Permit A CITY OF TIGARD P #N B UP
PERMIT
00 00158
t DEVELOPMENT SERVICES DATE ISSUED: 5/2/02
�'�' A�' I 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171
SITE ADDRESS: 06900 SW SANDBURG ST PARCEL: 2S101 DD -00702
SUBDIVISION: SALEM FREEWAY SUBDIVISION ZONING: I -P
BLOCK: LOT: 004 JURISDICTION: TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: OTR FIRST: sf N: S: E: W:
TYPE OF USE: COM SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: UNK : sf N: S: E: W:
OCCUPANCY GRP: B TOTAL AREA: 0.00 sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING:
VALUE: $ 25,000.00
Remarks: Tear off to existing insulation, cap sheet surfacing.
Owner: Contractor:
J + K PROPERTIES CORP SNYDER ROOFING OF OREGON LLC
6900 SW SANDBURG RD PO BOX 23819
TIGARD, OR 97223 TIGARD, OR 97281
Phone: Phone: 620 -5252
Reg #: LIC 135987
FEES REQUIRED INSPECTIONS
Type By Date Amount Receipt Roof Nailing Insp
PRMT CTR 5/2/02 $283.30 27200200000 Dryrot After Tear -Off Insp
C:3
Final Inspection
5PCT CTR 5/2/02 $22.66 27200200000
Total $305.96 E P,RED
IIIPRIWIF
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR %
952 - 001 -0010 through OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by O
calling (503) 246 -6699 or 1- 800 - 332 -2344.
Pe rrn ittee
(::),
Signature: (tr 6_,p43,6 cu,' 1.- •
Issued B
Call 6394175 by 7 p.m. for an inspection the next business day °I
11610
BUP - Building Permit ELC - Electrical Permit
Inspection Description Date Passed By J' Inspection Description Date Passed By
Footing /Setback Underground cover
Foundation walls Wall cover
_ Footing drain Ceiling cover
Waterproof bsmt walls Electrical rough -in
Slab Electrical service
Crawl drain Electrical final
Underfloor insulation
Post/beam structural
Shear walls /anchors ELR - Restricted Energy Permit
Roof nailing Inspection Description Date Passed By
Firewall Low voltage
Tilt -up panel Electrical final
Masonry /Reinforcement
Framing
MFG - Structure set -up MEC - Mechanical Permit
Insulation
Drywall nailing 11 Inspection Description Date Passed By
Post/beam mechanical
Suspended ceiling Gas line
Engineered soils Mechanical rough -in
Welding Lab Final Fire damper
_ Concrete Lab Final Duct work
Bolting Lab Final Smoke detector
Structural observation Mechanical final
• Fireproofing Lab Final
Final inspection
PLM - Plumbing Permit
BUP — Fire Protection System Permit Inspection Description Date Passed By
Plumbing underslab
I I Inspection Description Date Passed By Crawl drain
Sprinkler underfloor /slab _ Post/beam plumbing
Sprinkler rough -in Plumbing top -out
Sprinkler final RP /backflow preventer
Fire alarm final • Rain drain
Storm drain
_ Water service _
SIT - Site Permit Sanitary sewer
Inspection Description Date Passed By _ Culvert/catch basin
Footings Pump /fill septic tank
Foundation walls Plumbing final
Sprinkler supply lines
Sprinkler underfloor /slab _ _
Catch basin /Manhole SWR - Sewer Permit
Engineered soils I Inspection Description Date Passed By
Engineering acceptance Sanitary sewer
Final inspection Final inspection
Inspection Record - BUP, PLM, SWR, ELC, ELR, MEC, SIT Permits
is \dsts \forms \InspRecordBUP.doc 04 /17/01