Loading...
Correspondence ' 4 02 '01 02 :20PM VLMK ENGINEERS P.2 /2 :-=___ __ _ -= VLMK Consulting Engineers PRINCIPALS 7 1 ALFRED H. VAN DOMELEN, PE 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201 -4393 JAMES E. KNAUF. P.E. - ;- - -` . (503) 222.4453 / FAX (503) 248 -9263 / email: vlmk @vimk.com GREGORY J. &CEFGEN, PE HAVLIN G. KEMP, P.E. . JOHN T. BROOKS FIELD REPORT ASSOCIATES KEVIN M. KAPLAN. P.E. Date: December 28, 2000 Job No: 200180 Project: TOC Office Addition Permit No: BUP2000 -00364 Address: 6825 SW Sandburg Rd. contractor: Perlo McCormack Pacific Location: Tigard, OR owner: TOC Management Services Weather. Overcast TemplTime: 45° at 3:00 p.m. Present at Site: Dean Hickock, Perlo McCormack Pacific Kevin M. Kaplan, VLMK Consulting Engineers I was on site to inspect the framing construction for the above - mentioned project. Lower level exterior and interior wall framing is in progress. Concrete foundation walls and slabs are essentially complete. • The beam to post connection of the 5 -1/4 x 9 -1/4 PSL beams at the southwest corner of the atrium at gridlines Ex and D.25 can be done with a Simpson EPC66 -16 or approved equal. The PSL beam can bear on the top of the 6 x 6 post as discussed. . • The 5 -1/4 x 9 -1/4 PSL beams at the southeast and southwest corners of the atrium are acceptable for the increased span of approximately 8' -6 ". This span was originally approximately 7' -0" but needs to be revised to make the interior wall finishes work as discussed. • The existing 12" TJI joists between gridlines Ex and A shown to remain, were removed during demolition. These can be replaced with new 11 -7/8" TJI joists spanning north and south at 16" on center. An 1 -1/4 x 11 -7/8 timberstrand ledger should be nailed to the existing wall studs with (6) 16d nails at each stud. • At gridline 1.4 and Ex, a 6 x6 post is required to support the 5 -1/4 x 11 -7/8 PSL. This post should continue down to the foundation below. PHD5 holdowns can be used as shown in Detail 10 on sheet S4.1 for the east / west shearwall. • At gridlines Ex 6 at gridline D.5 it is acceptable to remove the few remaining existing 12" TJI joists and replace with 11 -7/8" TJI's at 16" on center spanning north / south as discussed. Subm '-i By: FILE COPY Amato' • - OF TIGARD Kevin M - ► Ian, P.E. Approved �........�.�.......( ): VLMK r onsu ing Engineers Conditionally Approved ............ ( ): cc: ■ ' k • ' igard, Building Department For onl t v ull�? diib� d o 0 .2,47.4( .2,47.4( Perlo McCormack Pacific PERMI T N0 .00 4. See Letter to: blow ••••••••••• . ( ): a� Ankrom Moisen Architects ( ): _ o E ; • Job Addredt , 'SO.) . 1 C d K:\Field Reports \TOC Office Addn Rev. 12-28-00.Doc Date: C O y MEMBER ?� JAI'. 02 '01 02 :20PM VLMK ENGINEERS P.1 /2 r" __=V ...- -, VL NIK Consulting Engineers - _ � 3933 SW KELLY AVE. / PORTLAND, OR 97201393 3 ' ' I (503) 222 -4453 / FAX 248 -9263 PAX TRANSMITTAL (Please call 222 -4453 if all pages are not received) TO: , M r? M Mo ISArJ "( c}i- : ro_crS DATE: J A rN 2 , 2001 ATTN: Ea-c: Fe.- SL)P N U FROM: -- --- 4 / ('J LGA-PL -P PROJECT: -T2C-- 'I L c-E 4".-41) 1T1 NO. OF PAGES TO FOLLOW: i URGENT, PLEASE HAND DELIVER C--.. COPY TO FOLLOW IN MAIL N _ COMMENTS: rQx. @ 245 -11 Icz::. - ' I , _ ,' _.... I 1 , 1i i .._._ i .. I .. I .. j - _ *Id P.1 P.1 ks V is P _ u? .. - ..P... 7-~1 1 -- l i x J�I� ,. , : ^s. i D 15 't- P tour 1s rill 1.-T. al I . ._ _ ., - _' • , . _ +_ 1 . . , • - ' - - - - I . .. . .. . . .. _ ..1.1.1_ 1 I r � � _. i 1 I i 1 - - - - -- .... i _. I , . -rt— -... -" . .. _.. - - - f i 1 II 1 mo ' -� _ r - i . � l... i . l � � l i i r I I 1- . .. L_ .. ..Tm. .. ,.4. p.,..._ ..„..L. ..,.„..,. .„ L_ _ . . _ . ., , .: _4_4_ _._ ... . . ___]____L_ - -. . _. _' .. ; I _. I_..... i .__ _ I�I� _i _. 1 • • 4 - - ..1 • -1-1-- - - - • • • - . - 1 _ . _.. i 1 I _ I I _ . I .... . _._J-- -. , . _.... ; ...... _ . ... • .. ,. . 