Permit (2) DATE: —1 5- . 1 3 PLANS CHECK NO.
PROJECT TITLE:
(42 3 LC 14 ilLe..-0#1
� I ����t,CDl�
COUNTYWIDE ►4 kn Le,
. RAFFIC IMPACT FEE
WORKSHEET APPLICANT:
orr Tntr-�61rG� - 11J LCb I i
(FOR NON - SINGLE FAMILY USES) m arefit -PDR AT rte ( *
CITYIZIIP/ /PHONE�viorOkI o q7 u3
TAP
1 uo NO l
SITES NO.ADDRESS: �{
LAND USE CATEGORY RATE PER TRIP %j '5 su J Sc( kI»!
RESIDENTIAL $ 179.00
BUSINESS AND COMMERCIAL $ 45.00 9?-0377—
(ir OFFICE $ 164.00
INDUSTRIAL $ 172.00
- INSTITUTIONAL $ 74.00
PAYMENT METHOD:
CASH/CHECK
CREDIT
BANCROFT (PROMISSORY NOTE)
INSTITUTIONAL ONLY:
DEFER TO OCCUPANCY LAND USE ATEGORY CO� ; F ' UE w S WEEKDAY AVG. E AV
7l L I C n t° DESCRIPTI V� - C tL.�L� TRIP RATE Z .i7 WEEKND I z . , G. TRIP RATE
BASIS: A O\ CGt-v\` ;5 FV D ' it e V\(DS OLV1 • 041 �� ; V�a L1 Z 4L toxic/7144 .
ca Lc . k yr 1,u1W b_t_ v,• Awe v e tt -Lli vv.
�rc.-/c`u xe `A - � ��} loc - Peer J . l l 14-kiu -ItL ` �� r v‘
rV` l(n.o1ir.
CALCULATIONS:
I I F . 5i5 At-terwlAJA40 iov\ x u &t' J 6,4 uree a 9
- x \ek-A4- uust eAelio Yy •
"Ts co.S. x ( z. Z7 x5) t (z. "57 xz) = Z , z —�'� ¶r�
—7 PROJECT . 21 2 GENERATION:
Z � 2- qu "Fir x 4 1 Ll. rn ?D 057_ 110 c FEE #11U .bC
FOR ACCOUNTING PURPOSES ONLY
ADDITIONAL NOTES:
R AD 1.)
T NSITT ' AMT.:
Zlt vb
rEKiti glnadt.Irv.,
I:TIFVVKST.DOC (DST)
"ivo 14\
July 16, 1997
CITY OF TIGARD
OREGON
Pat Tortora
Nicoli Engineering
9025 SW Center St.
Tigard, OR 97223
TRAFFIC IMPACT FEE FOR TIGARD AMERICAN LEGION
Enclosed with this letter you will find a calculation sheet showing the computation that has
been performed to determine the amount of the Traffic Impact Fee (TIF) to be paid for the
project noted above. The amount of the TIF is $170.00.
You have two payment options available to you. The first is to pay the TIF at the time you
are issued a building permit. The second is to arrange for payment over time by signing a
promissory note (if you wish to exercise this second option please contact me for additional
details). Traffic impact fees are subject to an annual increase of up to 6% if not paid or
financed prior to July 1st of each year.
Please note that you may appeal the discretionary decisions made in determining the
appropriate category and the amount of the fee based on that category. A notice of appeal
must be received by the City Recorder no later than 5:00 p.m. on July 16, 1997 and must be
accompanied by the $625.00 appeal fee required by Washington County. Although filed
with the City Recorder, an appeal would be heard by the Washington County Hearings
Officer.
If you have any questions, or if I can be of further service, please contact me at 639 -4171.
c
Bonnie Mulhearn
Development Services Technician
c: TIF file
Building file
I:,OSTSIZT1R DOT
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
' -- _ / /amip II1
COUNTYWIDE CITY OF TIGARD
TRAFFIC IMPACT FEE OREGO
PAYMENT OPTION FORM
/-110-q1 i vi.S
Date Site Address
arA AMU c al" 1 -- ((Dki 1 -2A C. •
Pr Name - Plan Check #
I realize that I must make a decision on payment of the Traffic Impact Fee (TIF) at this time. Therefore,
I request the following (choose whichever option or options are applicable):
❑ Cash or Check
❑ Credit Voucher
El Bancroft or Installment Payments •
and /or
❑ The Ordinance allows for deferral of payment of the TIF until issuance of the occupancy permit
if the TIF is greater than $5,000. If the TIF meets this requirement, I also request this option.
I understand the TIF must be paid prior to issuance of an occupancy permit. I also understand
that the TIF will be recalculated based on the prevailing rates at the time of payment. Please
be advised that TIF rates may increase up to six percent each July 1st. This rate increase is not
subject to appeal.
•
•
OWNER/APPLICANT OWNER/APPLICANT
c: Building Permit File
Payment Option Notebook
h:uogmldstsWlsub
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
COUNTYWIDE TRAFFIC IMPACT FEE
APPEAL INFORMATION •
Attached Is a copy of the Directors decision on this Traffic Impact Fee assessment or Traffic Impact Fee
Credit /Offset request.
This decision may be appealed and a public hearing held by filing a signed petition for review (appeal)
within fourteen (14) calendar days of the date written notice is provided (date mailed).
APPEAL PERIOD: Date mailed: 1- I in -11 to 5:00PM on 7 — -er
Appeal Due Date
A motion for reconsideration also may be filed within seven calendar days of the date written notice of
the decision is provided (see Section 208 of the Washington County Community Development Code). A
motion for reconsideration does not stop the appeal period(s) from running and is available only as an
extraordinary remedy for when a mistake of law or fact has occurred. A motion for reconsideration
requires a filing fee of $ 10 ZS °D
This decision will be final if an appeal is not filed by the due date(s), and a motion for reconsideration is
not granted by the Director.
The complete file is available at t t 25 6to EWA [3(J ).. i ")igaty� 02 e 2 77
for review.
A petition for review (appeal) must contain the following:
1. The name of the applicant and the relevant casefile /building permit /other development
permit number,
2. The name and signature of the petitioner filing the petition for review (appeal). If a
group consisting of more than one person is filing a single petition for review, one
individual shall be designated as the group's representative for all contacts with the
Department. All Department communications regarding the petition, including
correspondence, shall be with this representative;
3. A statement of the interest of the petitioner,
4. The date the notice of decision was sent as specified In the notice;
5. The petition for review (appeal) shall state the relevant facts, applicable ordinance
provisions, and relief sought; and
6. The fee of $625.00 for Directors decisions being appealed to the Washington County
Hearings Officer.
For further aooeal information contactIAAAJO
A form13