Loading...
Permit C ITY OF T I GA R D MECHANICAL PERMIT PERMIT #: MEC2002 -00604 DEVELOPMENT SERVICES DATE ISSUED: 12/27/02 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 PARCEL: 1S134BC -00401 SITE ADDRESS: 12442 S W SCHOLLS FERRY RD * * ** SUBDIVISION: ZONING: C -N BLOCK: LOT: JURISDICTION: TIG CLASS OF WORK: ALT FLOOR FURN: EVAP COOLERS: TYPE OF USE: COM UNIT HEATERS: VENT FANS: OCCUPANCY GRP: B VENTS WIO APPL: VENT SYSTEMS: STORIES: BOILERS /COMPRESSORS HOODS: FUEL TYPES 0 - 3 HP: DOMES. INCIN: 3 - 15 HP: COMML. INCIN: MAX INPUT: BTU 15 - 30 HP: REPAIR UNITS: FIRE DAMPERS ?: 30 - 50 HP: WOODSTOVES: GAS PRESSURE: 50 + HP: FURN < 100K BTU: AIR HANDLING UNITS CLO DRYERS: FURN > =100K BTU: < =10000 cfm: OTHER UNITS: > GAS OUTLETS: 10000 cfm: Remarks: Installation of (2) VAV boxes and and additional duct work. Project value: $14,231. Owner: FEES SISTERS OF PROVIDENCE IN OR Description Date Amount BY STEVE FOSTER [MECH] Permit Fee 12/27/02 $213.65 PORTLAND, , O R 97213 PO BOX 13993 [TAX] 8% StateTax 12/27/02 $17.09 OR Phone: Total $230.74 Contractor: HVAC INCORPORATED 5188 SE INTL WAY MILWAUKIE, OR 97222 REQUIRED INSPECTIONS Mechanical lnsp Phone: 462 -4822 Duct Inspection Reg #: LIC 50897 Final Inspection This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow rules adopted in the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -001 -00 �� _ Issued By � � ' / Permittee Signatu - Call (503) 639 -4175 by 7:00 P.M. for inspections nee th usine "d ay t . (. • Mechanical Application Date received: /a 17 pg. Permit no.: Her j pA _006 it 4o T City of Tigard R V p Project/appl. no.: Expire date: Ciryo rd Address: 13125 SW Hall B Date issued: Ecklt ` Receipt no.: Phone: (503) 639 -4171 Fax: (503) 598 -1960 'DEC 2 7 2002 Case file no.: Payment type: Land use approval: C Building permit no.: P GI ‘ OF- TIGARD / ': VPE: OF PERMIT ❑ 1 & 2 family dwelling or accessory ❑ Commercial/industrial ❑ Multi- family ❑ Tenant improvement 0 New construction 0 Addition/alteration /replacement U Other: JOB SITE INFORMATION COMMERCIAL VALUATION SCHEDULE Job address: /24h, 6'14,1 p 5 GeRy /-7. Indicate equipment quantities in boxes below. Indicate the dollar Bldg. no.: I Suite no.: /art /20 2. value of all mechanical materials, equipment, labor, overhead, Tax map /tax lot/account no.: profit. Value $ / YAW . Lot: JBlock• 'Subdivision: *See checklist for important application information and Project name: / // 4,i /604,F 809 jurisdiction's fee schedule for residential permit fee. City /county: -77t6.,f?D I ZIP: 7 3 I & 2 FAMILY DWELLING PERMIT FEE SCHEDULE D scription and location of work on premises: -Z -2v/94/ AND COMMERICAL /INDUSTRIAL EQUIPMENTSCIIEDULE g0 XLSp- Cut% Fee(ea.) Total Est. date of completion /inspection: Description Qty. Res. only Res. only Tenant improvement or change of use: -// HVAC: Is existing space heated or conditioned? l�'Yes 0 No Air handling unit CFM Air conditioning (site plan required) Is existing space insulated? &Yes ❑ No Alteration of existing HVAC system M ECHANICAL CONTRACTOR Boiler /compressors Business name: VAC a C State boiler permit no.: HP Tons BTU/H Address: S'J.f SL Si - ,,rey / L WJP Fire/smoke dampers/duct smoke detectors City: "IX/hi lt ere I ZIP: C/77.. Heat pump (site plan required) Phone: So' -I j ) Ssll1 Fax:s'o3 ,2 E - mail: Install/replace furnace/burner BTU /H Including ductwork/vent liner O Yes O No CCB no.: Install/replace/relocate heaters- suspended, City /metro tic. no.: wall, or floor mounted Name (please print): Vent for appliance other than furnace CONTACT PERSON Refrigeration: / Absorption units BTU/H Name: ` f J / Chillers HP Address:S f8 S'C i n •'4 4 j br4&YWM-4L u ''t Compressors HP Environmental exhaust and ventilation: /rfJ ,/X,i/(1 I S tate:0 _ I ZIP: 77 j ■ '? Appliance vent Phone: - 655-8 Fax: £/6a - S' E - mail: Dryer exhaust OWNER Hoods, Type 1/ IUres. kitchen/hazmat hood fire suppression system • Name: /Q7VS0,C,64CG •eqI jii 5-2)--. Exhaust fan with single duct (bath fans) Mailing address: 6�J - ji9 t.� 5- Exhaust system apart from heating or AC Fuel piping and distribution (up to 4 outlets) �T L ,4 . City: /4 f9ti+, State: pg.I ZIP: 77 R'/3 Type: LPG NG Oil Phone:Sr/3,? /S'' -(s'35- Fax: 2-/S~ OiV E-mail: Fuel i ing each additional over 4 outlets rocess piping (schematic required) Number of outlets Name. _ Other listed appliance or equipment: Address: Decorative fireplace City: I State: I ZIP: Insert type Phone: Fax I E - mail: Woodstove/pelletstove / Other: Applicant's signature: . I Date: i�R7� Other: I Name (print): DC/ BP 'Not all jurisdictions accept credit cards, please call jurisdiction for more information.' Permit fee $ /� O Visa Cl MasterCard Notice: This permit application Minimum fee $ Credit card number: / Plan review (at %) expires if a permit is not obtained Plview at % $ E within 180 days after it has been State surcharge (8 %) .... $ . Name of cardholder as shown on credit card accepted as complete. TOTAL $ � 0 • Cardholder signature Amount 440 -4617 (6400/COM) . • I' MECHANICAL PERMIT FEES COMMERCIAL FEE SCHEDULE: 1 & 2 FAMILY DWELLING FEE SCHEDULE: TOTAL VALUATION: PERMIT FEE: Description: Price Total $1.00 to $5,000.00 Minimum fee $72.50 Table 1A Mechanical Code Qty (Ea) Amt $5,001.00 to $10,000.00 $72.50 for the first $5,000.00 and 1) Furnace to 100,000 BTU $1.52 for each additional $100.00 or including ducts & vents 14.00 fraction thereof, to and including 2) Furnace 100,000 BTU+ $10,000.00. including ducts & vents 17.40 $10,001.00 to $25,00 00 $148.50 for the first $10,000.00 and 3) Floor Furnace $1.54 for each additional $100.00 or including vent _ 14.00 fraction thereof, to and including 4) Suspended heater, wall heater $25,000.00. or floor mounted heater 14.00 $25,001.00 to $50,000.00 $379.50 for the first $25,000.00 and 5) Vent not included in appliance it $1.45 for each additional $100.00 or 6.80 fraction thereof, to and including 6) Repair units $50,000.00. 