Loading...
Permit CITY OF TIGARD BUILDING PERMIT N.:. COMMUNITY DEVELOPMENT Permit #: BUP2012 -00148 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 07/25/2012 Parcel: 2S101 DA01400 Jurisdiction: Tigard Site address: 7160 SW FIR LP 100 Project: Marco) Building Subdivision: 72ND BUSINESS CENTER Lot: 4 Project Description: Structural repair due to vehicle impact. Contractor: ASPEN RIDGE CONSTRUCTION INC Owner: HUG, BILLIE JANETTE EVANS 7910 SW HUNZIKER ST 1152 TROON TIGARD, OR 97223 LAKE OSWEGO, OR 97034 PHONE: 503 - 624 -9060 PHONE: FAX: 503 - 624 -3632 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: REP Type of Const: Permit Fee - Additions, Alterations, 07/25/2012 $408.32 Demolition Occupancy Grp: Occupancy Load: 12% State Surcharge - Building 07/25/2012 $49.00 Dwelling Units: 0 Plan Review 07/25/2012 $265.41 Stories: 0 Height: 0 ft Info Process /Archiving - Sm $0.50 (up to 07/25/2012 $1.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $22,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $723.73 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be do - - -- •• -.nce with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 d -. -. ATTENTION: • =,on law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 2- 001 -0010 through OAR • - . . • -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: � /� Permittee Signature: Call 503.639.4176 by 7:00 a.m. for the next available Inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. • Building Permit Application Commercial RE(1VED of Tigar DD at e/B : I 01:1:1C1: Permit No.:Ib�� (8.∎• D tiq, I II n 13125 SW Hall Blvd., Tigard,OR 9 Plan Review �� C Phone: 503.718.2439 Fax: 503.5902 5 2 0 1 2 Date/By: Other Permit: Tic; A K 0 Inspection Line: 503.639.4175 Date Ready/By: Mris: ® See Page 2 for Internet: www.tigard or.gov CITY CF T CARD Notified/Method: Supplemental Information B 'J5L 09G MISIOP' TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling Commercial/industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 'l ((00 5V-) F1 g_ ur.,tJP New dwelling area: square feet City/State /ZIP: 71 6,0 2- p (L Garage /carport area: square feet Suite/bldg. /apt. no.: Project name: Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: I Lot no.: Permit fees' are based on the value of the work performed. Tax map /parcel no.: Indicate the value ( routded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. 2EPAI� WALL F�1�1.r1Ca A■ To Valuation: $ 22 11 Ei t GUl L r' PAc.T Existing building area square feet New building area: square feet ❑ PROPERTY OWNER ❑ TENANT Number of stories: Z Name: Type of construction: NI .A Address: Occupancy groups: City /State /ZIP: Existing: Phone:( ) Fax:( ) New: I2li APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES" Business name: WEST - k �(�C}- 1-rTEC_TURA�-- (Pleasere(ertojeeschedule) Structural plan review fee (or deposit): Contact name: Ei>1lJAl_p cp./Not, iv...3C, v-v P, E • FLS plan review fee (if applicable): Address: (OZ•CA=> Sv--) Cw.f— e7T1$Ut?Cs 1. Total fees due upon application: City/State /ZIP: p 712. C> g. $70/373 Phone: n Amount received: (SD3) Zi - 7 - (o(c7 Fax:: ( ) E -mail: e t= e t,. s4 rv■artL t�c 4- i_ et t. c e 1 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES" CONTRACTOR Corinne • I and residential prescriptive installation o roof -top mo red PhotoVoltaic Solar Panel Syst . Business name: gb.,5 f--N C.,( Ids Submit two (2) is of roof plan with connec • .n details and fire departmen ccess, along with • , 010 Oregon Address: Z G1 I 0 S W Nc- NZ t ` _ g. D Solar Installation Spec Code c . ist. Ci City/State/ZIP: Permit fee (include . _• - view tY Tic, /k�C) c, � $180.00 and admini . - ees): Phone: (So3 ) (p2,4 -- yO(,oC) l Fax: ( ) State surcharge o of permit fee . $21.60 CCB lic.: 1G G99 e 9/ i I Total fee due upon application: $201.60 Authorized signature: ature: This permit application expires if a permit is not o . tamed �� 2 within 180 days after it has been accepted as complete. Print name: Cy-1,7 b Q vQ t Date: -? - Z S — / Z • Fee methodology set by Tri -County Building Industry J Service Board. I: \Building\Permits\BUP -COM PermitApp.doc 02/24/2011 440- 4613T(l I /02/COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to • • the overall alteration when the cost exceeds twenty-five per -cent (25 %). • VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements.shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) • When possible, additional accessible elements such as storage and • alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ 1: \ Building \ Permits \BUP -COM PermitApp.doc 03/03/2011 • I Building Division e Plan Submittal Requirements T G A R D Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011 . ' PI e Building Division Plan Submittal Requirement Matrix T G n R D Commercial & Multi- Family - New, Additions or Alterations . Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal • Demolition Permit 3 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 I Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 • Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue), if applicable. I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011