Loading...
Correspondence T January 24, 2003 Scott M. Kemp, Architect CITY OF TIGARD 2630 116 Ave. W, Suite 200 OREGON Bellevue, WA 98004 l • Re: The Home Depot Tool Rental Addition 14800 SW Sequoia Pkwy. t BUP2002 -00535 Dear Mr. Kemp, Winstead & Associates has completed a review on behalf of the City of Tigard Building Division of the above referenced project. This review was performed under the provisions of the. State of Oregon Structural Specialty Code (OSSC), .1998 edition and the Uniform Fire Code (UFC) as amended by Tualatin Valley Fire & Rescue. The plans are approved subject to the following conditions. 1. Special inspection is required for concrete placement and structural steel welding. The special inspection agency has been identified. as Krazan & Associates. All inspection records shall" be forwarded to the attention of Hap Watkins, Supervising Inspector at 13125 SW Hall Blvd., Tigard, OR 97223. 2. Fire extinguishers shall be provided in accordance with UFC Standard 10- 1 and shall be located so the travel distance from any point to an extinguisher does not exceed 75 feet. 3. A copy of the approved plan shall be kept on the site and made available • to the City of Tigard inspectors for inspection purposes. 4. A final inspection and certificate of occupancy is required prior to the intended use of the addition. • Sincerely, Gary ampella • Building Official c. Hap Watkins, Supervising Inspector File 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 i• i Scott M. Kemp Architect November 4, 2002 • City of Tigard Department of Transportation and Development 13125 SW Hall Blvd. Tigard, OR 97223 To Whom It May Concern: Re: The Home Depot — Proposed Tool Rental Center Addition 14800 SW Sequoia Parkway, Tigard, OR Commercial Building Permit Application On behalf of the Owner, we herewith apply for a Building Permit for the above referenced property. Please find attached the following items, for your review, approval, comments and /or distribution: • Building, Mechanical, Plumbing and Electrical Permit Applications; • Commercial Application Checklist; • Check for payment of plan check/permit fees in the amount of $3,446.45 o Fee based on construction value of $325,000.00 and confirmed with Debbie on September 27, 2002; • Four sets of signed and sealed drawings with specifications on drawings (architectural, structural, mechanical, plumbing, electrical and civil); • One set of signed and sealed structural calculations; and • Letter providing supplementary Planning and Building Code information. Please call if you require further information. Prepared by: 4 \ 0 0 David A. Fawley, NCARB Direct: 604 - 632 - 4363 Copies: Kirk Bezanson & Dean Thornton, The Home Depot Scott M. Kemp, Architect 2630 116 Avenue NE, Suite 200 Bellevue, WA 98004 Toll Free: 1.877.632.3350 • Fax: 604.632.3351 Page 1 i ' January 24, 2003 . 4 . 4._ 4 (JA Scott M. Kemp, Architect C ®F 11 GAR® 2630 116 Ave. W, Suite 200 OREGO Bellevue, WA 98004 Re: The Home Depot Tool Rental Addition 14800 SW Sequoia Pkwy. BUP2002 -00535 Dear Mr. Kemp, Winstead & Associates has completed a review on behalf of the City of Tigard • Building Division of the above referenced project. This review was performed under the provisions of the State of Oregon Structural Specialty Code (OSSC), .1998 edition and the Uniform Fire Code (UFC) as amended by Tualatin Valley Fire & Rescue. The plans are approved subject to the following conditions. 1. Special inspection is required for concrete placement and structural steel welding. The special inspection agency has been identified as Krazan & Associates. All inspection records shall be forwarded to the attention of ,U rk - Hap Watkins, Supervising Inspector at 13125 SW Hall Blvd., Tigard, OR 4, 97223. 1 2. Fire extinguishers shall be provided in accordance with UFC Standard 10- 1 and shall be located so the travel distance from any point to an extinguisher does not exceed 75 feet. 3. A copy of the approved plan shall be kept on the site and made available to the City of Tigard inspectors for inspection purposes. 