Permit CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: 5 / 0 6 1 A.M. P.M. MST:
Location: .r a ` , „:_,.I�l � __k _ v BUP:
Tenant: /rr " 7 / 3 TP---' , Suite: Bldg: MEC:
Contractor: - W FPO (IA-LC: Phone: < 3 3- 7 ? 0 I PLM:
Owner: Phone: / b ELC: U -�V I / r
.5______,12,A A /Yl r i G'LA e^ I i 411 ELR:
SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL (ELECTRICAL.) SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved : �� Approved
Appr /Sdwlk Not Approved Not Approved Not Approved • oved Not Approved
FINAL FINAL FINAL FINAL FINAL
)4 41/0 ,k / cl e?,.,../0,1‘ //0 v /0 ._..‘erg./(z
/ .1-14,/— Q ss
(5 -, M __ - E -. -)
O Call for reinspection einspection fee of $ required before next inspection 0 Unable to inspect
Inspector: L4
Date: C� =� d rL ? of
•
•
•
3/6/00 Activities for Case #: ELC98 -00112
11:40:48 AM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
ELCC001 Application received 3/9/98 B RECD - BON 3/9/98
ELCC003 Permit created 3/9/98 B DONE BON 3/9/98
ELCC730 Elect'I Service 3/9/98 5/20/98 BRP PASS J *H 5/26/98 Rework and addition to existing
- approved.
ELCC799 Elect'I Final 3/9/98 5/20/98 BRP PASS J *H 5/26/98
ELCC500 (F)Issue permit 3/9/98 B PASS BON 3/9/98 Mailed this date
ELCC800 Case Finaled 5/26/98 BRP PASS J`H 5/26/98
•
•
•
•
•
•
•
•
•
•
Page . 1 of 1