Loading...
Permit CITY OF TIGARD 24 -Hour BUILDING Inspection -.ine: (503) 639 -4175 INSPECTION DIVISION f Business Line: (503) 639 -4171 MST BUP Received �3 3 1 S( e Requested 1 i � D 3 AM PM BUP Location ,' Z 4 1 ( -1 Z ,� c v 1t S 7- VVV- Suite I (J) MEC Contact Person pt) l�1 Ph ( 'WO - 7. 2 )5_5 PLM Contractor - f — ' l'CYYI Ph ( ) Ir n SWR BUILDING Tenant/Owner j )� v • ,e44,1 ITT - • l CI'.1 -2 _ ELC Footing Foundation Access: Drain ELR C_.L J ?, 9_3 Crawl Drain Slab Inspection Notes: SIT Post & Beam Shear Anchors Ext Sheath/Shear Int Sheath/Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler - r • - Air — _40 Fire Alarm Susp'd Ceiling Roof Other: Final PASS PART FAIL ZTh PLUMBING Post & Beam Under Slab 1 Rough -In Ofi /42, Water Service Sanitary Sewer Rain Drains Catch Basin / Manhole Storm Drain Shower Pan Other: Final PASS PART FAIL MECHANICAL Post & Beam Rough -In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough -In UG/S ow Volta arm • Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. AMMO PART FAIL SITE El Please call for reinspection RE: Unable to inspect — no access Fire Supply Line / ADA Approach/Sidewalk Date - J If / 9 (2 3 Inspector Ext Other: Final DO NOT REMOVE this inspection record from the job site. PASS PART FAIL