Permit CITY OF TIGARD BUILDING INSPECTION DIVISION -
24 -How Inspection Line: 639 -4175 Business Line: 639 -4171 MST ',ire
�vs BUP (iT
Date Requested ) / / AM . £PM BLD
Location )3 005 5 Lo _5P1&, Suite MEC
Contact Person Ph 793 5 y PLM 01/ y
Contractor Ph SWR
BUILDING Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation C � C C cletm j � \ FPS
Ftg Drain l SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing •� _ L _.
Insulation
Drywall Nailing �� LJ •
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Misc:
Final
PASS PART FAIL
LUMBS:1.
Post & Beam
Under Slab
Top Out
Water Service
(Sanitary Sewer,
Ram Drains
• Fi
PART FAIL
ANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk Date
Other / /' O Ins Ext
-
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
•
Date Requested /6 AM PM BLD
Location /32 r s w _Seca_ e. Suite MEC
Contact Person Ph 13 -7 5 -577 PLM v - /'�
Contractor Ph SWR
BUILDING Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation \ v `� v Jz
Drywall Nailing
Firewall 1�,
Fire Sprinkler t X L
Fire Alarm
14---- Susp'd Ceiling
Roof
Misc:
Final
PASS PART F IL
Post & Beam
Under Slab
Top Out
ater beryl
am ary Sewer
Rain Drains
Final
PASS PART FAIL>
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach/Sidewalk
Other Date /0/56 Inspector / OAT Ext
Other
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.
CITY OF TIGARD BUILDING INSPECTION DIVISION '
MST
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
BUP
Date Requested /G — Z 7 AM L. BLD
Location /3o U) S' S e% Suite MEC
Contact Person Ph 5v.4 - - S77 v v ,GV 311
Contractor Ph SWR
BUILDING Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing - 5
Insulation
Drywall Nailing
Fire wall ' f l
Fire Sprinkler } r (,�- ��J � C..
Fire Alarm
Susp'd Ceiling
Roof
Misc:
Final
PASS PART FAIL
o Beam
Under Slab
Top Out
Water Service
,farnit ry Sewer,
n urarns
Final AO
PASS PART
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hail, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk C l
Other Date ()hi) &Da Inspector Ext
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.