Loading...
Permit � MECHANICAL wPERMIT CITY OF TIGA RD F 7 ,gRp PERMT # MEC93 -0023 COMMUNITY DEVELOPMENT DEPARTMENT 9E007 / 11125SWWIBhrdP.o. Box 23397,n d,Ore0or,97'40603)4139-1115 // DATE ISSUED: 01/27/93 SITE ADDRESS...: 08770 SW SCOFFINS ST PARCEL: 2S1O2AA—O28OO SUBDIVISION • TIGARD HIGHWAY TRACTTS ZONING: CBD BLOCK LOT -26 CLASS OF WORK..:ADD FLOOR FURN EVAP COOLERS: TYPE OF USE •COM UNIT HEATERS..: VENT FANS...: OCCUPANCY GRP..:B2 VENTS W/O APPL: VENT SYSTEMS: STORIES •2 BOILERS /COMPRESSORS HOODS FUEL TYPES 0 -3 HP • DOMES. INCIN: : /GAS/ / / 3 -15 HP . COMML. INCIN: MAX INPUT:1OO000 BTU 15 -30 HP • REPAIR UNITS: FIRE DAMPERS ?..: 30 -50 HP • WOODSTOVES..: GAS PRESSURE...: 50+ HP • CLO DRYERS..: NO. OF UNITS AIR HANDLING UNITS OTHER UNITS.: FURN < 1O0K BTU: <= 10000 cfm: GAS OUTLETS.:2 FURN > =1O0K BTU:1 > 10000 cfm: Remarks: 1 FURNANCE REPLACE Owner: FEES RANDY WEST type amount by date recpt 14600 NW CONELL RD PRMT $ 25.00 JH 01/27/93 0 SPCT $ 1.25 JH 01/27/93 0 PORTLAND OR 97229 Phone #: Contractor: SUNSET FUEL CO PO BOX 42287 PORTLAND OR 97242 Phone #: 234 -0611 $ 26.25 TOTAL Rep #..: 02374 REQUIRED INSPECTIONS This permit is issued subject to the regulations contained in the Final Inspection Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. • Permittee Signature- Issued By: Call for inspection — 639 -4175 INSPECTION NOTICE City of Tigard Building • -. �:''A � 13125 SW Ball Blvd. Tigard, Oregon 9•-11W Inspection Line (Rec- O- Phone): / 639 - -4 4175 Business 'hone: 639 -4171 Inspection: -191"--'C'A.- .�v Footing Plbg. Underslab Appr /Sdwlk Found. Plbg. Top Out -- ne FINAL: Post /Beam Struct. San. Sewer Framing -Bldg. Post /Beam Mech. Rain Drain Insulation - Plumb. Plbg. Underfloor Water Line Gyp. Bd. -Mech. Date Requested: c..2 — . 2 .- in Time:" _ / AM PM Address: R Z. / . ' LOA/ � /� Permit 1: Q3 �aO Builder: -.0 / ..7t./i0...7.7 4/ .7 /10 // --. THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector: Date: 2 'v / APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE Call For Reinsp.