12.15 $50,001.00 and up $742.00 for the first $50,000.00 and Check all that apply: :oiler Heat Air 1.20 for each additional $100.00 or For items 7 -11, see or Pump Cond f on thereof. footnotes below. Comp* ** 7) <3HP;abso a nit Minimum Permit Fee $72.50 SUBTOTAL: $ to 100K BTU. 14.00 8) 3 -15 HP. absorb 8% St -, e Surcharge $ unit 100, ' 0 500k BTU _ 25.60 9) 1 ,'' HP; absorb 25% Plan Review Fee (. subtotal) $ uni, ." -1 mil BTU 35.00 Required for ALL commercial pe • its only c 30 -50 HP; absorb TOTAL COMMERCIAL PERM ` FEE: $ , nit 1 -1.75 mil BTU 52.20 11) >50HP: absorb unit >1.75 mil BTU 87.20 12) Air handling unit to 10,000 CFM ASSUMED VALUATIONS PER APPLIA E: 10.00 Valu- Total 13) Air handling unit 10,000 CFM+ Description: Qty (Ea) Arno t 17.20 Furnace to 100,000 BTU, including 955 14) Non - portable evaporate cooler ducts & vents 10.00 ' Furnace > 100,000 BTU including 1,170 15) Vent fan connected to a single duct ducts & vents 6.80 Floor fumace including vent 955 16) Ventilation system not included in Suspended heater, wall heater or 95 . appliance permit 10.00 " floor mounted heater /f0 17) Hood served by mechanical exhaust Vent not included in applicance 5 10.00 permit 18) Domestic incinerators Repair units 805 17.40 < 3 hp; absorb. unit, 955 19) Commercial or industrial type incinerator to 100k BTU 69.95 3 -15 hp; absorb. unit, 1,700 20) Other units, including wood stoves 101k to 500k BTU 10.00 15-30 hp; absorb. unit, 501k to 1 2,310 :1) Gas piping one to four outlets mil. BTU 5.40 30 -50 hp; absorb. unit, 3,400 22 ore than 4 -per outlet (each) 1 -1.75 mil. BTU 1.00 >50 hp; absorb. unit, 5,725 Mini m Permit Fee $72.50 SUBTOTAL: $ >1.75 mil. BTU • Air handling unit to 10,000 cfm 656 8% State Surcharge $ Air handling unit >10,001,0 1,170 Non - portable evaporat- ••oler 656 TOTA RESIDENTIAL PERMIT FEE: $ Vent fan connected to a single duct 446 Vent system not included in 656 appliance permit Other Inspections and Fees: Hood served by mechanical exhaust 656 1. Inspections outside of normal business hours (minimum charge -two hours) Domestic incinerator 1,170 $72.50 per hour. Commercial or industrial incinerator 4,590 2. Inspections for which no fee is specifically indicated (minimum charge - half hour) Other unit, including wood stoves. 656 $72.50 per hour 3. Additional plan review required by changes, additions or revisions to plans (minimun inserts, etc. _ charge-one-half hour) $72.50 per hour Gas piping 1 outlets 360 Each additional outlet 63 `State Contractor Boller Certification required for units >200k BTU. "Residential A/C requires site plan showing placement of unit TOTAL COMMERCIAL $ VALUATION: i :ldsts\formstrmech- fees.doc 08/06/01 Q - C- xrs7-/1-1G SYSTEM SIZING SUMMARY System: System 4 / Block Load 3.05 Location: Portland, Oregon - November 12, 2002 'Prepared by: hvac inc Page: 1 • 'TABLE 1. SIZING DATA (COOLING) I Total Coil Load 6,860 BTU/hr Load Occurs • June 16:00 Sensible Coil Load 6,085 BTU/hr ' - Outdoor DbA1'b 88.4/67.8 F Total Zone Sensible 3,546 BTU/hr t , Coil Conditions: Supply Temperature 57.0 F Entering Db/1W • 86.2/67.7 F . Supply Air (Actual) HULM L - Leaving DbAVb 57.0/56.2 F , Supply Air (Standard) 193 CFM Apparatus De »point 55.5 F Ventilation Air 150 CFM Bypass Factor 0.050 Direct Exhaust Air 0 CFM Resulting Zone RH 64.9 % Reheat Required 0 BTU/hr Total Coil Load 0.57 Ton t to 2 Floor Area 264 sqft Sensible Coil Load 0.51 Ton • 5' (e I Overall U -Value 0.090 BTU/hr/sgft/F • SQFT/Ton • 461.84 Vent Air 0.57 CFM/sqft