1 [ . - - • : r SETTING THE STANDARD FOR SERVICE EXCELLENCE • Facsimile To: Kevin Kaplan Company: VLMK Consulting Engineers Phone: 503 - 222 -4453 Fax: 503 - 248 -9263 From: Robert Poskin, CET, CBO, Senior Plans Examiner • Company: City of Tigard Phone: (503) 639 -4171 X 392 Fax: (503) 684 -7297 Date: 01/03/01 • Pages including this page: 2 COMMENTS: Kevin: Attached should be forwarded to the job site and be affixed to the approved plans City of Tigard, 13125 SW Hall Blvd., Tigard, OR 97223 ** PLEASE DELIVER THIS FAX IMMEDIATELY ** ihk t„.,, September 19, 2000 CITY OF TIGA Ankrom Moison Associates Architects OREGON 6720 SW Macadam — Suite #100 Portland, Oregon 97219 RE: TOC Management Building BUP# 2000 -00364 6825 SW Sandburg Occupancy: `B" Construction: "VN" Allowable: 8000(2) 16000 (2) 3 sides- Total 32000 Dear Applicant: Your plans have been reviewed for compliance; the following items require your attention: Energy Code: Provide Oregon non - Residential Energy Code forms 5a through 5c, and related work sheets. Special Inspections: Provide the information highlighted in yellow and return forms to this writer. Drawings: Provide three (3) full sets of Architectural and structural drawings for issuance of your permit. If you have questions, please call me at 639 -4171 X392 Sincerely, Ro ert Poskin, CBO Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 CITY OF TIGARD A Program for Inspection Services and/or Material Testing City of Tigard: Building Permit # 2000 -00364 Project Title: TOC Management Building Address: 6825 SW Sandburg Street, Tigard, Oregon Architect of Record: Ankrom Moison Associated Architects Phone: 245 -7100 Address: 6720 SW Macadam, Suite 100, Portland, Oregon 97219 Structural Engineer of Record: VLMK Consulting Engineers Phone: 222 -4453 Address: 3933 SW Kelley Avenue, Portland, Oregon 97201 Geo- Technical Engineer of Record: Phone: Address: Provide the following information for the testing agency chosen to provide inspection services and/or testing. * Testing Agency: Address: The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. * "Notice" Special Inspection reports shall not preclude the need to have City of Tigard inspection approval on all re -bar placement. Owner: Phone: Print Name: Company Name: Address: The following is a list of special inspection and/or services required by the 1998 Oregon Structural Specialty Code and Tigard Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo - Technical Engineer of Record are as follows: 1. Reinforced Concrete 2. Structural Steel 3. A325 Bolting 4. Concrete Drilled A.B. 5 Concrete Epoxy Anchors •Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. •Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official. CITY OF TIGARD A Program for Inspection Services and/or Material Testing City of Tigard: Building Permit # 2000 -00364 Project Title: TOC Management Building Address: 6825 SW Sandburg Street, Tigard, Oregon Architect of Record: Ankrom Moison Associated Architects Phone: 245 -7100 Address: 6720 SW Macadam, Suite 100, Portland, Oregon 97219 Structural Engineer of Record: VLMK Consulting Engineers Phone: 222 -4453 Address: 3933 SW Kelley Avenue, Portland, Oregon 97201 Geo- Technical Engineer of Record: Phone: Address: Provide the following information for the testing agency chosen to provide inspection services and/or testing. * Testing Agency: VLMK Consulting Engineers Address: 3933 SW Kelley Avenue, Portland, Oregon 97201 The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. * "Notice" Special Inspection reports shall not preclude the need to have City of Tigard inspection approval on all re -bar placement. Owner: Phone: Print Name: Company Name: Address: The following is a list of special inspection and /or services required by the 1998 