Loading...
Report Sent By: ; 503 682 2753; Oct -30 -02 4:51PM; Page 1/5 � w l Northwest Geotech, Inc. Northwest Geotech, Inc. • 9120 SW Pioneer Court, Suite B • Wilsonville, Oregon 97070 FACSIMILE TRANSMITTAL • • TO: Dave Fisher, VoiceStream Wireless 503- 232 -0519 FROM: Tom Ginsbach Cole Graves, Site Tech 503 - 650 -7378 Tom Fowler, Miller Consulting Engineers 503 - 736 -3014 Jim Jarrett, Valmont Microflect 503 - 316 -2040 NORTHWEST GEOTECH, INC. Building Department, City of Tigard (503) 682 -1880 PHONE (503) 682 -2753 FAX 503 - 684 -7297 9%1,22 � DATE AND TIME SENT NUMBER OF PAGES INCLUDING TRANSMITTAL 10/30/02 4:39 PM SPECIAL INSTRUCTIONS Per your request. Project No. 1053.46.2 VoiceStream — Greenway Site Daily Report of Inspection Activities: 1 Reinforced Concrete Inspection Report: C -1, C -2 Concrete Compression Test Report: C -2 (28 Day Breaksheet) CONFIDENTIALITY NOTE: The documents. accompanying this facsimile transmission contain information belonging to Northwest Geotech, Inc., d.b.a. Northwest Testing, Inc., which is confidential. The information is intended only for the use of the individual or entity named above. If you are not the intended recipient, you are hereby notified that any disclosure. copying, or other distribution of this information is strictly prohibited. If you have received this facsimile in error, please notify us by telephone for return of the original documents to us. Sent By: ; 503 682 2753; Oct -30 -02 4:52PM; Page 2/5 Northwest Geotech, Inc. _ 9120 SW Pioneer Court, Suite B • Wilsonville, Oregon 97070 5031682 -1880 FAX. 503 / 682 -2753 DAILY REPORT OF INSPECTION ACTIVITIES DATE: 09/30/02 I JOB NO 1053.46.2 PROJECT: VoiceStream — Greenway Site • REPORT NO. 1 LOCATION. 12394 SW Scholls Ferry Road • Tigard, Oregon PERMIT NO. BUP 2002 -00249 CONTRACTOR: Site Tech, Inc. OWNER: VoiceStream Wireless SUBJECT: WEATHER: I PRESENT AT SITE: Foundation Subgrade Inspection Showers THE FOLLOWING WAS NOTED: NGI arrived on -site, as requested, to inspect the pier foundation excavations for the two monopole towers on the west side of the building. The excavations were checked for diameter and depth of embedment. Both excavations were constructed with 3 feet diameter steel casing in the bottom 9 feet of the excavation and formed with 3 feet diameter sonotube in the upper approximate 4 feet. Embedment depths were measured to be approximately 10 feet and 11 feet below top of pavement for the south and north pier, respectively. The foundation plans call for a 3 feet diameter pier with a minimum embedment depth of 9 feet. NGI probed the bottom of the pier excavations and found on the order of 8 to 10 inches of loose soil (slough) in the excavations. Standing water was also present in both excavations. The contractor reported that the excavations were dry at the time of drilling and that the water was from runoff from the roof of the adjacent building. NGI recommended that the standing water and loose soil be removed prior to placement of the reinforcing steel and concrete. The contractor will call NGI for re- inspection of the excavation once the holes are cleaned ' out. NGI will also provide reinforcing steel inspection at that time. NGI returned to the site in the afternoon following cleaning of the excavations with a vacuum truck. The contractor reported that they removed as much loose material as they could, but water and soil subsequently washed into the excavation from below the casing during heavy rainfall. Probing of the excavations indicated approximately 12 to 16 • inches of loose soil was present in addition to several feet of water. The contractor attempted to dewater the excavations with a sump pump; however, this did not address the slough present in the excavation. The contractor elected to cancel the pour and will reclean the excavations tomorrow morning. FIELD REPRESENTATIVE: Wayne Olsen /Jim Woolf REVIEWED BY: Tom Glnsbach- COPIES TO: Dave Fisher, VoiceStream Wireless Cole Graves, Site Tech Tom Fowler, Miller