Cooling 25.98 BTU/hr /sq ft Vent Air 15.00 CFMUPerson Cooling 0.73 CFM/sqft TABLE 2. SIZING DATA (HEATING) i Heating Coil Load 9,642 BTU/hr Heating 36.52 BTU/hr /sq ft • • Ventilation Load 8,407 BTU/hr Heating 0.00 CFMUsgft Total Zone Load 1,236 BTU/hr Floor Area 264 sq ft Ventilation Airflow 150 CFI Overall U -Value 0.090 Zone Water Flow 0.10 gpm Vent Air 0.57 CFM/sqft Preheat Water Flow 0.68 gpm Vent Air 15.00 CFM/Person Hot Water Delta -T 25.0 F TABLE 3. INPUT DATA (WEATHER) I Location Portland, Oregon Data Source User Defined Summer Dry -Bulb 90.0 F Latitude 45.6 Degree Coincident Wet -Bulb 68.0 F Elevation 57.0 ft Daily Range 21.0 F Atmospheric Clearness # 1.05 Winter Dry -Bulb 18.0 F TABLE 4. INPUT (HVAC SYSTEM) I System Name System 4 THERMOSTAT SETPOINTS System Type CIg and Hydronic Ht Cooling (Occ.) 74.0 F System Start 6:00 Cooling (Unocc.) 78.0 F Duration 12 hrs Heating .. 70.0 F SIZING SPECIFICATIONS RETURN AIR PLENUM No Supply 57.0 F FAN Ventilation 15.00 CFMUperson Configuration Blow -Thru Exhaust • 0.00 CFI Static Pressure 1.50 in. wg. Hot Delta -T 25.0 F FACTORS Coil Bypass 0.050 Safety (Sens) 0 % Safety (Latent) 0 % Heating Safety 0 % TABLE 5. TOP TEN COOLING COIL LOADS I Time Sensible Ton Total Ton Time Sensible Ton Total Ton 1) June 16:00 0.51 0.57 6) June 17:00 0.49 0.56 2) July 16:00 0.52 0.57 7) August 15:00 0.51 0.56 3) June 15:00 0.51 0.57 8) July 17:00 0.51 0.56 4) July 15:00 0.52 0.57 9) August 17:00 0.50 0.55 5) August 16:00 0.51 0.56 10) June 14:00 0.49 0.55 • • • SYSTEM SIZING SUMMARY System: System 2 Block Load 3.05 Location: Portland, Oregon November 12, 2002 Prepared by: hvac inc Page: 1 TABLE 1. SIZING DATA (COOLING) • Total Coil Load 13,020 BTU/hr ' ' Load Occurs June 16:00 Sensible Coil Load 11,252 BTU/hr Outdoor Db/VVb 88.4/67.8 F Total Zone Sensible 7,761 BTU/hr Coil Conditions: Supply Temperature 57.0 F _ Entering Db/11b 81.6/66.4 F ` Supply Air (Actual) '4-€FM Leaving Db/Wb 57.0/56.3 F . Supply Air (Standard) 423 CFM Apparatus Dewpoint 55.7 F • Ventilation Air 195 CFM Bypass Factor 0.050 Direct Exhaust Air 0 CFM Resulting Zone RH 60.4 % Reheat Required 0 BTU/hr Total Coil Load 1.08 Ton I . ( .20o Floor Area 521 sqft _ Sensible Coil Load 0.94 Ton 1 0 3 Overall U -Value 0.090 BTU/hr/sqftfF SQFT/Fon . 480.20 Vent Air 0.37 CFM/sqft Cooling 24.99 BTU/hr/sqft Vent Air 15.00 CFM/Person Cooling 0.81 CFM/sqft TABLE 2. SIZING DATA (HEATING) I Heating Coil Load 13,348 BTU/hr Heating 25.62 BTU/hr/sqft Ventilation Load 10,929 BTU/hr Heating 0.00 CFM/sqft Total Zone Load 2,420 BTU/hr Floor Area 521 sqft Ventilation Airflow 195 CFI Overall U -Value 0.090 Zone Water Flow 0.19 gpm Vent Air 0.37 CFMUsgft Preheat Water Flow 0.88 gpm Vent Air 15.00 CFM/Person Hot Water Delta -T 25.0 F ' TABLE 3. INPUT DATA (WEATHER) Location Portland, Oregon Data Source User Defined Summer Dry -Bulb 90.0 F _ Latitude 45.6 Degree Coincident Wet -Bulb 68.0 F Elevation 57.0 ft Daily Range 21.0 F Atmospheric Clearness # 1.05 Winter Dry -Bulb 18.0 F TABLE 4. INPUT (HVAC SYSTEM) System Name System 2 THERMOSTAT SETPOINTS System Type Clg and.Hydronic Ht Cooling (Occ.) 74.0 F System Start 6:00 Cooling (L •nocc.) 78.0 F Duration 12 hrs Heating 70.0 F SIZING SPECIFICATIONS RETURN AIR PLENUM No Supply 57.0 F FAN Ventilation 15.00 CFM /person Configuration Blow -Thru Exhaust .. 