August 7, 1997
City of Tigard
Attention: Jim Funk
13125 SW Hall Boulevard
Tigard, OR 97223 -8199
RE: Greenway Town Center ADA
NI • N Project Number 197190.02
O N
N
Dear Jim:
0. O
r)
o
This letter will serve as confirmation of items we discussed yesterday regarding improvements at the
E Greenway Town Center. Enclosed is a table indicating the specific tasks which we will engineer and
• . a preliminary cost estimate for each. Included is the estimated engineering cost associated with those
E tasks and half of the overall ADA survey which we are completing.
c a.
O ch
o o Mark Boshears will file for permit as soon as we have completed and reviewed the drawings, which
o we hope will occur in 2 -3 weeks.
in z
o I hope this provides adequate information so that you are able to release the repair permits, subject to
Mercury Development completing the above tasks in a timely manner.
m N
If you have questions or require further information, please do not hesitate to call.
o _
`O W
O F
Sincerely,
IP'
Group r /AM *Am.- Mackenzie, 4 / ��
Incorporated Laurence B. Oeth, P.E.
LBO /sk
Group Enclosure
Mackenzie
Engineering,
Incorporated c: Steven Burg - Mercury Development
. . Mark Boshears - Commercial Building Services
Bill Bezio - Group Mackenzie
3nn
The tradition of
Mackenzie
Engineering and
Mackenzie,Saito
continues.
K: \WPDATA\97 -08197190.02 \07L 1. SK
ESTIMATED ENGINEERING COST
GREENWAY TOWN CENTER ADA
Engineering Design and 50% ADA Review $3,125
Accessible Curb Ramp @ 2 Parking Spaces fronting Howards $1,000
Restripe Same 2 Spaces and Aisle $500
Signage @/around Same Location (replacing 2, reposting 1) $750
Existing 13' -wide parking stall, restripe entire area to a handicap, $500
plus aisle (15), plus 4 other compact spaces at 8'
2 existing Howards ramps, add tactile warning $500
Routing identification signs on sidewalk, generally in front of $500
Howards and extending south
Correct stall with 2.7% cross slope in front of Maytag, including $3,000
curb; remove and repave to level, signage, and painting
TOTAL $9,875
K. \WPDATA\97 -08\97190.02 \07L I.SK
e..(A-fi 9 7- avo
COMMERCIAL
BUILDING
SERVIC4 INC.
July 1, 1997
Greenway Town Center
12220 SW SCHOLLS FERRY RD
TIGARD, OR. 97224
RE: Space #12266 - NW Sew N Vac
Item: Storefront Replacement
Replace existing aluminum frame and single pane glass store-
front with the following:
1) 25 lineal feet of storefront, ten feet high (approximate)
2) Metal US Aluminum Series 451 Insulated System # 125 Bronze
w/ Horizontal at 24" to bottom
Two 30 US Aluminum doors with offset pivot, push pull
hardware, ADA surface mounted closer w /lock indicator 6 .
thumb turn
3) All Glass to be 1" OA Insulated Glass (tempered)
1/4" grey or Bronze over 1/4 Low E Temp
Currently space is occupied by retail sewing and vaccuum store.
Front windows are used to display merchandise. The old storefront
will be removed and the new one installed.
I hope that the above information is satisfactory.
Sincerely,
Mark D. Boshears
Operations
727 WARREN STREET • OREGON CITY, OR 97045 • OFFICE: (503) 657 -5377 • FAX: (503) 655 -8164
• ,���r�r -y°9 7- ov�of
, J
COMMERCIAL
BUILDING
SERVICE, INC.
August 18, 1997
Mr. Jim Funk
Plans Examiner
City Of Tigard
13125 SW Hall Blvd.
Tigard, Or. 97223
Re: ADA Improvements
Following is the estimated costs for the ADA improvements
at Greenway Town Center. The total cost exceeds the twenty five
percent allowance for the tenant improvement at 12266 SW Scholls
Ferry Rd. (Sew n Vac space) The allowance for this project totals
$1,625.00, the overall upgrades projected will be over $9,875.00
It is my understanding that this study and corresponding ADA
upgrades on the exterior will be in replacement of the ADA restroom
upgrade as indicated under permit # 1UPTj703d.s The difference of
$8,250.00 will be applied towards the structural beam and building
repairs already under permit. These repairs will replace the
restroom upgrade that is currently under permit.
I have forwarded this information to Larry Oeth of Group
Mackenzie and to Steve Burg of Mercury Development. Thank you for
your considerations in this matter.
Sincerely,
/nom-
Mark D. Boshears
Operations
727 WARREN STREET • OREGON CITY, OR 97045 • OFFICE: (503) 657 - 5377 • FAX: (503) 655 -8164
COMMERCIAL
BUILDING
SERVIcI INC.
7 July 1, 1997 OAA 9-7-02-0L/
Greenway Town Center
12220 SW SCHOLLS FERRY RD
TIGARD, OR. 97224 '-q-eA}t-y--ito
i
RE: Space # 226: - NW Sew N Vac
Item: Storefront Replacement
Replace existing aluminum frame and single pane glass store-
front with the following:
1) 25 lineal feet of storefront, ten feet high (approximate)
2) Metal US Aluminum Series 451 Insulated System # 125 Bronze
w/ Horizontal at 24" to bottom
Two 3070 US Aluminum doors with offset pivot, push pull
hardware, ADA surface mounted closer w /lock indicator &
thumb turn
3) All Glass to be 1" OA Insulated Glass (tempered)
1/4" grey or Bronze over 1/4 Low E Temp
Currently space is occupied by retail sewing and vaccuum store.
Front windows are used to display merchandise. The old storefront
will be removed and the new one installed.
I hope that the above information is satisfactory.
Sincerely,
Mark D. Boshears
Operations
727 WARREN STREET • OREGON CITY OR 97045 • OFFICE: 15031 657 -5377 • FAX. (503) 655 -8164