Consulting Engineers Jim Jarrett, Valmont Microflect Building Department, City of Tigard REVISION(S) TO PREVIOUS DOCUMENT NOTED IN ITALICS C: \My Documents\Daily Reports\Project No. 1051 - 1099 \1 0 5 311 053.46 -2 \1053.46- 2jrp01.dodmki Effective Date: 1/14/00 Sent By: ; 503 682 2753; Oct -30 -02 4:52PM; Page 3/5 S Northwest Geotech, Inc. _ 9120 SW Pioneer Court, Suite B • Wilsonville, Oregon 97070 503/682 -1880 FAX: 503 / 682 -2753 REINFORCED CONCRETE INSPECTION REPORT JOB NO. 1053.46.2 PERMIT NO. PAGE OF BUP 2002 -00249 1 1 PROJECT PROJECT 12394 SW Scholls Ferry Road REPORT NO. NAME LOCATION VoiceStream - Greenway SUV _ Tigard, Oregon C -1 CLIENT OR GENERAL REPORT OWNER VoiceStream Wireless CONTRACTOR Site Tech, Inc. DATE 09/30/02 CONCRETE STRUCTURE Pier Foundations Adjacent to INSPECTION CONTRACTOR DATE Site Tech, Inc. West Side of Existing Building - 09/30/02 PLACEMENT RESULTS Met Project Requirements Concrete Mix ': N/A YES No NOTED: No concrete placed today Fresh Properties riia. YES NO NOTED: Handling and Plac .. : - ru _f YES NO NOTED: Batch to Discharge Times .:;:NIA.i • YES NO NOTED: Formwork N/A YES' NO NOTED: Concrete Reinforcement N/A YES NO NOTED: See Below Embedments & Anchor Bolts N/A YES ; No: :: NOTED: Remain to be placed Concrete Curing N/A YES NO NOTED: Foundation Conditions N/A YES .r. :No NOTED See Daily Report of Inspection Activities No. 1 (09/30/02) CON. WATER LOAD TICKET TRUCK NO. TEMP., BATCH SLUMP, AIR, ADDED, W/C NO. NO. NO. CY `F TIME INCHES % GALS RATIO PLACEMENT LOCATION 2 3 • 4 5 THE FOLLOWING WAS NOTED: NGI arrived on -site, as requested, to provide reinforced concrete inspection and a follow -up inspection of the subgrade conditions for the pier foundations. The subgrade conditions remained to be brought in accordance with the recommendations of the geotechnical report and the contractor elected to cancel today's concreting. While on -site, NGI provided an inspection of the cage reinforcement prior to its insertion into the foundation excavation. The reinforcing cage hoops had 4" extensions rather than the 5" extensions specified. This condition was discussed with and found acceptable by Jim Jarrett, Valmont Microflect. To the best of NGI's knowledge, the subject reinforcing cage was fabricated in general accordance with the project plans, specifications, pertinent codes, and the acceptance criteria of the design authority. NGI informed Cole Graves, Site Tech, and Dave Fisher, VoiceStream Wireless, of all observations. FIELD REPRESENTATIVE: Jim Woolf REVIEWED BY: Michael A. Ginsbach CERTIFICATION NO.: OBOA No. 381 COPIES TO: Dave Fisher, VoiceStream Wireless Cole Graves, Site Tech Tom Fowler, Miller Consulting Engineers Jim Jarrett. Valmont Microflect Building Department, City of Tigard REVISION(S) TO PREVIOUS DOCUMENT NOTED IN ITALICS C:WIy Documents \Daily Reports\Project No. 1051 - 1099\1053 \1053.46 -2 \1053- 46- 2c01.doc /mk1 Effective Date: 2/18/00 Sent By: ; 503 682 2753; Oct -30 -02 4:52PM; Page 4/5 • Northwest Geotech, Inc. _ 9120 SW Pioneer Court. Suite B • Wilsonville, Oregon 97070 503/682-1880 FAX: 603 / 682 -2753 REINFORCED CONCRETE INSPECTION REPORT JOB NO. 1053.46.2 PERMIT NO. PAGE OF BUP 2002 -00249 1 1 PROJECT —PROJECT 12394 SW Scholls Ferry Road REPORT NO. NAME LOCATION VoiceStream - Greenway SUV Tigard, Oregon C -2 CLIENT OR GENERAL REPORT OWNER VoiceStream Wireless CONTRACTOR Site Tech, Inc. DATE 10/01/02 CONCRETE STRUCTURE Pier Foundations Adjacent to INSPECTION CONTRACTOR Site Tech, Inc. West Side of Existing Building DATE 10/01/02 PLACEMENT RESULTS Met Project Requirements Concrete Mix N/A ' i NO NOTED: Wilsonville Concrete Mix No. 40600WA, 4000 psi Fresh Properties N/A YES `''NO'• NOTED: Slump exceeded mix design specification Handling and Placing N/A YES NO NOTED: Batch to Discharge Times N/A YES ''NO:_:. NOTED: See Below Formwork N/A "Ai': NO NOTED: Concrete Reinforcement N/A YE5';? NO NOTED: Embedments & Anchor Bolts N/A YES ::: :N6''` NOTED: See Below Concrete Curing N/A .