Loading...
Correspondence Fri* Northwest Geotech, Inc. 9120 SW Pioneer Court, Suite B • Wilsonville, Oregon 97070 503/682 -1880 FAX: 503 / 682 -2753 December 30, 2002 Project No. 1053.46.2 City of Tigard Building Division 13125 SW Hall Blvd. Tigard, Oregon 97223 Attention: Building Division Subject: Final Report of Special Inspection VoiceStream — Greenway Tower Site 12394 SW Scholls Ferry Rd. Tigard, Oregon Permit No.: BUP 2002 -00249 To Whom It May Concern: As requested, Northwest Geotech, Inc., (NGI) has provided special inspection for the VoiceStream - •Greenway Site. Our special. inspection services. included the following activities: • • • - • Soils • Foundation Bearing Conditions • Structural Backfill Placement Reinforced Concrete • Concrete Placement • Reinforcement Placement • Fresh Properties Testing • Embedment and Anchor Placement • Structural Masonry • Block Layment • Mortar and Grout Placement • Embed and Anchor Placement • Material Verification A complete record of our inspection reports has been forwarded to the project team and the City of Tigard Building Division. To the best of NGI's knowledge, based on our inspections, the structural aspects of the subject project have been constructed in substantial conformance with the approved drawings, specifications, applicable provisions of the Uniform Building Code and /or the • inspection • methodology and acceptance criteria established : by : the • project ' designer(s). . . . C:\My Documents\Docs\1000- 109911053-46 -2 Final Report.dodmkl Ff ' This opportunity to be of service is sincerely appreciated. Should you have any questions, please contact the undersigned. Respectfully submitted, NORTHWEST GEOTECH, INC. i ntjtt6, Thomas S. Ginsbach, P.E. President Copies: (1) Addressee (1) Dave Fisher, VoiceStream Wireless, Inc. (1) Tom Fowler, Miller Consulting Engineers (1) Cole Graves, Site Tech (1) Jim Jarrett, Valmont Microflect • -2- J Northwest Geotech, Inc. 12/20/2002 13:02 FAX Iit1002 • /0 9 valmontV MICROFLECT • Mr. David Fisher, Concerning the "Greenway -SUV P003932D Project, Valmont Communications sales order 15700 -02. I hereby certify on this day 12/20/02 that all welding on this project was done in our Salem Facility by certified welders. All welders in our facility are certified to A.W.S. D1.1 Structural Welding Code (2002 edition). All welds were 100% visually inspected under the direction of Certified Welding Inspectors. Certified Welding Inspectors: Peter L. Fredrickson A.W.S. Certificate #88120051. Barry J. Hutchins A.W.S. Certificate #01110013. Peter L. Fredrickk 1%4.4, 861., Quality Assurance Manager pete,Fredr'ietc�ax Valmont Communications extoorg 3575 25 St. S.E. N O w u / Salem OR 97302 i Ph. (503)315 -4551 E -mail petef @valmont.com