0:00 CFM Static Pressure 1.50 in. wg. Hot Delta -T 25.0 F FACTORS Coil Bypass 0.050 Safety (Sens) 0 % Safety (Latent) 0 °/, Heating Safety 0 % TABLE 5. TOP TEN COOLING COIL LOADS I Time Sensible Ton Total Ton Time Sensible Ton Total Ton 1) June 16:00 0.94 1.08 6) July 17:00 0.94 1.07 2) July 16:00 0.95 1.08 7) August 16:00 0.94 1.07 3) June 15:00 0.93 1.08 8) August 15:00 0.94 1.06 4) July 15:00 0.95 1.08 9) August 17:00 0.92 1.05 5) June 17:00 0.92 1.07 10) June 14:00 0.91 1.05 . . C r - - ri"� SYSTEM SIZING SUMMARY System: VAV1 E i v so v Block Load 3.05 Location: Portland, Oregon November 12, 2002 . • Prepared by: hvac inc Page: 1 TABLE 1. SIZING DATA (COOLING) i Total Coil Load 34,869 BTU/hr " o - oad Occurs June 17:00 _ Sensible Coil Load 32,797 BTU/hr - Outdoor Db/Wb 86.9/67.4 F Total Zone Sensible 28,954 BTU/hr Coil Conditions: Supply Temperature 57.0 F Entering Db/Wb 76.3/63.9 F Supply Air (Actual) 1,580 UN' • Leaving Db/Wb 57.0/56.4 F • Supply Air (Standard) 1,577 CFM Apparatus Dewpoint 56.0 F Ventilation Air 150 CFM Bypass Factor 0.050 Direct Exhaust Air 0 CFM Resulting Zone RN 54.9 % Reheat Required 0 BTU/hr Total Coil Load 2.91 Ton '1. 1 Floor Area 538 sqft Sensible Coil Load 2.73 Ton 3 . O c - 5 Overall U -Value 0.234 BTU/hr/sgNF SQFT/Ton 185.15 Vent Air 0.28 CFM/sqft Cooling 64.81 BTU/hr/sqft Vent Air 15.00 CFM/Person Cooling 2.94 CFJVsgft TABLE 2. SIZING DATA (HEATING) ` Heating Coil Load 19,349 BTU/hr Heating 35.96 BTU/hr /sqft 1 • Ventilation Load 8,407 BTU/hr Heating 0.00 CFMJsgft Total Zone Load 10,942 BTU/hr Floor Area 538 sqft Ventilation Airflow 150 CFM Overall U -Value 0.234 Zone Water Flow 0.88 gpm Vent Air 0.28 CFM/sqft Preheat Water Flow 0.68 gpm Vent Air 15.00 CFM/Person Hot Water Delta -T 25.0 F TABLE 3. INPUT DATA (WEATHER) - Location Portland, Oregon Data Source User Defined Summer Dry-Bulb 90.0 F Latitude 45.6 Degree Coincident Wet-Bulb 68.0 F Elevation 57.0 ft Daily Range 21.0 F Atmospheric Clearness q 1.05 Winter Dry-Bulb 18.0 F TABLE 4. INPUT (HVAC SYSTEM) I System Name VAV1 THERMOSTAT SETPOINTS System Type CIg and Hydronic Ht Cooling (Occ.) 74.0 F System Start 6:00 Cooling (Unocc.) 78.0 F Duration 12 hrs Heating 70.0 F SIZING SPECIFICATIONS RETURN AIR PLENUM No Supply 57.0 F FAN Ventilation 15.00 CFMlperson Configuration Blow -Thru Exhaust 0.00 CFM Static Pressure 1.50 in. wg. Hot Delta -T 25.0 F FACTORS Coil Bypass 0.050 Safety (Sens) 0 % Safety (Latent) 0 % Heating Safety 0 % TABLE 5. TOP TEN COOLING COIL LOADS I Time Sensible Ton Total Ton Time Sensible Ton Total Ton 1) June 17:00 2.73 2.91 6) May 17:00 2.63 2.76 2) July 17:00 2.73 2.88 7) August 16:00 2.55 2.71 3) June 16:00 2.61 2.78 8) May 16:00 2.52 2.64 4) July 16:00 2.62 2.78 9) June 15:00 2.38 2.55 5) August 17 :00 2.61 2.77 10) July 15:00 2.39 2.54 • SYSTEM SIZING SUMMARY System: System 3 Block Load 3.05 Location: Portland, Oregon November 12, 2002 . 