November 18, 1997
City of Tigard Bureau of Buildings
Attention: Mr. George Steel
1120 S.W. Fifth Avenue
Portland, Oregon 97207 -8120
•
Re: Final Summary Report
Greenway Town Center
tn 00 Project Number 197190
N
N N
•
Q O
x Dear Mr. Steel:
v w
E The purpose of this letter is to certify that periodic structural observation of the above - captioned
Y project was performed in accordance with Section 1702 of the Oregon Structural Specialty Code. To
M the best of my knowledge, no unresolved discrepancies remain, and the work is in acceptable general
o. a conformance with the plans and specifications. No special inspection was required by the plans and
m
0 0
specifications.
0
Sincerely,
ro
V u)
41Mhdt.
N
'
cn M
N
Laurence B. Oeth III P.E.
O UI
o F
LBO /eg
Group c: Mark Boshears - Commercial Building Services, Inc.
Mackenzie, Steven Burg - Mercury Development
Incorporated Jim Funk - City of Tigard
Architecture
•
Interior Design
Land Use Planning
Group
Mackenzie
Engineering,
Incorporated
Civil/Structural
Engineering
Transportation '
Planning
The tradition of
Mackenzie
Engineering and
Mackenzie /Saito
continues.
K: \WPDATA\97 -11 \97190\18L I .E0
&IA-1 - or) 3..25
COMMERCIAL
BUILDING
SERVICE, INC.
I
August 18, 1997
Mr. Jim Funk
Plans Examiner
City Of Tigard
13125 SW Hall Blvd.
Tigard, Or. 97223
Re: ADA Improvements
Following is the estimated costs for the ADA improvements
at Greenway Town Center. The total cost exceeds the twenty five
percent allowance for the tenant improvement at 12266 SW Scholls
Ferry Rd. (Sew n Vac space) The allowance for this project totals
$1,625.00, the overall upgrades projected will be over $9,875.00
It is my understanding that this study and corresponding ADA
upgrades on the exterior will be in replacement of the ADA restroom
upgrade as indicated under permit, # RUP1`7vP.5' The difference of
$8,250.00 will be applied towards the structural beam and buildin
repairs already under permit. These repairs will replace the
restroom upgrade that is currently under permit.
I have forwarded this information to Larry Oeth of Group
Mackenzie and to Steve Burg of Mercury Development. Thank you for
your considerations in this matter.
Sincerely,
mo
kia_ g_ Y�
Mark D. Boshears
Operations
727 WARREN STREET • OREGON CITY, OR 97045 • OFFICE: (503) 657 -5377 • FAX: (503) 655-8164
• 7
G R O U P
-- �N�ACKENZIE
August 7, 1997
City of Tigard
Attention: Jim Funk
13125 SW Hall Boulevard
Tigard, OR 97223 -8199
RE: Greenway Town Center ADA
M cc,
Project Number 197190.02
O N
O N
N Dear Jim:
c ci
n M
O O
Ti w This letter will serve as confirmation of items we discussed yesterday regarding improvements at the
E Greenway Town Center. Enclosed is a table indicating the specific tasks which we will engineer and
. a preliminary cost estimate for each. Included is the estimated engineering cost associated with those
M E tasks and half of the overall ADA survey which we are completing.
0.
o Mark Boshears will file for permit as soon as we have completed and reviewed the drawings, which
o E we hope will occur in 2 -3 weeks.
v
Z
I hope this provides adequate information so that you are able to release the repair permits, subject to
Mercury Development completing the above tasks in a timely manner.
m N
N If you have questions or require further information, please do not hesitate to call.
_
v
O F
Sincerely,
i t
, �
Group . ,--
Mackenzie. 4
Incorporated Laurence B. Oeth, P.E.
LBO /sk
Group Enclosure
Mackenzie
Engineering.
Incorporated c: Steven Burg - Mercury Development
Mark Boshears - Commercial Building Services
Bill Bezio - Group Mackenzie
?' Inn r
The tradition of
Mackenzie
Engineering and
Mackenzi,Sarto
continues
K. \WPDATA\97 -08\97190.02 \07L I SK