -,,,.. ...„ . , ...., . 4 ..... 0,-. 4 sik.r.f.h . ...Jr: jot ,::',.., ....! . 1% `...,, ... , . , :., . .. „ _,. ,.. ... ,, i „, .,..., , , .,. .. ,... - ,,, . ..% . _ , .. . ' . . : ‘: , ,
, •)..,.__•,...„.. ,.._......,. . _.. .., • .
........ ., .. •
-4 ' . •-• : -'q, ' • " i :- -. Z. .. v ''', . •2.„,i• .' v. ,,••,,e' ,• . ,, .,' , ' .•• • i • ' r , .„ - " ,., -;.- -., . ' . • ..4 . . • , .. ,. : ;...,,, ' - , - '. .. , .
-'• . . '' ..... ..:' f . ...., -•••'„‘,‘ ''''4 .4* ,J. -- " : " Ik' .' - 4 5...l v - ,. • . 4 '. ' g ri- ' ' ''- .0- f•,..." . ".• - -:'.. - ..., • . ,'.. . ".., . , ' . ' - . - 1. ..: . .
. 4 . ..
. - . . , - 4 . - . - o' • ..,,' 1 , r.i,.; • - - ' . ., - 1. ..-, ' .0r;a '. . - ,., .. .4.. y • . •••" •••—• ".. ';', - - -", - '•'• , • fill. ,
V . ••• ..- • '" •• 4 1 12.‘.' ' ' ' . '1 ! .- ., 7 47 ' I = '••• 1 ''' ' - "•• ..';,..'4 , , v ` , l• - , • •.:1 ., • , ,
•• .. - ... = • t., ': 4. ,: ,•,,, 4 ,;,.•.`...e, *: . - h . .
... I - - - -; .' ' ', ''- '''''+"' '... '' e "I - • V' ' 4 '- ' , L.. " , , ,•*•7• A,... , • • " #.$"'. ' "440 1r ' . , --,.. ,..,„ .:'. ' A . ' !., 4 ' Z''' .4 t.....:1'.. . c _ 4 " ''.- ,,...`"'"' ' ' '- 9
. . . . .
• .. • . - , :,•• • ' .. tor.,, Ilm,k ',.. . , w' , t . - '1 •,, • -.., ,.. -- ,„..., .. .!••••
• • ... ... ;„ ,„,.• ... r...1,---.:4„,,-. - , - t - . . ..
. , - . . ., . r , - - -„,, , • ..., '.. ,4• ',. -, -.P. ...'ke .' . - I . ' _0 ^ '* ' - •77sv i ', /0-. ..- i . - 1 4 ‘!..'‘ - •••11 .,..."' 4. ..._"..- - : '' ' - .A.;.:',!"... * 4r".•' . " ,k '" At_ ' - . 4
. . .. ..
- "* . - " "". ''...*" . ' . '- : - , 4 - , - .... .42; 4 , 4 .. % * 1 3.t .'; "!TI -Ir."4 ..: 01,...' ,;.,..."- I I' .41 :_t:t..,.. '2 r" , ,.. 4 4 , .. _ . . -# .17" ':. 'in r ' - . ....4- : • •;',....i ,-,,. ..:
... • ' 4. - -.,,, 7 . .- 3 . ..4 ....,t ,,-,-.......,,..,-..- ,,,.." . .• 4. . ,. ..., 4 . 1, :15' '.. . ' ' . • : .,- .1P-' - .. : . ' . . P'. fr 4....1";■%"' 4 21. 1 0;• .
.,,.' - ' . :. • : • :•:' .." . ,,• : : 2 ' .irc.. .'''..". t • .: - ,'. '," ; .. ' . - ; '-4 ,L 4 . ''' Ai ". . . ''. ' -' .... '...
A .. ■ , , ''' '''. . . . . ' .....' ' .1 , .11 ,w ., • ..... ..- . , .., . ' - 0 .. ; •"it 4: ,.....4 _ ,,o, . .„,'• .. . :. 1' , .11..... 4 • , • . ' ...1 . ,.. , — , . • ' okk . - .....: • '..- - - . •■• . -
, •• 1,,, . • , . 1 ' ..4 . , ..• ' , ,' , ' :1 , .4 t ,....A. • '.,, ) :,.. ' . * e ' A .. . ....;, . ...H. ,.. ...
• . '. T. ' . 1! 1-,,, *.r, • "". ..... -. ... ' a ' .-.• .....• g 4 .„. . '..`. .. ' '."'
. ,
'' - . - i .r.„ .. .,.. — . " 2 -; . .7.: ... •._ ,,, .- .. t. ..I • ... :- . , V‘ ..
...!' r ' . '.... 1 : .• , ,' "so • • ..,4, .' - .,•••'..4. ...if':'.`. .,.. • . . ,'-- `.. ". . .. :
- , ' -. • • .. t. . . .` . . - ..?'''' 4.. • .• .- 0- ,-.',. • 9 10 tor • .4 • . i + . ..- + '
' ... '
. +
I
... --
.. .
12r fon e,
)
fa acc I
42264 f olj •
le"
Mat .,...,— I I* , tt
..........",
=
.
P . 112/ a ,
re) , g try!)
i
4. ,
...__
■ it
ri "v k
4 , 4,,, / ../-
....
.-..--,---- I , 0 t g I 1 W OC) C • or , 'Ad.'"
- ))/ / /
/
_
ft
a /
t .te
1111.
e
Taylors Ferry rd ae /
4 • ° . ,. ________SL_T. . 4411..... 4
r yt I : I ,. s c v 0./ •
. . ....„... stuc
_. ... r
1 or at.
4
/
I
0.-
..
,- 4.-
k7.04 t e
a
. i - 1 3 c
,
. b .7 4 (IT
ii 9335 ,••• :...
...-•■ •
.
i
• I 4:1........--6., II 4. 6,
I 6) ');/// •41
A
... o fal *410
Future lot kt. 1 ezti /
I:
/
1 Cri i 14tY 4
v a.
I ...x.r4s
Mos
_ ' 1 alga OM 1 i al) c.
r. ( or= Jo
In * , . 0. t
. 0.11111.• 2..
1` filotX .
I r
I e
.. €:....
i: Ingo
, • IS )
# I
i ' r
1 i
33.
8 2 g
----1,—.
1 L
1 , 4 1 i :.•
ir at
i ) 4140
... I .
0 1 ,5 0 ic.,..; ,..) c 5 E