Oregon Structural Specialty Code and Tigard Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo- Technical Engineer of Record are as follows: 1. Structural Observation *Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. •Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official. ( I 4,\,, - October 2, 2000 • CITY OF TIGAR Carlson Testing • 8430 SW Hunziker Avenue OREGON Tigard, Oregon 97223 - - PERMIT NO: BUP# 2000 - 00364 OWNER: TOC Management Building PROJECT ADDRESS: 6825 SW Sandburg, Tigard, Oregon 97223 ' PROJECT DESCRIPTION: Office Building TYPES OF SPECIAL INSPECTION: As setout on the enclosed form The owner has notified us that he /she will retain your services to perform Special Inspections in accordance with the provisions of the State Building Code, permit documents and special inspection requirements. The owner or the owner's agent must also confirm with you that they have authorized you to do the special inspection work. As the regulatory agency, the City requires that you do the following: 1. Submit copies of all inspection reports promptly to the building division, Architect, engineer, and the contractor. 2. Maintain one copy of each field report at the job site. 3. Submit a final report at the completion of each category of work that you Inspect. (See UBC Appendix Chapter 13 for soils special inspection final report requirements.) - If you fail to comply with the above requirements, there maybe cause for the City to revoke your authority as special inspector for this job. Should you have any questions, please call me at (503) 639 -4171 X 392. Sincerely, Robert D. Poskin, C.B.O. Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • CITY OF TIGARD A Program for Inspection Services and /or Material Testing City of Tigard: Building Permit # 2000 -00364 Project Title: TOC Management Building Address: 6825 SW Sandburg Street, Tigard, Oregon Architect of Record: Ankrom Moison Associated Architects Phone: 245 -7100 Address: 6720 SW Macadam, Suite 100, Portland, Oregon 97219 Structural Engineer of Record: VLMK Consulting Engineers Phone: 222 -4453 Address: 3933 SW Kelley Avenue, Portland, Oregon 97201 Geo- Technical Engineer of Record: Geo Design Phone: (5 0 3) 9 6 8 — 8 7 8 7 Address: 17400 Upper Boones Ferry Road, Suite 230 Portland, Oregon Provide the following information for the testing agency chosen to provide inspection services and/or testing. * Testing Agency: VLMK Consulting Engineers Address: 3933 SW Kelley Avenue, Portland, Oregon 97201 The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. * "Notice" Special Inspection reports shall not preclude the need to have City of Tigard inspection approval on all re -bar placement. • Owner: Phone: (5 0 3) 6 2 0 —1710 Print Name: Jay H. Seeley, r. Company Name: TOC Management Address: 6825 SW Sandburg Services Tigard, Oregon 97223 ' The following is a list of special inspection and/or services required by the 1998 Oregon Structural Specialty Code and Tigard Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo - Technical Engineer of Record are as follows: 1. Structural Observation •Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or . operation. •Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official. • eenwood Brian Greenwood Tuesday, July 25, 2000 2:35 PM 'matts @ci.tigard.or.us' Dave Vonada; Mike Cline; 'bhncl @teleport.com' Subject: TOC Management Services Addition RE: TOC Management Services, 6825 SW Sandburg St, Tigard—Design Review Submittal Matt, Please allow me to clarify the square footage numbers represented in the submitted design review narrative and site plan. While I understand your confusion and sincerely apologize, I believe I can explain the figures. A critical line item is missing from the square footage totals listed on the site plan: "Overall Square Footage -New ". This would be 