4. A final inspection and certificate of occupancy is required prior to the intended use of the addition. Sincerely, A- 714 Gary ampella Building Official c. Hap Watkins, Supervising Inspector File 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 `_:!u WINSTEAD AND ASSOCIATES ARCHITECTURE AND `BUILDING CODE SERVICES PC. P.O. Box 2198 Phone: 503- 723 -8003 Oregon City, Oregon 97045 Fax: 503- 723 -8234 Email: codcexpert@msn.com January 18, 2003 Gary Lampella, Building Official City of Tigard 13125 SW Hall Blvd. ( Tigard, Oregon 97223 Subject: Winstead & Associates Plan Review: 2147.tig City of Tigard Permit: BUP2002 -00535 Project: Home Depot 14800 SW Sequoia Parkway TIGARD, OREGON 97223 Dear Gary, The drawings and related design documents for the proposed work were REVIEWED AND FOUND TO BE IN SUBSTANTIAL COMPLIANCE with the 1998 Oregon Structural Specialty Code (OSSC). It is important to note the issuance of a permit shall not authorize the violation of any provisions of the OSSC. Permits presuming to give authority to violate or cancel provisions of the OSSC are not valid. The recommendation for approval and issuance of a permit based on the plans, specifications and related material shall not prevent the building official hereafter from requiring the correction of errors in plans, specifications and related material or from preventing the building from being operated in violation. The building is classified as M (mercantile) the maintenance room as S3. The structure is of Type V -N construction, fully sprinkled. We recommend approval with conditions. CONDITIONS OF CLEARANCE: 1. Final clearances and permit processing is by the Jurisdiction. 2. Separate permits are required for mechanical, sprinkler modifications, plumbing and electrical. 3. It has been assumed that the building and site are totally accessible. This will need to be validated on site by the building inspector. The construction documents • indicate accessible parking but fail to indicate if any are "van accessible" as well as an accessible route from the parking spaces to the building. If indeed this is the case the architect shall submit additional information describing the accessible route from the spaces to the building. 4. A one -hour occupancy separation is indicated on the construction documents. This separation must also be between the store and the maintenance room. This has been redlined on the construction documents. Penetrations will need to be protected as well. / 5. The check -out area inn the tool rental area will need to be accessible. The architect shall submit information on the checkout area prior to installation. 6. Special inspection is required per Section 1701 of the OSSC. The City shall review and approve special inspection firms. 7. Prior to installation of the air compressor and the electrical transformer, the structural adequacy shall be validated by the engineer of record. If the equipment weights over 400 pounds the support shall take into consideration seismic loads. DOCUMENTS TRANSMITTED: 1. Three (3) sets of architectural and structural construction documents with supportive information prepared by Omicron dated 07/02. 2. One (1) set of structural calculations by Omicron dated 09 Sep 02 3. One (1) copy of TVA report April 25, 2000 4. One (1) set of revisions by Omincron dated Novemeber 6, 2002 5. One (1) set of revisions by Scott Kemp dated January 8, 2002 SENT TO OU VIA: HAND DELIVERED By: 7n Stephen M. Winstead, Architect Winstead & Associates, Architecture and Building Code Services, PC. Copy to: Scott Kemp (f) 604 -632 -3351 • • IKr azari & ASSOCIATES, INC. • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION N ovember 18, 2002 KA No. 086 -03001 Permit No.: BUP- 2002 -00535 Mr. Kerry Swanson The Home Depot 370 Corporate Drive North Tukwila, WA 98188 FILE COPY RE: Final Letter Regarding Home Depot Tool Center Addition 14800 SW Sequoia Parkway Tigard, OR • Dear Mr. Swanson: This is to certify that, in accordance with Section 1701 of the State Building Code, we have • performed special inspections of the following items: • Reinforced Concrete • Structural Field Welding and Bolting • Epoxy Anchors All inspections and tests were performed and reported in accordance with the requirements of the approved plans, specifications and the Uniform, Building Code, and to the best of my knowledge, the work was in conformance with the applicable workmanship provisions of the State Building Code and Standards. If you have any questions or if we can be of further assistance, please do not hesitate to contact . our office at (360) 254 -3200. Respectfully submitted, • KRAZ 4 . ASSOCIATES, INC. 00 nc - ner Construction Services Manager Southwest Washington and Oregon cc: Omicron Building Department, City of Tigard With Eleven Offices Serving The Western United States 12816 NE 95`" Street • Vancouver, Washington 98682 • (360) 254 -3200 • Fax: (360) 254 -9400 Final Letter.doc