`: 'YES NO NOTED: Foundation Conditions N/A ':;YES,:; NO NOTED. CON. WATER LOAD TICKET TRUCK NO. TEMP., BATCH SLUMP, AIR, ADDED, WIC NO. NO. NO. CY °F TIME INCHES X GALS RATIO PLACEMENT LOCATION 1 B61734 51 8 70 10:26 am 6% 4 3 - - North Pier Foundation 2 3 4 THE FOLLOWING WAS NOTED: _ NGI arrived on -site, as requested, to provide reinforced concrete inspection and subgrade inspection for the pier foundations. Loose soils and water were removed from the foundation excavation. NGI provided fresh properties tests and cast one set of four compressive strength test cylinders on the load delivered. The test cylinders were stored in insulated cure boxes on -site, overnight. The slump of the delivered load was 6 % ", exceeding the mix design requirements of 4 ± 1. The lower portion of the south pier anchor bolts were wet set. The batch to discharge time reached 21/2 hours; however, the concrete remained workable without a significant slump loss or temperature increase. To the best of NGI's knowledge, with the above noted exceptions, the reinforced concrete operations occurred in general conformance with the project plans, specifications, pertinent codes, and the acceptance criteria established by the design authority. NGI informed Cole Graves, Site Tech, of all test results and observations. FIELD REPRESENTATIVE: Jim Woolf REVIEWED RY: Tom Ginsbach CERTIFICATION NO.: OBOA No. 381 COPIES TO: Dave Fisher, VoiceStream Wireless Cole Graves, Site Tech Tom Fowler, Miller Consulting Engineers Jim Jarrett, Valmont Microflect Building Department, City of Tigard REVISION(S) TO PREVIOUS DOCUMENT NOTED IN ITALICS C:Wty Documents\Daily Reports \Project No. 1051 - 1099 \105311053 -46 -2 \1053- 46- 2CO2.docfmk1 Effective Date: 2118/00 Sent By: ; 503 682 2753; Oct -30 -02 4:53PM; Page 5/5 f Northwest Geotech, Inc. 9120 SW Pioneer Court. Suite B • Wilsonville, Oregon 97070 503/682 -1880 FAX: 503 / 682-2753 CONCRETE COMPRESSION TEST REPORT JOB NO. 1053.46.2 PERMIT NO. SET OF • BUP 2002 -00249 1 1 PROJECT PROJECT 12394 SW Scholls Ferry Road ACCOMPANIES NAME LOCATION REPORT NO. VoiceStream - Greenway SUV Tigard, Oregon C -2 . CLIENT OR GENERAL REPORT OWNER VoiceStream Wireless CONTRACTOR Site Tech, Inc. DATE 10/29/02 CONCRETE SAMPLE DATE CONTRACTOR Site Tech, Inc. LOCATION North Pier Foundation CAST 10/01/02 28 DAY STRENGTH: 28 DAY STRENGTH: 4 METHOD: ASTM REQUIRED, PSI 3000 AVERAGE, PSI C SAMPLE DATE AGE, DIAMETER, AREA, TOTAL LOAD, COMPR. STR., FAILURE TESTED ID TESTED DAYS INCHES SQ.IN. LB's PSI TYPE' BY 558 A 10/08/02 7 6.01 28.37 100,060 3530 - - DS B 10/29/02 28 6.01 28.37 119,120 4200 - - DS C 10/29/02 28 6.01 28.37 121,220 4270 - - ` DS D H E • FRESH PROPERTIES TEST DATA - (OTHER THAN CONICAL) ITEM INFORMATION 'Project Requirements ITEM INFORMATION SLUMP, C143; - CAST BY INCHES 6% 4 t 1 J. Woolf AIR CONTENT. TIME CAST C231; % 4 Not Required 12:30 pm - CONCRETE TEMP: UNIT WEIGHT; C1084. "F 70 50 — 90 C138; PCF - - AMBIENT YIELD, C138 yd' TEMPERATURE, °F 58 - - - - NO. DAYS FIELD SAMPLING METHOD ASTM CURE 1 2 Max C172 SUPPLIER DATA ITEM INFORMATION 'Project Requirements ITEM INFORMATION MIX NO. 406001 WA 3000 psi SUPPLIER Wilsonville Concrete LBS TICKET PERCY -- 564 _ NUMBER B61734 WIC TRUCK RATIO - - 0.45 Max NUMBER 51 . HOT NUMBER 8 WATER No - - OF CY ADMIX Polyheed 997, Polyheed 997, BATCH ME Air Entrainment Air Entrainment 10:26 am . WATER ADDED (Based on W/C) TYPE I — I l ON SITE (GALS) METHOD • OF MLX TRANSIT THE FOLLOWING WAS NOTED: . "Project Requirements are based on provided mix design. "Slump exceeds mix design specifications. FIELD REPRESENTATIVE: Jim Woolf REVIEWED BY: Tom Ginsbach •"1A_ [b CERTIFICATION NO.: OBOA No. 381 COPIES TO: Dave Fisher, VoiceStream Wireless Cole Graves, Site Tech Tom Fowler, Miller Consulting Engineers Jim Jarrett, Valmont Microflect Building Department, City of Tigard _ REVISION(S) TO PREVIOUS DOCUMENT NOTED IN ITALICS C:WIy Documents\Dally Reports \Project No. 1051 - 1099 \105311053-46-2 \1053-46-2c02.doc./mkl Effective Date: 2118/00