Loading...
Correspondence ;1 August 24, 2000 CITY OF TI GARD Carlson Testing OREGON PO Box 23814 . Tigard, Oregon 97223 PERMIT NO: BUP2000 -00270 SIT 2000 -00031 OWNER: William Davidson • PROJECT ADDRESS: 12394 SW Scholls Ferry Road — Tigard, Oregon PROJECT DESCRIPTION: New Auto Repair Facility TYPES OF SPECIAL INSPECTION: As setout on the enclosed forms The owner has notified us that he /she will retain your services to perform Special Inspections in accordance with the provisions of the State Building Code, permit documents and special inspection requirements. The owner or the owner's agent must also confirm with you that they have authorized you to do the special inspection work. As the regulatory agency, the City requires that you do the following: 1. Submit copies of all inspection reports promptly to the building division, Architect, engineer, and the:contractor. 2. Maintain one copy of each field report at the job site. 3. • Submit a final report at the completion of each category of work that you Inspect. (See UBC Appendix Chapter 13 for soils special inspection final report requirements.) If you fail to comply with the above requirements, there may be cause for the City to revoke your authority as special inspector for this job. . • . Should you have any questions, please call me at (503) 639 -4171 X 392. Singerely, • Ro rt D. Poskin, C.B.O. Seni Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 . TDD (503) 684 -2772 CITY OF TIGARD A Program for Inspection Services and /or Material Testing City of Tigard: 7 -5C Site Permit # 2,6190 - aoo 3 BUP# 2000 -00270 Project Title: Scholls Auto Repair Address: 12394 SW Scholls Ferry Road Architect of Record: Phone: Address: Structural Engineer of Record: VLMK Engineers Phone: 624 -7100 Address: 7070 Fir Loop Suite #100, Tigard, OR. 97223 GI Geo- Technical Engineer of Record: Carlson Testing Phone: 684 -3460 Address: PO Box 23814, Tigard, OR. 97223 Provide the following information for the testing agency chosen to provide inspection services and/or testing. * Testing Agency: Carlson Testing Phone: 684 -3460 Address: PO Box 23814, Tigard, OR. 97223 The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. * "Notice" Special Inspection reports shall not preclude the need to have City of Tigard inspection approval on all re -bar placement. Signature of Owner: eaD On1 �' /i�,� 0 Phone No. Date: rDSo Print Name: g Company Name: The following is a list of special inspection and/or services required by the 1998 Oregon Structural Specialty Code and Tigard Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo- Technical Engineer of Record are as follows: Geo -Tech Observation •Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. •Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 17013 to the building official. • • • I • • CITY OF TIGARD A Program for Inspection Services and /or Material Testing • . ; City of Tigard: 7 -5C . Site Permit # BUP# 2000 - 00270 . Project Titl Scholls A uto Repair Address: 1.294 SW Sci)ulls Ferry Road Architect of?Record: Phone: Address: i Structural �ngineer of :i'tecord: VLMK Engineer ,.. Phone: 624-7100 Address: 7 70 Fir Loop Suite #100, Tigard, OR-V223 Geo- Techni Engie•': of Record: Carlson Testing Phone: 684 -3460 Address: PO Box 2381..1; Tigard, OR. 97223 Provide the following ir. :; vrmation for the testing agency chosen to provide inspection services and/or testing. * Testing Aiency: (�'.`'� T TY Phone: G8s 19f Address: "0 1 ?- 3 " - 7i d 072- 23 . The owner c ertifles thsr l :the above noted Agency has been employed to conduct the special . inspections dr observat...ins required herein. * "Notice "6ecialInsp: :•:t/on reports shall not preclude the need to have City of Tigard Inspection - approval on x11 re-bar p :vicenten 4 • . Signature ot7Owner: `� Phone No: Gla Date: 8/ /40 I . G 3 5��o Print Name jjC� //;! 00//4499 Company Name: 7:1617,,f3 •/ /jj i The followinn is a list or special Inspection and/or services 'required by the 1998 Oregon Structural Specialty Code and Tigard Municipal Code 14.06.010 through 14.06.040. The special inspections :and/or testing services required for this project to be provided by the Testing Agency, Stctural Engineer or Geo- Technical Engineer of Record are as follows: L Structural Masonry; 2. Concrete' 3 Structurl Steel . • •SpLcial Inspe. :¢ors for the Testing Agency shall be qualified, to the satisfaction of the uilding ' ffticial, for inspections of the particular type of construction or ope tion. • i •Special inspe :: tors shall observe the work assigned herein for conformance with the ipproved 1: fans and specifications and, submit copies of all inspection reports and,i a final sig .ed report in accordance with OSSC, Section 17013 to the building offclal. . • Z0 39Vd NOSQUIGQ9M 0S9b6E9 Tb :80 000Z/bZ/80 • 5 I T o - cJCrc 3 SITE PLAN REVIEW -hyyT 1 ' COMMENTS ��� C ITY OF TIOARD Community Development Shaping A Better Community Date: — ri 20 1 Z000 Staff Person Commenting: x 1 g Departments N Phone Numhar /Extension: '?» Project Name: +ov re_444, k-cr7 Perp„a— Site Permit ri '--■- z — ? . Land Use Case Fit:; NofsI spy ZAuo — oco l <.:THE PRPPO PLANc SUBMITTED FORA ;S1TE PERMIT:tIAVE BEEN REVIEWED; BY - 01.: R DEP_AR'i MENT AND WE HAVE THE FOLLOWING CO? 1 L11T_S; ❑ Plans am approver:. All land use conditions related to this department haws been ^rsf;ictcrily met. V Plans are generally consistent with the land use approval, but them ire still land use r:. ;!eitions that must be met prior to release of the site ano:o- Lzi7t' :ng hermit, or prior to a final building inspection. S: , :ivtic ;.:ly, - - - Nate .• 4 MAP (SS A r kJ Pep otJ SN.45. - G. ?? -- - • 101 5 l = $ SO . Oo -- [' I'r.:.s are NOT consistent with the land use approval and mt.st be r ^.v ; s 3d. Sper_ irically, ❑ Revised plans are approved. NOTE: IF THE PERMIT APPLICANT HAS ANY QUESTIONS WITH REGARD TO THE COMMENTS ABOVE, THEY MUST CONTACT THE STAFF PERSON SPECIFIED AT THE TOP OF THE PAGE. • i:\brianAmasters\siteplan.frm