Loading...
Permit A CITY OF TIGARD P #N B UP PERMIT 00 00158 t DEVELOPMENT SERVICES DATE ISSUED: 5/2/02 �'�' A�' I 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 SITE ADDRESS: 06900 SW SANDBURG ST PARCEL: 2S101 DD -00702 SUBDIVISION: SALEM FREEWAY SUBDIVISION ZONING: I -P BLOCK: LOT: 004 JURISDICTION: TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: OTR FIRST: sf N: S: E: W: TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: UNK : sf N: S: E: W: OCCUPANCY GRP: B TOTAL AREA: 0.00 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 25,000.00 Remarks: Tear off to existing insulation, cap sheet surfacing. Owner: Contractor: J + K PROPERTIES CORP SNYDER ROOFING OF OREGON LLC 6900 SW SANDBURG RD PO BOX 23819 TIGARD, OR 97223 TIGARD, OR 97281 Phone: Phone: 620 -5252 Reg #: LIC 135987 FEES REQUIRED INSPECTIONS Type By Date Amount Receipt Roof Nailing Insp PRMT CTR 5/2/02 $283.30 27200200000 Dryrot After Tear -Off Insp C:3 Final Inspection 5PCT CTR 5/2/02 $22.66 27200200000 Total $305.96 E P,RED IIIPRIWIF This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR % 952 - 001 -0010 through OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by O calling (503) 246 -6699 or 1- 800 - 332 -2344. Pe rrn ittee (::), Signature: (tr 6_,p43,6 cu,' 1.- • Issued B Call 6394175 by 7 p.m. for an inspection the next business day °I 11610 BUP - Building Permit ELC - Electrical Permit Inspection Description Date Passed By J' Inspection Description Date Passed By Footing /Setback Underground cover Foundation walls Wall cover _ Footing drain Ceiling cover Waterproof bsmt walls Electrical rough -in Slab Electrical service Crawl drain Electrical final Underfloor insulation Post/beam structural Shear walls /anchors ELR - Restricted Energy Permit Roof nailing Inspection Description Date Passed By Firewall Low voltage Tilt -up panel Electrical final Masonry /Reinforcement Framing MFG - Structure set -up MEC - Mechanical Permit Insulation Drywall nailing 11 Inspection Description Date Passed By Post/beam mechanical Suspended ceiling Gas line Engineered soils Mechanical rough -in Welding Lab Final Fire damper _ Concrete Lab Final Duct work Bolting Lab Final Smoke detector Structural observation Mechanical final • Fireproofing Lab Final Final inspection PLM - Plumbing Permit BUP — Fire Protection System Permit Inspection Description Date Passed By Plumbing underslab I I Inspection Description Date Passed By Crawl drain Sprinkler underfloor /slab _ Post/beam plumbing Sprinkler rough -in Plumbing top -out Sprinkler final RP /backflow preventer Fire alarm final • Rain drain Storm drain _ Water service _ SIT - Site Permit Sanitary sewer Inspection Description Date Passed By _ Culvert/catch basin Footings Pump /fill septic tank Foundation walls Plumbing final Sprinkler supply lines Sprinkler underfloor /slab _ _ Catch basin /Manhole SWR - Sewer Permit Engineered soils I Inspection Description Date Passed By Engineering acceptance Sanitary sewer Final inspection Final inspection Inspection Record - BUP, PLM, SWR, ELC, ELR, MEC, SIT Permits is \dsts \forms \InspRecordBUP.doc 04 /17/01