'Prepared by: hvac inc Page: 1 TABLE 1. SIZING DATA (COOLING) J Total Coil Load 7,042 BTU/hr toad Occurs June 16:00 Sensible Coil Load 6,132 BTU/hr " !door Db/11 b 88.4/67.8 F Total Zone Sensible 4,573 BTU/hr Coil Conditions: I Supply Temperature 57.0 F Entering Db/Wb . • 81.1/66.2 F • Supply Air (Actual) 236 CFNI Leaving Db/Wb 57.0/56.3 F Supply Air (Standard) 235 CFM - Apparatus Dewpoint 55.7 F Ventilation Air 90 CFM Bypass Factor 0.050 Direct Exhaust Air 0 CFM Resulting Zone RH 57.2 % Reheat Required 0 BTU/hr Total Coil Load 0.59 Ton . Floor Area 450 sqft Sensible Coil Load 0.51 Ton Overall U -Value 0.090 BTU/hr/sqft/F' SQFT/fon 766.82 Vent Air 0.20 CFM/sqft Cooling 15.65 BTU/hr /sqft Vent Air 15.00 CFM/Person Cooling 0.52 CFM/sqft • TABLE 2. SIZING DATA (HEATING) Heating Coil Load 7,150 BTU/hr Heating 15.89 BTU/hr /sqft ' . Ventilation Load 5,044 BTU/hr Heating 0.00 CFMUsgR Total Zone Load 2,106 BTU/hr Floor Area 450 sqft Ventilation Airflow 90 CFM Overall U -Value 0.090 Zone Water Flow 0.17 gpm Vent Air 0.20 CFMJsgft Preheat 1Vater Flow 0.41 gpm Vent Air 15.00 CFMUPerson Hot Water Delta-T 25.0 F TABLE 3. INPUT DATA (WEATHER) Location Portland, Oregon Data Source User Defined Summer Dry-Bulb 90.0 F Latitude 45.6 Degree Coincident Wet -Bulb 68.0 F Elevation 57.0 ft Daily Range 21.0 F Atmospheric Clearness ti 1.05 Winter Dry -Bulb 18.0 F TABLE 4. INPUT (HVAC SYSTEM) I System Name System 3 THERMOSTAT SETPOINTS System Type Clg and Hydronic lit Cooling (Occ.) 75.0 F System Start 6:00 Cooling (Unocc.) 78.0 F Duration 12 hrs Heating 70.0 F SIZING SPECIFICATIONS RETURN AIR PLENUM No Supply 57.0 F FAN Ventilation 15.00 CFMVperson Configuration Blow -Thru Exhaust 0.00 CFM - Static Pressure 1.50 in. wg. • Hot Delta -T 25.0 F FACTORS Coil Bypass 0.050 • Safety (Sens) 0 % Safety (Latent) 0 % %, Heating Safe % 0 % TABLE 5. TOP TEN COOLING COIL LOADS Time Sensible Ton Total Ton Time Sensible Ton Total Ton 1) June 16:00 0.51 0.59 6) July 15:00 0.51 0.58 2) July 16:00 0.52 0.58 7) August 16:00 0.50 0.57 3) June 17 :00 0.51 0.58 8) August 17 :00 0.50 0.57 4) July 17:00 0.51 0.58 9) August 15:00 0.50 0.57 5) June 15:00 0.51 0.58 10) June 14:00 0.49 0.56 • CITY OF TIGARD 24 -Hour BUILDING Inspection yne: (503) 639 -4175 q) INSPECTION DIVISION Business Line: (503) 639 -4171 / BUP • Received Date �/Z6/ O- AM PM BUP Location id Suite 44330 (7 Oa, 0 7 Contact Person Pi4 ) _ PLM Contractor Ph ( ) SWR BUILDING Tenant/Owner ELC Footing Foundation ELC Access: Ftg Drain ELR Crawl Drain Slab Inspection Notes: SIT Post & Beam Shear Anchors Ext Sheath/Shear Int Sheath/Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Other: Final PASS PART FAIL PLUMBING 0) 1161 • Post & Beam :(} Under Slab Rough -In Water Service Sanitary Sewer Rain Drains Catch Basin / Manhole Storm Drain Shower Pan Other: Final 4 PAA • • ` FAIL •os & Beam Rough -In Gas Line S Dampers Final ART FAIL RICAL Service Rough -In UG/Slab Low Voltage Fire Alarm Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. PASS PART FAIL SITE [] Please call for reinspection RE: Unable to inspect — no access Fire Supply Line ADA Approach/Sidewalk Date ?' / �� 3 Inspector v Ext Other: Final DO NOT REMOVE this inspection record from the job site. PASS PART FAIL