'area proposed° (8,815 SF) added to the "atrium area' (2,130 SF), which equals 10,945 SF and corresponds with the 'approximately 11,000 sq. ft.' of addition as quoted in Section 18.360 of the narrative. At the time of the design review submittal, were considering the atrium area as a seperate area of square footage to be calculated from the rest, though it clearly is intended to denoted as 'new" square footage. Also, the "existing area" calculation listed on the plan, 12,365 SF, corresponds with the °approximately 12,400 sq. ft." listed in the narrative. Allow me also to clarify the 'updated' figures which I sent to you yesterday. You may have been confused to see square footages which appear different from those submitted for design review. First, please note that these calculations were made several weeks after design review documents were submitted, so they reflect the slight modifications to the plans which occurred during those weeks. Second, the critical numbers here which correspond with the design review submittal are 7,041 and 4,320, the 'New Only° numbers, which equal 11,361 sq. ft. (in line again with the ° approximately 11,000 sq. ft.° in the narrative). Here, however, I calculated a second number, mostly for benefit of the contractor, which reflects the areas In the existing building which are being partially demolished and are thus to become "new'. Here the numbers 1,699 and 1,994 (equal to 3,693) represent the areas of "overlap ", where existing building area is being made "new °, which is where the figure 15,054 sq.ft. is established. This is not Intended to reflect a drastic change in new square footage, but rather to demonstrate the total SF area in which the contractors work is to occur. I greatly appreciate your understanding in clearing up this matter. There has been no attempt on our part to mislead or change in any way the scope of the project as presented to you for review. I again apologize for the confusing figures and will gladly issue any clarification you might require In order to avoid any delay in your review process. Also, should you wish, I would be happy to meet with you to discuss this or any other facet of this project. Please contact me should you have any additional questions. Sincerely, Brian Greenwood Ankrom Moisan Associated Architects Brian G. Greenwood . Anlcom Mdsan Associated Architects 6720 SW Macadam, Suite 100 Portland, Oregon 97219 503245.7100 / FAX 503245.7710 503.977.5205 (direct) briang @amaa.com 1 __ VLMK Consulting Engineers PRINCIPALS - 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201 -4393 ALFRED H. VAN DOMELEN, P.E. = — — JAMES E. KNAUF, P.E. (503) 222 - 4453 / FAX (503) 248 - 9263 / email: vlmk @vimk.com GREGORY J. BLEFGEN, PE. HAVLIN G. KEMP, P.E. ` JOHN T. BROOKS • ,., " F KEVIN M. KAPLAN, P.E. / %• \► • , • ' ASSOCIATES CHRIS M. PALMATEER BILL G. LAMBERT FILE COPY .. City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 -8199 Attention: Building Department Re: TOC Management Office Building, 6825 SW Sandburg, Tigard, OR Permit No. BUP2000 -00364 Gentlemen: This is to certify that in accordance with Section1702 of the State Building Code and Chapter24.20, Title 24, our office has performed structural observations for the above - mentioned project. Special inspections have been performed by the special inspection agency of Carlson Testing, Inc. with periodic structural observations performed by VLMK Consulting Engineers. • . All structural inspections and structural observations were performed and reported according to the requirements and to the best of our knowledge the work was in conformance with the approved plans and specifications. . Please feel free to contact me at (503) 222 -4453 should you have any questions, comments and /or concerns. S'ncer- , 4/ in K= in M. aplan, P.E., S.E. Pr ncipal VL 0 • _ insulting Engineers cc: Roger A. Superneau, Ankrom Moisan Associated Architects KMK:jjs ....1 E lv e s • C 0 E o V 4 C O p N c0' K: \Letters \TOC 4- 10- 01.doc MEMBER • APR 10 '01 10 :45AM VLMK ENGINEERS P.1 /1 VLMK Consulting Engineers PRINCIPALS • _ _ 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201 -4393 ALFRED H. VAN DOMELEN, RE . . = JAMES E KNAUF, P.E. (503) 222 -4453 / FAX (503) 248 -9263 / email: vlmk®vImk.com GREGORY J BLEFGEN, RE. HAVLIN G. KEMP, P.E. JOHN T. BROOKS KEVIN M. KAPLAN, RE, April 10, 2001 ASSOCIATES CHRIS M. PALMATEER BILL G. LAMBERT • l City of Tigard t c�P 13125 SW Hall Blvd_ Tigard, OR 97223 -8199 • Attention: Building Department Re: TOC Management Office Building, 6825 SW Sandburg, Tigard, OR Permit No. BUP2000 -00364 • Gentlemen: This is to certify that in accordance with Section1702 of the State Building Code and Chapter 24.20, Title 24, our office has performed structural observations for the above - mentioned project. Special inspections have been performed by the special inspection agency of Carlson Testing, Inc. with periodic structural observations performed by VLMK Consulting Engineers. • All structural inspections and structural observations were performed and reported according to the requirements and to the best of our knowledge the work was in conformance with the approved plans and specifications. Please feel free to contact me at (503) 222 -4453 should you have any questions, comments and /or concerns. S•ncer- , „O► K; in M. aplan, RE., S.E. Pr ncipal VL ' - - • nsulting Engineers cc: Roger A. Superneau, Ankrom Moisan Associated Architects KMK:jjs i v C 0 f s �o N K: \Letters \TOC 4.10-01.doc MEMBER VLMK Consulting Engineers PRINCIPALS =- 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201-4393 ALFRED H. VAN DOMELEN, P.E. JAMES E. KNAUF, P.E. - = (503) 222 - 4453 / FAX (503) 248 - 9263 / email: vlmk@ I1 EC ET ,� TL* - EG G. J BL PE. N, P.E. J l HN T. BROOKS NOV 2 9 ( V L• 2000 FIELD REPORT A BY: VIN M. KAPLAN, P.E. Date: �' f 1• , � . - Job No: 200180 Project: " • -0 Permit No: BUP2000 -00364 Address: 6825 SW Sandburg Rd. Contractor: Perlo McCormack Pacific Location: Tigard, OR Owner: TOC Management Services Weather: Clear Temp/Time: 65° at 3:00 p.m. Present at Site: Dean Hickcock, Perlo McCormack Pacific; and Kevin M. Kaplan, VLMK Consulting Engineers I was on site to inspect the foundation formwork and reinforcing construction for the above - mentioned project. Interior footings have been poured and exterior footings are being excavated and formed. The following was noted: • As discussed at the job site, a new 6 x 6 column is required at the end of the new shear wall along gridline EX at the southwest portion of the building. The new wall running east/west along gridline D.25 has been constructed. A new footing needs to be poured under this east/west shear wall prior to demolishing the existing column and slab and constructing the north /south shear wall. After this new footing is in place, demolition can proceed on the • spread footing for the new 6 x 6 column and holdown. Please refer to our R.F.I. 5 for additional information. • Also as discussed at the job site, drilled expansion anchors and /or epoxy anchors can be substituted for embedded J bolts. For sill plate anchorage use 3 /" diameter expansion anchors with 6" of embedment and spacing to match drawings. Ledger anchorage can be used with 3 /" diameter by 6" of embedment with spacing to match drawings. As discussed, anchor bolts for all holdowns will be embedded as shown on the construction documents. Sun i .. d By: '.';� Fl COPT ' Kevin . aplan, P.E. VLM ' Co - ulting Engineers cc: i if Tigard, Building Department Perlo McCormack Pacific Ankrom Moisen-Architects KMK:jjs • ,0 NC Eg h 1 Z wt O A a ° ouNo \ \SRV01 \Typing\Field Reports \TOC Office Addn. 11- 16- 00.Doc MEMBER