Loading...
Correspondence • ewe +I March 25, 2003 - �`� CITY OF TIGARD • Craig Schuck OREGON Ferguson Construction 7433 5 Ave. South Seattle, WA 98108 1 l Re: ntal Rack Storage I I l Sequoi B1102003-00098 Occupancy Group: M The City of Tigard Building Division has performed a plan review for the above referenced project. This review was performed under the provisions of the State of • Oregon Structural Specialty Code, 1998 edition (OSSC) and the Uniform Fire Code (UFC) as amended by TVF&R. The plans are approved subject to the following conditions. 1. Permanent placards shall be installed on each rack system identifying the maximum load for each rack. OSSC 2222.5, Volume 2 2. The engineer has specified (5) different anchor bolts. Prior to installation of the anchors, and after the holes are drilled, an inspection by the City of Tigard • Building Division is required to verify hole depth and anchor type that will be used. • • 3. A copy of the approved plans shall be on the job site at all times and available to the City. of Tigard inspectors for inspection purposes. OSSC Section 106.4.2. 4. A final inspection and Certificate of Occupancy is required prior to occupying for . the intended use of this space. OSSC Section 109.1. If you have questions regarding this review, contact me at (503) 718 -2448. Sincerely, Ga 1am ells ry P Building Official . C. Hap Watkins, supervising Inspector Eric McMullen, TVF&R File 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772